Due to old Toshiba EMS's database size limit and hardware old aging, KPX(Korea Power Exchange) had introduced New EMS from AREVA(old ALSTOM) in July 2002. After then KPX had committed many man power and time to normalize EMS NA(Network Analysis) functions for using real power system. At initial stage, to normalize State Estimator which is the backbone of all other NA functions and DTS(Dispatcher Training Simulator}, KPX had corrected numerous topology errors, network model errors, non-scanned and wrongly scanned SCADA measured errors. After SE function study, running test and tuning, State Estimator could finally have been run properly and stably from June 2003. Based on SE running, KPX had normalized real time Contingency Analysis, and study mode Power Flow, STNET and DTS. From early 2004, dispatchers have been trained to use NA and DTS for the purpose of stable SE running, NA operation & results reading and urgent equipment outage reviewing. EMS NA have been greatly contributed to operate real time power system stably. Above NA normal operation by KPX own efforts under the no experience of NA running, KPX made a good precedent. This paper is intended to introduce EMS NA normalization process, operation status, and etc in Korea power system operation.