In the design of general hydrological structures, it is well know that the design flood is of importance in the design of those structures. As the design flood is estimated using the design storm, the design storm is defined by the rainfall intensity itself. Though I had studied and reported many times the reports about the rainfall-intensity in my country, poorly I did not study the long-period variation of the intensity through each section in my country before. But now, in the basin area of the Han river and the Keum river, the self-recorded rainfall charts of the single storms, which are mostly above rainfall amount of 30mm and data of about 4500 with the 150 stationyear, were analyzed, And then, the intensity formula of the hourly unit is estimated using the period from 10 minutes to 5 days. The method to analyze and estimate them, and the final results will be summarized as mentioned below: (i) At first I intended to select out the homogeneous watersheds of three, one in the Han river and two in the Keum river. But I would select the northern and the sourthern river basins, and westward from Koan station, in the basins of the Han river. Also I would select the upstream area, and the downstream area including the watershed of Chungioo, Kongjoo, Chupungryung, and the Mt. Sock, in the basins of the Keum river. Finally, I could find that there couldn't in the Keum river basin. So, I decided out and analyze only river basins of the Han river with limitation mentioned above. (ii) The statistical method to select out the homogenous watersheds is the test of homogeneous variance, and it is estimated from the following equation: $$X_{k1}^2=[{\Sigma}(n_i-1)log\bar{S^2}-\Sigma(n_i-1)log\bar{S^2}]{\times}loge$$ (iii) Actually, each homogeneous watershed has individually its own intensity formula, But I would express them as the actual amount, because the equation of intensity variance is experiential and theoretical equation of the variance. Therefore the caluating equation is actually more convenient in the actual uses. (iv) This report is one of the series for me to give the basis to the actual designs. The cost for this study is provided by the Ministry of Construction. And the designs of the hydrological structures in the watersheds with limitation mentioned above may be concerned with and based upon this report.