To find a lateral long term behavior of driven H-piles in embankment, inclinometer is installed at pile and measurement is done during a year. When behavior of measured slope angles is in accord with behavior of nonlinear p-y curves(Reese, Murchison and O'Neil, Matlock's p-y analysis), maximum displacement of pile head, maximum stress and maximum bending moment of pile obtained from the numerical analysis are shown. As results, maximum lateral displacement at pile head, maximum stress and maximum bending moment of pile are shown linear behavior, And maximum lateral load, maximum lateral displacement, and maximum bending moment at pile obtained from the numerical analysis are 8∼12.4tonf, 9∼10.1㎜, and 10.39∼12.67tonf-m per pile according to the curves, respectively.