The jointing method of PC pile installation, which utilizes steel sleeve, is most popular for the deep bearing stratum( deeper than 15m ) or the irregular bearing stratum depths. However, this method has some difficulties in safety because there is no optimum standards of steel sleeve. This research attempts to determine the optimum standard of steel sleeve for 350mm PC pile, which is most widely used, through bending moment test designated by KS and numerical analysis using finite element method. According to the results, the optimum length of steel sleeve is three times longer than diameter of pile, and the thickness of steel sleeve is more than 2.5mm.