• 제목/요약/키워드: man-hour management system

검색결과 20건 처리시간 0.023초

IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례 (A study of actual planning how to increase IT productivity by COCOMO II Model)

  • 박철구;김창은
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구 (Improved Scheme to Manage Engineering Man-hour in a Plant Project)

  • 신지로;문승재;이재헌
    • 플랜트 저널
    • /
    • 제5권1호
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

MODAPTS 기반 자동차 조립공정 공수 산정에 관한 연구 (A Study on the Man-Hour Computation Based on MODAPTS in Automobile Assembly Line)

  • 이창호
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.65-70
    • /
    • 2021
  • Domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. In this study, we developed a program to effectively manage standard time of automobile assembly line, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour for automobile assembly line.

여성 재킷의 생산능력 설정을 위한 연구 (A Study on the Productive Capacity Setting of Women's Jacket)

  • 김진선;심규남;오순
    • 한국의류산업학회지
    • /
    • 제13권2호
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

시스템 개선에 의한 생산성 향상 효과 분석 (An Effect Analysis for Productivity Elevation by the System Improvement)

  • 김대식
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.113-123
    • /
    • 2010
  • The goal of this study is to analyze an effect of productivity elevation. For the goal, the various methods of the productivity elevation were suggested and the system improvements were conducted. The S company was established in Ban-Wol Industrial Complex, Ansan-City, Kyonggi-Do on 2007. The company was hiring 22 employees. The main manufactures were heavy duty equipment parts and the amount of sale was two billion won on 2008. Problems which the company faced were ambiguous production target management and materials loss. To solve the problems, NCT work improvement and automatic welding were induced. There were steel saving of 3,780,000won/month and man-hour saving of 144,000won/month by redesign of the steel sheet for the NCT steel job. Also, changing from handwork to automatic welding, the man-hour saving for the welding job was 320M/H and saving of 4,225,600won/month. The others of systematic improvement for productivity elevation were usage of jig and daily equipment checklist.

MODAPTS 기반 자동차 조립공정 부품공급 공수 산정에 관한 연구 (A Study on the Material Supply Man-Hour Computation based on MODAPTS in Automobile Assembly Line)

  • 장정환;장청윤;전욱;조용철;김유성;배상돈;강두석;이재웅;이창호
    • 대한안전경영과학회지
    • /
    • 제18권3호
    • /
    • pp.127-135
    • /
    • 2016
  • Korean automobile industrial is in a difficult situation because of more competitive global market and lower demand. Therefore, domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. According to statistical data, logistics cost in domestic manufacturers is higher than advanced countries. In this study, we developed program to effectively manage standard time of procurement logistics, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour. Program is not just for calculating and managing standard man-hour, scenarios analysis function will be added to calculate benefit while introduce logistics automated equipment. In this study we propose scenario using AGV instead of electric motor while move component. In the scenario analysis, job constitution is changed, and then we use system to compare the result. We can confirm standard man-hour is reduced from 22.3M/H to 14.3M/H. In future research, it is necessary scenario analysis function, and develop algorithm with realistic constraint condition.

연구원 만족도 분석을 통한 연구개발 관리제도의 개선 - 산업계 연구기관을 중심으로 - (Improving R&D Management System through Researchers′ Satisfaction Analysis, with Special Reference to Industrial R&D Institutes)

  • 김계수;이민형
    • 기술혁신학회지
    • /
    • 제1권3호
    • /
    • pp.299-312
    • /
    • 1998
  • This paper explores the possibility of improving R&D management system through researchers' satisfaction analysis. The relationship between job satisfaction and performance has traditionally been one of the engaging topics in organization psychology. However, the research results of the past showed the relatively low level of correlation between satisfaction and performance at the individual level. In contrast to these past research results, recent research results on this relationship at the organizational level revealed the higher correlation between these two factors, The present study extends this 'satisfaction and performance' hypothesis to the development and improvement of R&D management system. That is, we used the results of researchers' satisfaction analysis to devise appropriate criteria for the design and implementation of more effective R&D management systems. This paper seeks to show that we can make fruitful use of researchers' satisfaction analysis in order to choose a more effective one among alternative R&D management systems.

  • PDF

CM 산업 발전을 위한 정책 및 과제 추진 방안 (Policies and Tasks for Improving Korean CM Industry)

  • 강승희;정영수;김남준;신동우
    • 한국건설관리학회논문집
    • /
    • 제15권5호
    • /
    • pp.71-81
    • /
    • 2014
  • 국내 건설투자가 점차 감소되는 환경 변화 속에서 해외 CM시장으로의 진출에 대한 중요성이 대두되고 있으며, 성공적인 CM시장의 진출 확대를 위해서는 건설사업 생애주기 관점에서의 CM 업무기능의 역량 강화가 요구된다. 본 연구에서는 CM산업 제도변화를 고찰하고, 생애주기별 CM업무 비중을 분석하였다. 분석 결과, 국내공공 CM사업은 시공단계에 업무 투입 노력이 78%이상 집중되어 시공전단계의 기술경쟁력 축적을 제도적으로 저해하고 있는 현실이다. 즉, 우리나라 CM기업이 해외시장 진출을 위한 생애주기관점에서의 기술 경쟁력 확보를 위해서는 CM기업 자체적인 역량 향상 노력도 중요하지만, 이에 못지않게 '인력배치 기준' 등에 대하여 유연성을 보장하는 제도적인 뒷받침이 필요하다. 이러한 배경에서, 본 연구에서는 '경직된 인력배치기준의 개선', '비합리적 CM대가기준의 개선', 'CM선정방식의 개선', '불합리한 업무범위 결정의 개선', '발주자 사업관리 역량 평가'와 같이 5가지 측면에서 우리나라 CM산업의 발전 및 해외시장 진출 확대 기반 마련을 위한 정책 및 제도 개선방안을 제시하였다.

철골 구조물의 통합 설계 시스템 (Integrating drafting with analysis and design of framed steel structures)

  • 김홍국;이병해
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1991년도 가을 학술발표회 논문집
    • /
    • pp.127-132
    • /
    • 1991
  • The purpose of this study is to integrate a structural design Process of framed steel structures. It is composed of analysis, design, drafting and construction management. However each step of these works involved with a large amount of data and man hour resources. The aim of this study is to alleviate time consuming efforts mentioned above by integrating the different stage of works. Very successful results have been achieved by setting up a common database in whole process and applying the techniques of knowledge base system.

  • PDF

유연근무가 조직과 직무성과에 미치는 긍정적인 영향에 대한 연구 (M사 시차출퇴근 제도 도입 사례 중심으로) (Research on the positive impact of flexible work on organization and job performance (The case of introduction of M company time difference commuting system))

  • 이희;이만수
    • 대한안전경영과학회지
    • /
    • 제19권4호
    • /
    • pp.253-260
    • /
    • 2017
  • Due to dramatic changes in the trend of corporate management in economics, labor and government, companies are being asked to adapt creative and innovative organizational culture in order to keep sustainability. Under the circumstances, flexible working hour becomes one of very effective method for organization culture improvement. Recently, M company has introduced the new policy of working hours that employees can choose a couple of different time options depending on their personal situations. And it turns out to be very effective to work & life balance, increasing organizational vitality, improving efficiency of business and productivity, recruitment of core human resources, and prevention of deviation; both team and personal performance levels has significantly improved. Therefore, it is highly recommended to adapt flexible working policies for companies seeking for a long term, sustainable corporate vision.