Policies and Tasks for Improving Korean CM Industry

CM 산업 발전을 위한 정책 및 과제 추진 방안

  • Received : 2014.06.16
  • Accepted : 2014.08.11
  • Published : 2014.09.30

Abstract

As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

국내 건설투자가 점차 감소되는 환경 변화 속에서 해외 CM시장으로의 진출에 대한 중요성이 대두되고 있으며, 성공적인 CM시장의 진출 확대를 위해서는 건설사업 생애주기 관점에서의 CM 업무기능의 역량 강화가 요구된다. 본 연구에서는 CM산업 제도변화를 고찰하고, 생애주기별 CM업무 비중을 분석하였다. 분석 결과, 국내공공 CM사업은 시공단계에 업무 투입 노력이 78%이상 집중되어 시공전단계의 기술경쟁력 축적을 제도적으로 저해하고 있는 현실이다. 즉, 우리나라 CM기업이 해외시장 진출을 위한 생애주기관점에서의 기술 경쟁력 확보를 위해서는 CM기업 자체적인 역량 향상 노력도 중요하지만, 이에 못지않게 '인력배치 기준' 등에 대하여 유연성을 보장하는 제도적인 뒷받침이 필요하다. 이러한 배경에서, 본 연구에서는 '경직된 인력배치기준의 개선', '비합리적 CM대가기준의 개선', 'CM선정방식의 개선', '불합리한 업무범위 결정의 개선', '발주자 사업관리 역량 평가'와 같이 5가지 측면에서 우리나라 CM산업의 발전 및 해외시장 진출 확대 기반 마련을 위한 정책 및 제도 개선방안을 제시하였다.

Keywords

References

  1. Jung, Y., Woo, S., Park, J., Kang, S. H., Lee, Y., and Lee, B. N. (2004). "Evaluation of the Owners' CM Functions." Korean Journal of Construction Engineering and Management, 5(3), KICEM, pp. 128-136.
  2. Kim, J. H., and Kim, H. S. (2013). "A Study on the Investigation into Obstacles in Overseas CM Projects." Korean Journal of Construction Engineering and Management, 14(5), KICEM, pp. 113-121. https://doi.org/10.6106/KJCEM.2013.14.5.113
  3. Kim, S. B., Lee, J. D., and Kim, J. W. (2008). "A Benchmarking Study on CM Fee Estimation." Korean Journal of Construction Engineering and Management, 9(1), KICEM, pp. 96-106.
  4. Lee, B. N., Choi, S. I., and Jang, H. S. (2005). "Suggestions for the Domestic CM/PM Revitalization." CERIK Research Report, 2005-08.
  5. Lee, Y. H., Chang, C. K., Choi, S. I., Kim, W. T., and Kim, Y. J. (2011). "CM/PM Major Issues and a Path Forward in Korean Construction Industry." CERIK Research Report, 2011-11.
  6. Lee, U. K., Yoo, W. S., Kim, D. I., Kim, T. H., Cha, M. S., and Cho, H. H. (2012). "Improvement of estimating method for construction management service fee by case study." Korean journal of construction engineering and management, KICEM, 13(4), pp. 16-24. https://doi.org/10.6106/KJCEM.2012.13.4.016
  7. Ministry of Land, Infrastructure and Transport (MOLIT) (2013). "Architectural Design Industry, Nurture World Top 5 Class", MOLIT Press Release, August 9, 2013
  8. Na, K. T., Ryoo, B. Y., and Kang, B. H. (2001). "A Proposal to compile a Practice Guide by Construction Phases for CM Service Projects - Focused on the Case of Construction Manager as Owner's Agent." Journal of the Architectural Institute of Korea, 17(3), pp. 67-74.
  9. Park, H. K., Shin, K. C., Park, H. P., and Jung, Y. (2008). "A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM." Korean journal of construction engineering and management, KICEM, 9(6), pp. 244-256.
  10. Park, Y. W., and Lim, N. G. (2011). "Effects of CM Contracts on the Management Technology in the Korean Construction Industry." Journal of the Korea Institute of Building Construction, 11(2), pp. 108-115. https://doi.org/10.5345/JKIC.2011.04.2.108
  11. Woo, S., Kim, D. H., Jung, Y., Lee, B. N., and Kang, S. H. (2001). "Construction Management Contracts in the Korean Construction Industry." CERIK Research Report, 2001-12.

Cited by

  1. Growth Model for Korean CM Firms based on 2012 Statistics vol.15, pp.6, 2014, https://doi.org/10.6106/KJCEM.2014.15.6.092