Centrifuge Tests on Compression Performance of Octagonal Concrete Filled Tube Column to be applied to Top-Down Construction Method (역타공법에 적용되는 팔각 콘크리트충전 강관의 압축성능을 위한 원심모형실험)

  • Kim, Dong-Kwan;Lee, Seung-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.7
    • /
    • pp.9-16
    • /
    • 2017
  • To improve concrete-filled tube (CFT) columns, an octagonal concrete-filled tube (OCFT) column was developed. Because the OCFT column requires a small boring diameter, the OCFT column is suitable for Top-Down construction method. In this study, the compression performance of OCFT column to be used as Top-Down pile foundation was verified using centrifuge equipment. Under 12 g centrifugal acceleration, the bearing capacities of the pile foundations of OCFT and H-shaped sections were tested. When the pile foundations were embedded in soil of full depth, 45 % of the design strength, which was assumed to be the construction load, was supported by the OCFT and H-shaped sections in the elastic states. When the pile foundations were embedded in soil of half depth, the buckling of the pile foundations was not investigated. After the loading test, the rock at the bottom of pile foundation, which had a strength of 3.5 MPa, was not damaged due to 45 % of the design strength.

Development of Connection between CFT Prefounded Column and Slab (CFT 선기초기둥과 슬래브 접합부 개발)

  • Song, Jee-Yun;Rhim, Hong-Chul;Kim, Seung-Weon;Kim, Dong-Gun;Kang, Seung-Ryong;Jeong, Mee-Ra
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.129-133
    • /
    • 2008
  • For the construction of Top-Down structures, it is crucial to have a solid connection between prefounded columns and slabs. This paper presents a new construction method for the connection when using a circular Concrete Filled Tube (CFT) as a prefounded column as an alternative to currently using wide flange type columns. The development of shear studded jackets along with a shear band suitable for the circular shape of the column has been made. The details and mechanism of the connection is explained together with the results of experiments which verified the structural integrity of the connection.

  • PDF

The Experimental Study on Deflation of Air for Top-Down Joint area (역타기둥 이음부의 공기포 배출을 위한 실험적 연구)

  • 임형일;이동하;백민수;박병근;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.763-768
    • /
    • 2001
  • The purpose of this study is to research a specific material characteristics of top down concrete at column joint and to reduce column joint opening. Based on the established top down study, the experiment to apply an real construction case is performed. When the concrete placed into joint of top down column, raised air bubble is left as opening. This study is examined the incomplete packing reason in the top down column and found to air deflation method. The result of study is below (1) As the method to minimize column opening caused from confined air, it is required that an air exhaust port installation in joint column. (2) From air exhaust port installation, most of air bubble in column part is exhausted. As the concrete placing height is going up, air bubble size is going smaller.

  • PDF

Suitability Evaluation of Lateral Earth Pressure for Design Diaphragm Walls applied to the Top-Down Construction Method (Top-Down 공법이 적용된 지중연속벽의 설계시 측방토압의 적합성 평가)

  • Hong, Won-Pyo;Kang, Chul-Joong;Yun, Jung-Mann
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.11-21
    • /
    • 2012
  • The Rankine(1857)'s earth pressure and the Hong and Yun(1995a)'s earth pressure was applied to analyze the lateral displacement of diaphragm wall applied to the Top-Down construction method using the computer program, which is a common design program for diaphragm wall. The lateral displacement estimated by the computer program was compared with the lateral displacement measured by inclinometer. The Rankine's earth pressure has been widely used to design the diaphragm wall in the analysis of computer program. As the result of comparison, the lateral displacement of diaphragm wall was predicted differently according to the applied earth pressures. The behavior of lateral displacement predicted by the Rankine's earth pressure was different with displacement measured by inclinometer and the lateral displacement at the bottom part was overestimated. However, the lateral displacement predicted by the Hong and Yun's earth pressure is similar to the behavior and maximum value of real displacement. Therefore, the Hong and Yun's earth pressure is more suitable than the Rankine' earth pressure to design the diaphragm walls applied to the Top-Down Construction Method.

Behavior Characteristics of Precast Concrete-Panel Retaining Wall Adhered to In-situ Ground through Large Scaled Load Test (대형재하시험을 통한 원지반 부착식 패널옹벽의 거동특성)

  • Shin, Yuncheol;Min, Kyongnam;Kim, Jinhee;Ahn, Taebong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.45-53
    • /
    • 2016
  • A precast panel wall system resists against the horizontal earth pressure by increasing the shear strength of ground by reinforcement connected to the panel. The application of precast panel wall system is growing to lately minimize the earth work and environmental damage caused by large cut slope and to use the limited land effectively. The ground adhered panel wall system is the construction method that has the panel engraved with natural rock shape to improve the landscape. This system is developed to complete Top-Down method, and it is possible to have vertical cut, and to adhere to in-situ ground, improve construction ability by minimizing the ground relaxation and exclusion the trench and backfill process. In this study the field tests were performed to verify the construction ability about the vertical cut and complete Top-Down process and the construction behavior of ground adhered panel wall system was analyzed by large scale loading test and measurement results during loading test.

Compression Tests on Opened Slab (개방형 슬래브의 압축 성능 실험)

  • Choi, Lin;Goh, Soo-Jin;Yom, Kyong-Soo;Jeon, Keum-Seok;Rhim, Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.29-31
    • /
    • 2007
  • Building construction in downtown is ever increasing with a strong demand. Top-Down Method is one of suitable construction method for its advantage in minimizing disturbance to neighborhood. Along with these reasons construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. Opened Slab is one of these method which resist the horizontal force by slab and it has many merit about construction time and unity. We analyze the compression tests on opened slab for the application.

  • PDF

A Study On Void Check for Top-Down Column Joint by Field Experiment (현장실험을 통한 역타설 이음부의 공극특성 분석)

  • Lee, Young-Do;Jung, Sang-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.105-109
    • /
    • 2005
  • Classified with concrete as placing ways - direct ways, sheath way - and placing directing flange direction, web direction - is analyzed section and strength of hardened concrete. The results of this study is belows the more fluid of concrete, the more useful to top-down method. To minimize the voids of the reverse placement joints, It is more effect to use the sheath method than direct method in concrete placement. If the joint face is a plane, it is impossible to extract the air bubbles which caused voids, so we should consider about this, and decide to select which type of joints.

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

A Study on Strenth of Top-Down concrete on placing ways of kind (타설법에 따른 역타콘크리트의 강도에 관한 연구)

  • 이영도;윤상혁;정근호;정상진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.37-40
    • /
    • 2002
  • The purpose of this study is promote perfect of construction and progress of packing ability through comparison and analysis with quality, as placing ways and placing direction are changed. Kinds of concrete are general, high fluidity, and high Performance concrete. Classified with concrete as placing ways - direct ways, sheath way - and placing directing - flange direction, web direction - is analyzed section and strength of hardened concrete. The results of this study is belows the more fluid of concrete, the more useful to top-down method.

  • PDF

Non supporting form system for down ward construction and non supporting down ward construction method using the same (상.하 분리형 지지방식의 무지주 역타설 거푸집 공법용 거푸집 지지체 및 이를 이용한 역타설 거푸집 공법)

  • Yom, Kyong-Soo;Jeon, Keum-Seok;Goh, Soo-Jin;Rhim, Hong-Chul;Lee, Je-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.25-28
    • /
    • 2006
  • The contiguous construction in downtown area requires an appropriate substructure construction method since it results in the insufficient working spaces and frequent public resentment by noise and vibration. In particular, Top-down method usually is applied for downtown construction, and followed by several difficulties in casting the slab concrete for substructure. In this study, we focus on the improvement workability for substructure construction.