APPLICATION OF MULTIVARIATE DISCRIMINANT ANALYSIS FOR CLASSIFYING PROFICIENCY OF EQUIPMENT OPERATORS

  • Ruel R. Cabahug;Ruth Guinita-Cabahug;David J. Edwards
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.662-666
    • /
    • 2005
  • Using data gathered from expert opinion of plant and equipment professionals; this paper presents the key variables that may constitute a maintenance proficient plant operator. The Multivariate Discriminant Analysis (MDA) was applied to generate data and was tested for sensitivity analysis. Results showed that the MDA model was able to classify plant operators' proficiency at 94.10 percent accuracy and determined nine (9) key variables of a maintenance proficient plant operator. The key variables included: i) number of years of experience as equipment operator (PQ1); ii) eye-hand coordination (PQ9); iii) eye-hand-foot coordination (PQ10); iv) planning skills (TE16); v) pay/wage (MQ1); vi) work satisfaction (MQ4); vii) operator responsibilities as defined by management (MF1); viii) clear management policies (MF4); and ix) management pay scheme (MF5). The classification procedure of nine variables formed the general model with the equation viz: OMP (general) = 0.516PQ1 + 0.309PQ9 + 0.557PQ10 + 0.831TE16 + 0.8MQ1 + 0.0216MQ4 + 0.136MF1 + 0.28MF4 + 0.332MF5 - 4.387

  • PDF

Automated Phase Identification in Shingle Installation Operation Using Machine Learning

  • Dutta, Amrita;Breloff, Scott P.;Dai, Fei;Sinsel, Erik W.;Warren, Christopher M.;Wu, John Z.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.728-735
    • /
    • 2022
  • Roofers get exposed to increased risk of knee musculoskeletal disorders (MSDs) at different phases of a sloped shingle installation task. As different phases are associated with different risk levels, this study explored the application of machine learning for automated classification of seven phases in a shingle installation task using knee kinematics and roof slope information. An optical motion capture system was used to collect knee kinematics data from nine subjects who mimicked shingle installation on a slope-adjustable wooden platform. Four features were used in building a phase classification model. They were three knee joint rotation angles (i.e., flexion, abduction-adduction, and internal-external rotation) of the subjects, and the roof slope at which they operated. Three ensemble machine learning algorithms (i.e., random forests, decision trees, and k-nearest neighbors) were used for training and prediction. The simulations indicate that the k-nearest neighbor classifier provided the best performance, with an overall accuracy of 92.62%, demonstrating the considerable potential of machine learning methods in detecting shingle installation phases from workers knee joint rotation and roof slope information. This knowledge, with further investigation, may facilitate knee MSD risk identification among roofers and intervention development.

  • PDF

A Framework for Assessing the Learning Performance and Creativity in Spatial Features by Immersive Virtual Environments

  • Jae-ho Jang;Jin-bin Im;En-Lian Zhang;Moon-boo Joo;Shin-Hyun Kang;Ju-Hyung Kim
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.621-628
    • /
    • 2024
  • The development of immersive virtual environment (IVE) technologies has allowed for virtual simulations and exploration of architectural spaces before building the facilities. Although various researchers have implemented IVEs to demonstrate their effectiveness, these rigorous methods for evaluation have obtained little attention. For education facilities, learning environments are crucial factors influencing students' academic performance and attention. Previous studies have evaluated the capabilities of spaces in terms of the learning performance of students in actual conditions. However, various spatial features cannot be experienced in real-world situations despite the introduction of IVEs that can validate the learning performance. This study aims to propose a framework to compare learning abilities in real space and identical ones implemented by two different methods: Virtual Reality and Mixed Reality. To this end, various cognitive and creativity tests are conducted i.e., N-back, Go/No-go, Spatial working memory updating, and Torrance Test of Creative Thinking-verbal tests. Then, a comparison is conducted to show cognition and creativity between real and virtual experiences.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

Constructing a Model for National Authority Control Utilizing VIVO (VIVO를 활용한 국가적 전거구축모델에 관한 연구)

  • Oh, Sam G.;Han, Sangeun;Son, Teaik;Kim, Seonghun
    • Journal of the Korean Society for information Management
    • /
    • v.35 no.3
    • /
    • pp.165-187
    • /
    • 2018
  • Despite repeated efforts to develop a methodological foundation for assembling collaborative authority data in South Korea, issues such as the establishment of a standard authority model and standard authority construction as well as the reconfiguration of existing entities in authority building have prevented such research from generating a cooperative push for nation-wide authority data and progressing toward concrete implementation. The formulation of a collaborative and well-utilized collection of national authority data accordingly calls for 1) a practical approach to supporting both established authority data contributors and newly organized avenues of mutual participation in authority building, 2) committed involvement on the part of national institutions capable of providing the project with sustained assistance, and 3) a standard identification system which allows multiple organizations to merge their data. This study addresses the challenges of the current environment by taking stock of the key components necessary for the creation of collaborative authority data and using a Semantic Web-based interoperable VIVO ontology model to propose a viable national authority data framework.

Comparative Analysis of Column Connection Characteristics of Green Frame (그린 프레임의 기둥접합부 특성 분석)

  • Kim, Keun-Ho;Lee, Taick-Oun;Lee, Sung-Ho;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.415-425
    • /
    • 2012
  • Green Frame was developed to embody a Green structural system that can provide long life, resource reduction, and availability of remodeling in apartment buildings. Composite precast concrete column and beam, the major structural material of Green Frame, can be installed precisely and promptly through connection of steels and concrete. The connection of Green Frame can be divided into four types, based on the method and characteristics of connection. To select an appropriate type for the site, a comparative analysis of the four types is necessary. The objective of this study is to compare the duration, cost, quality, and safety of four types. The findings of this study can be applied during the selection that appropriate composite precast concrete column reflected project characteristics in design phase.

A Study on the Evaluation of Watertightness Properties for Rain-Block System in the Sliding-Roof Joint of Large-Span Membrane Structures (개폐식 대공간 막 구조물에서 지붕 맞댐부 우수차단 시스템의 수밀성 평가에 관한 연구)

  • Oh, Sang-Keun;Baek, Ki-Youl;Lee, Sun-Gyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.129-136
    • /
    • 2010
  • This study is an evaluation of the water-tightness properties of rain-block systems in the sliding-roof joint of large-span membrane structures. In this study, we suggested a method of evaluating the water-tightness performance of the joint part of a sliding door in the roof of a large-span membrane structure (for a pilot project), in an environment of rain and wind. The shape of the rainwater blocking systems of the joint part in a sliding door verifies the defects and the effects of water leakage prevention when there is precipitation with wind conditions. To secure the water-tightness of large span membrane structures, it is necessary to have a guideline on the evaluation of the design for rain-block system of the joint part, and the quality of the membrane material, both of a retractable roof and a closed roof.

Economy Analysis to Retrofit Ballast Water Treatment System for an Existing Vessel (선박 평형수 처리장치 선정을 위한 경제성 분석)

  • JEE, Jae-Hoon;PARK, Sang-Kyun;OH, Cheol
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.5
    • /
    • pp.1319-1328
    • /
    • 2016
  • Since Ballast Water Management Convention has been effected, BWTS, applied to new-building vessels and existing vessels, have been developed from many countries with various treatment methods. However, BWTS is mainly typed Electrolysis, Ozone and UV type. Approximately 70 products have been type approved by the Flag Administrations. For the new-building vessels, the vessels' design and construction have been considered for arrangements and installations for BWTS. However, existing vessels which already construction had finished have problem with selection of BWTS type for installation and arrangement. The selection of the most economized BWTS system is important though, CAPEX has not been made any significant differences. However, OPEX is more important factor. Consequently, detail analysis of OPEX is the key to the selection of the most economized BWTS system and also it can be the purpose of this study. The feasibility study on the main three type of BWTS (Electrolysis, Ozone and UV type) for 175K Bulk Carrier and 57K Cargo ship has been conducted for this study. Because, these three type of BWTS have been the most frequently installed and used and the two type of object vessels are consist of the 40% of the world merchant ship market. For this study, interest rate, project duration (operation time after installation), maintenance cost and fuel oil price are considered as major factor of feasibility study. In addition, expecting Interest rates to sensitivity analysis conducted for more accurate feasibility study. For 175K Bulk carrier, ozone treatment system is more economical than other types. For 57K cargo ship, UV type is considered more economical than other types. However, it is concluded that electrolysis type is more suitable compare to installation space, total weight and electrical power consumption.

Concept and Structure of Parametric Object Breakdown Structure (OBS) for Practical BIM (BIM 객체분류체계 (OBS) 개념 및 구조)

  • Jung, Youngsoo;Kim, Yesol;Kim, Min;Ju, Taehwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.88-96
    • /
    • 2013
  • Recent proliferation of building information modeling (BIM) has actively stimulated integrated utilization of geometric (graphic) and non-geometric (non-graphic) data. Nevertheless, physically and logically, linking and maintaining these two different types of data in an integrated manner requires enormous overhead efforts for practical implementation. In order to address this problem, this paper proposes a concept and structure of the object breakdown structure (OBS) that facilitates advanced BIM implementations in an automated and effective manner. Proposed OBS numbering system has secure rules for organizing graphic objects in full considerations of effectively integrating with non-geometric data (e.g. cost and schedule). It also removes repetitive linking process caused by design changes or modifications. The result of applying this concept to a housing project revealed that only 120 definitions controled over 6,000 graphic objects for full integration with cost and schedule functions.

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.