• Title/Summary/Keyword: Repair and Replacement

Search Result 455, Processing Time 0.022 seconds

A Corrective Maintenance Policy Which Determines Replacement or Repair for the Maintenance of System Failures

  • Jang, Jae-Jin;Lie, Chang-Hoon
    • Journal of the military operations research society of Korea
    • /
    • v.15 no.1
    • /
    • pp.54-62
    • /
    • 1989
  • This paper presents a corrective maintenance model to determine either type of maintenance actions upon failure of the system. Types of maintenance actions considered are minimal repair and replacement. Minimal repair cost is assumed to be random, whereas replacement cost is fixed. A policy, B(t), which determines the type of maintenance action based on the estimated minimal repair cost when the system fails at time t is adopted. To obtain an optimal policy, an expected maintenance cost per unit time is derived and is minimized with respect to B(t).

  • PDF

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

Cost analysis of RRNRW from the manufacturer's perspective (재생교체-비재생수리보증에 대한 생산자 측면의 비용분석)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.12 no.4
    • /
    • pp.255-263
    • /
    • 2012
  • This paper considers the cost analysis from the manufacturer's point of view for renewing replacement and non-renewing repair warranty(RRNRW) of a repairable system. To do so, we consider the renewing replacement and non-renewing repair warranty, which is proposed by Jung(2011). To analysis the expected warranty cost from the manufacturer's perspective for renewing replacement and non-renewing warranty, we obtain the expected total warranty cost and the expected warranty length which are very important information for the manufacturer. Finally, the numerical examples are presented for illustrative purpose.

A Periodic Replacement Model with Random Repair Costs and Threshold Levels (확률적 수리비용과 임계수준을 고려한 주기적 교체 모형에 관한 연구)

  • Gang Yeong-Gil;Gang Seong-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.114-125
    • /
    • 1992
  • A policy of periodic replacement with minimal repair at failure is considered for a complex system. Under such a policy the system is replaced at periodic times. iT(i=1,2, $\ldots$), while minimal repair is performed at any intervening system failures. The cost of the j-th minimal repair to the component which fails at age t is g(C(t). $c_j$ (t)), where C(t) is the age-dependent random part, $c_j$(t) is the deterministic part which depends on the age and the number of the minimal repair to the component, and g is a positive nondecreasing continuous function. The cost of replacement is expensive when the number of failures occurring in (0. T) is greater than a threshold level. The problem of determining the optimal replacement period, $T^{\ast}$, which minimizes the total expected cost per unit time over an infinite time horizon is considered. Various special cases are considered.

  • PDF

Development and Applications of a Methodology and Computer Algorithms for Long-term Management of Water Distribution Pipe Systems (상수도 배수관로 시스템의 장기적 유지관리를 위한 방법론과 컴퓨터 알고리즘의 개발 및 적용)

  • Park, Suwan
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.3
    • /
    • pp.356-366
    • /
    • 2007
  • In this paper a methodology is developed to prioritize replacement of water distribution pipes according to the economical efficiency of replacement and assess the long-term effects of water main replacement policies on water distribution systems. The methodology is implemented with MATLAB to develop a computer algorithm which is used to apply the methodology to a case study water distribution system. A pipe break prediction model is used to estimate future costs of pipe repair and replacement, and the economically optimal replacement time of a pipe is estimated by obtaining the time at which the present worth of the total costs of repair and replacement is minimum. The equation for estimating the present worth of the total cost is modified to reflect the fact that a pipe can be replaced in between of failure events. The results of the analyses show that about 9.5% of the pipes in the case study system is required to be replaced within the planning horizon. Analyses of the yearly pipe replacement requirements for the case study system are provided along with the compositions of the replacement. The effects of water main replacement policies, for which yearly replacement length scenario and yearly replacement budget scenario are used, during a planning horizon are simulated in terms of the predicted number of pipe failures and the saved repair costs.

Cost Analysis Model for Minimal Repair in Free-Replacement Policy (무상수리 정책에서 응급수리 적용의 비용분석 모델)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.241-247
    • /
    • 1997
  • This paper is concerned with cost analysis model in free-replacement policy. The free-replacement policy with minimal repair is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost is calculated according to the parameter of failure distribution in a view of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has weibull distribution.

  • PDF

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

The ($\textsc{k}, t_p$) Replacement Policy for the System subject to Two Types of Failure

  • Lee, Seong-Yoon
    • Journal of the military operations research society of Korea
    • /
    • v.25 no.2
    • /
    • pp.144-157
    • /
    • 1999
  • In this paper, we consider a new preventive replacement policy for the system which deteriorates while it is in operation with an increasing failure rate. The system is subject to two types of failure. A type 1 failure is repairable while a type 2 failure is not repairable. In the new policy, a system is replaced at the age of $t_p$ or at the instant the$\textsc{k}^{th}$ type 1 failure occurs, whichever comes first. However, if a type 2 failure occurs before a preventive replacement is performed, a failure replacement should be made. We assume that a type 1 failure can be rectified with a minimal repair. We also assume that a replacement takes a non-negligible amount of time while a minimal repair takes a negligible amount of time. Under a cost structure which includes a preventive replacement cost, a failure replacement cost and a minimal repair cost, we develop a model to find the optimal ($\textsc{k},t_p$) policy which minimizes the expected cost per unit time in the long run while satisfying a system availability constraint.

  • PDF

STOCHASTIC INEQUALITIES IN TWO REPAIRABLE UNITS

  • PARK, TAE-KEUN;PARK, YOUNG-SUNG
    • Honam Mathematical Journal
    • /
    • v.23 no.1
    • /
    • pp.145-158
    • /
    • 2001
  • In this paper we investigated a replacement model with two types of repairs. Repairs are classified into minimal and perfect repair. An operating unit is completely replaced whenever it reaches age ${\tau}({\tau}>0)$(planned replacement). If it fails at age $t<{\tau}$, it is either restored by a entire unit with probability p(t)(perfect repair), or it undergoes minimal repair with probability $\bar{p}(t)=1-p(t)$. After a planned replacement, the procedure is repeated.

  • PDF

Cost Analysis of a Two-dimensional Warranty Policy with Replacement and Repair Regions (교체와 수리영역을 갖는 이차원 보증정책의 비용분석)

  • Yun, Won-Young;Yoo, Seung-Hyo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.2
    • /
    • pp.247-253
    • /
    • 1996
  • This paper proposes a new two-dimensional warranty policy with replacement and repair regions and analyses the warranty cost under the new warranty policy. The product is sold under a two-dimensional warranty(usage and age) in which two regions exist : the failed product is replaced by the manufacturer in the replacement region or minimally repaired by the manufacturer in the repair region. The formula of the expected warranty cost under some assumptions about usage and failure is obtained. Numerical examples are studied.

  • PDF