A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

A Study on the Use of LD Clause against the Seller's Breach of Delivery of Goods in the Contract for the International Sale of Goods (국제물품매매계약에서 매도인의 물품인도의무 위반에 대비한 손해배상액의 예정조항 (Liquidated Damage Clause: LD조항)의 활용에 관한 연구 - ICC Model International Sale Contract를 중심으로)

  • Oh, Won-Suk;Youn, Young-MI;Li, Jing Hua
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.3-25
    • /
    • 2011
  • The purpose of this paper is to examine the use of LD Clause against the seller's breach of contract in connection with delivering the goods in the international sales contract, and international guarantee system using standby L/C or demand guarantee. For this purpose, the author, first, considered the outline of the buyer's remedies in cases that the seller had not performed his obligations in contract and the difficulties in the buyer's remedies. As alternatives for overcoming the difficulties, this author recommended the LD Clauses (Liquidated Damage Clauses) based on ICC Model International Sales Contract, and explained each Model Clause. To enhance the feasibility of LD Clause, this author suggested the guarantee system, like the standby L/C or demand guarantee. But these guarantee systems have several limitations in practical use. Thus, these guarantee systems would greatly contribute to Korean exportation in the future. The reason is that the Korean export structure would be more complex and the period of sales contract would be longer and longer, which result to in long-terms supply contracts. These changes would require the guarantee much urgently.

  • PDF

A Study on the Validity and Practical Application of Liquidated Damage Clause(LD Clause) in International Sales Contract (국제물품매매계약(國際物品賣買契約)에서 'Liquidated Damage Clause'(LD 조항(條項))의 유효성(有效性)과 실무적(實務的) 적용(適用)에 관한 연구)

  • Oh, Won-Suk
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.17
    • /
    • pp.71-91
    • /
    • 2002
  • The purpose of this paper is to examine the viewpoints of the different legal systems for the validity of LD Clause and the possibility of gap-filling function of UNIDROIT Principles in International Sales Contract. The results of comparative study between common law system and civil law system, and between CISG and UNCDROIT Principles is as follows: First, common law system distinguishes LD Clause and Penalty Clause, but civil law system including Korean law does not strictly distinguish the difference between them, provided that the liquidated damages are not grossly excessive. Second, CISG does not concerned with the validity of LD Clause but entrust this matter to the law applicable by virtue of the rules of private international law; conversely the Principles follow similar position of civil law system. The possibility of gap-filling of the Principles is more positive in the case of arbitration than in the case of litigation. On the basis of above study, I also checked the LD Clauses of ICC Model International Sales and the Model Contracts of Korean Commercial Arbitration Board. The LD Clauses of there two Model Contract seem very appropriate and reasonable for the reference in practical application. The appropriate, not excessive, LD Clause will contribute not only to eliminate the burden of proof for the actual damages, but also to enforce both parties to perform their obligations in their contracts. Therefore, When we make contract, we should keep in our mind to insert the reasonable and appropriate LD Clause in the sales contract. If not, so to speak, litigated damages are grossly excessive, the Clause may be invalid in some legal system.

  • PDF

A Study on the Sphere of Application of the Provision for Interest under the CISG (국제물품매매계약(國際物品賣買契約)에 관한 UN협약상(協約上) 이자지급규정(利子支給規定)의 적용범위(適用範圍)에 관한 연구(硏究))

  • Bae, Jun-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.13
    • /
    • pp.235-253
    • /
    • 2000
  • As to the sphere of application, Article 78 CISG undoubtedly applies to interest on the purchase price. Furthermore, the provision also applies to "any other sum that is in arrears". This language has been interpreted to encompass expenses that one party had on behalf of the other as well as reimbursements when the purchase price is reduced according to Article 50 CISG. However, it is questionable whether this language also extends to claims for damages. Legal scholars seem to agree that one has a right to interest on damage claims under Article 78 if the amount in question has been liquidated vis-a-vis the other party. Whether this right to interest also applies to unliquidated sums, is controversial, however. In this study, as a result of taking into account the puspose of Article 78, we could find the fact that regardless of whether the exact amount of damages has been specified yet, the breaching party still owes compensation to the other party from the time of the breach and, accordingly, the non-breaching party should be entitled to interest payments on the loss from that time. Consequently, Article 78 applies not only to liquidated but also to unliquidated damages.

  • PDF

A Study on the Disputable Issues of the Standard Form of Korea Service Contract - Focusing on Liquidated Damage and Minimum Quantity Commitment - (한국 컨테이너 해상화물 표준장기운송계약서 쟁점에 관한 연구 - 손해배상예정액과 최소약정물량을 중심으로 -)

  • Jae-woong Yoon;Yun-seok Hur
    • Korea Trade Review
    • /
    • v.48 no.2
    • /
    • pp.217-243
    • /
    • 2023
  • This study revealed practical implications by analyzing the clauses and disputable issues of the Korea Service Contract. Korea introduced Servcie Contract in the container part since Hanjin Shipping's bankrupcy and distributed the standard form(2019). After that, the standard form was revised during the supply chain crisis(2022). In the standard form, there are clause that require agreement due to conflicting interests of shipper and carrier. Therefore, the main clauses of the standard form were analyzed to derive the practical meaning to the both parties. In addition, in the process of introducing the standard form, the most disputable issues, liquidated damages and minimum quality commitment, were deeply analyzed to explain how shipper and carriers' benefit and loss differ as the clause changes. In conclusion, both parties must set LD at a very reasonable level so that they do not proceed separately with penalty. In addition, 'evenly' is a much more important than quantity for carrier in the establishment of MQC, so extra box option for shipper even during the peak season is needed to accommodate with service contract.

해외건설공사 수행절차(7) - 준공단계(竣工段階)

  • 해외건설협회
    • 월간 기계설비
    • /
    • no.12 s.221
    • /
    • pp.62-64
    • /
    • 2008
  • 현장에서는 주공정과 예산관리를 중심으로 공사진행을 하고, 공정이 90% 이상 달성되었거나 또는 잔여공기가 9개윌 정도 남아 있으면 모든 공정을 재검토하기 바란다. 우선 하청시로부터 잔여 공사에 대한 공정표를 받아, 잔여공시 1개월 전에 준공될 수 있는지 검토한다. 9개월 정도 앞서 준공기일을 검토하는 것은, 자재납기가 장기간(7개월 정도) 소요되는(플랜트 Control Panel 등) 자재의 발주여부를 검토하고, 잔여공기 내에 정상 작업으로 공기 내 준공이 불가하다고 예측될 경우, 3개월 또는 6개월 돌관작업 계획을 세우기 위함이다. 잔여공기가 3개월 정도 남아 있을 때, 시설물을 인계(Hand Over) 하기 위해 본격적인 준비를 한다. 준공이란 "계약적으로 발주자가 실제적으로 계약서에 의도된 목적으로 사용할 수 있는 상태(표준계악일반조건 48. 1)"를 말하므로, 이 점에 착안하여 발주자가 시설물을 제때에 사용하지 못함으로써 발생되는 지체보상금(Liquidated Damage)을 물지 않도록 작전을 세운다.

  • PDF

A Comparative Legal Study on the Damages in the International Sale Laws (국제물품매매에서 손해배상청구권에 관한 비교법적 고찰)

  • OH, yon-Sok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.77
    • /
    • pp.23-42
    • /
    • 2018
  • This study compares the SGA and CISG to find out the difference of the criteria for calculating damages. and it intends to give some important points in trade practice. The damages is intended to compensate the victim for the breach of contract but there are differences between SGA and CISG as follow. First, the SGA and CISG have the same purpose of claiming damages. Both laws and regulations are subject to a full indemnification to compensate for the breach of the contract by the amount equivalent to the loss suffered by the victim. Second, in the general principle related to the calculation of damages, both law enforcement officials are required to be able to predict damages caused by breach of contract. In the case of SGA, however, a foreseeability test or remoteness of damages is required for the relationship between the contract violation and the loss. In other words, it can be said that the causal relation between the contract violation and the damage is strictly applied rather than the CISG. Finally, both laws and regulations of SGA and CISG have a big difference in criteria for calculating damages. In the CISG, after the contract is canceled, it is classified according to the existence of the alternative transaction and the damage amount is calculated based on the contract price. On the other hand, the SGA estimates the loss based on the market price at the delivery of the goods, reflecting the change in the market price instead of the contract price of the goods.

  • PDF

A Study on the Problems in Exercising Buyer's Right to Claim Damages for the Breach of Contract by the Seller in International Sales Contract - Focusing on CISG and UNIDROIT Principles(2010) - (국제물품매매계약에서 매도인의 계약위반에 대한 매수인의 손해배상청구권 행사의 문제점 - CISG와 UNIDROIT Principles(2010)을 중심으로-)

  • Oh, Won Suk;Youn, Young Mi;Lim, Sung Chul
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.58
    • /
    • pp.3-33
    • /
    • 2013
  • The purpose of this paper is to examine the problems in exercising buyer's right to claim damages for the breach of contract by the seller in international sales contract and to suggest reasonable counter-measures. The main contents are as follows: First, this author analyzed the principles of the seller's liability for damages in detail and examined the methods for the calculation of damages on the basis of Arts.74~77. As these articles are found to be insufficient in practical application, this author further examined the UNIDROIT Principles(2004) to confirm whether these Principles can fill the gaps of CISG or not, which turned out their gap-filling functions. Second, this author tried to find any expected problems when the buyer resorts to the right to claim damages in case of the seller's breach of contract including the estimation of damages, the burden of proof, causation, the proof of appropriateness for avoidance, the proof of buyer's obligation to mitigate the loss and so on. The reason is that these problems may cause a lot of difficulties in real business. As result, many buyers have given up their reasonable rights to claim damages so far. Finally, from the buyer's perspective, this author would like to suggest a liquidated damage clause(LD Clause) which gives the buyer to received a specified sum in case of seller's non-performance and/or a demand guarantee(or standby L/C) which guarantees buyer to secure unconditional payment independent of the underlying contract. For these purposes, the buyer should try to insert the LD Clause and/or Guarantee Clause in the contract when the buyer and the seller negotiate the sales contract. Also there are a lot of considerations and limitations in using the LD Clause and the Guarantee Clause in their real business, mainly dependent up bargain power between the seller and the buyer, for which this author promise to examine in detail in the future.

  • PDF

A Delay Analysis based on the Comparison of the As-planned Schedule, As-built Schedule including All Delays and As-built Schedule absent Owner Delays (계획공정표, 모든 지연을 포함한 준공공정표, 발주자 지연을 제외한 준공공정표의 비교를 통한 공기지연분석)

  • Yun Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.426-429
    • /
    • 2003
  • In the construction process, there are many change orders differing to the initial contracts came from the social needs and environmental changes. Most of them will impact to the construction process so that its effects occur project delays. Time extension and liquidated damage in the construction process come from schedule delay whether it is excusable or not non-excusable by the owner. However, those become the delay claims if the owner and the contractor are not agreed on this situation. One of the most important thing on the delay claims is the calculation of delay. The purpose of this study is to present the method of the time delay calculation by comparison of As-Planned schedule, As-Built schedule including all delay and As-Built schedule absent owner delay.

  • PDF