On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.