Park Young-Min;Ryu Han-Seong;Lee Hyun-Won;Lee Se-Hyun;Lee Chung-Dong;Yoo Jl-Yoon
The Transactions of the Korean Institute of Power Electronics
/
v.9
no.6
/
pp.620-627
/
2004
As h-bridge multilevel inverter is connected with series of single phase power cell, so it obtain high voltage using low voltage power semi-conductor and output voltage similar to sine wave. In this topology, the number of power cell increases in proportion to the output voltage level. Therefore, there are drawbacks that are responsibility against operating ability of main controller and signal wire increase. However, we can overcome this problems by the substitution of serial communication for the PWM signal in power cell control. Additionally, it has merits of reliability and maintenance. This paper deals with the synchronization and phase-shift method of power cell PWM using CAN(Controller Area Network) communication interrupt in H-bridge multilevel inverter. The advantages of proposed method are signal-line simplification using serial communication between main controller and cell controller, burden reduction in main controller, modularization of power cell, easy protection of each power cell, expandability improvement and reliability increase of control signal and power cell. This paper establishes propriety and reliability of proposed method through experiment of 13-level H-bridge multilevel inverter.
Journal of Satellite, Information and Communications
/
v.1
no.1
/
pp.59-64
/
2006
The broadband power detector for power amplitude envelope detection of the direct-conversion Six-port output signal was designed and implemented in this paper. The power detector should be linearly operated to produce the linear amplitude and phase signal for input RF signals in required broadband frequency range. The power detector should be designed under conditions of matching circuit with low VSWR, which protect unbalanced phase signal from reflection signal due to mismatch between the output port of a six-port and the input port of a power detector. The designed power detectors, which were implemented in L-band with 50 ohm matching and Ku-band with multiple LC matching circuits and isolator, respectively, were analyzed in viewpoints of the utilization as a power detector of direct conversion Six-port. The dynamic range of designed power detectors were also measured and rvaluated as a power detector of Six-port circuit.
A number of dust particles are intruded into ODD(Optical disk drive) due to the flow caused by disk rotation and are adhered to a lens or disk surface. The space between the disk and the lens is being reduced. Someone indicates the problems of this drive that are relatively small data storing capacity and slow access time. In recent, the problems of this optical disk drive mentioned above are being solved by adding the speed of the disk's revolution, making the actuator high-speed or light, and making the beam spot size smaller than making the space narrow between disk and lens. These particle contamination affects seriously RF Signal, readout signal in an ODD. Especially, the affected parts by a particle contamination in an ODD's readout signal are objective lens and media.
A new automatic generation control (AGC) signal transmission format will be adopted in the new energy management system (EMS) that KEPCO is planning to install for managing and operating the power system efficiently under the deregulation environment. Therefore, it is necessary for the power plants to make the AGC processing logic fit the new AGC signal flow format. In this work, we compare the new signal transmission scheme with the conventional one in view of its effect to the signal flow in the distributed control systems (DCS) that ale equipped in power plants to handle AGC operation. Then we propose a basic logic configuration for DCS that can be used with the new signal format. In the design of the configuration, some practical issues that should be discussed for the proper operation of the plants are considered.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.3
/
pp.51-56
/
2014
The flat power spectrum of the transmitter output signal for the desired frequency range is ideal to achieve the best performance of ultrashort pulse reflectometry. However, the power spectrum of a typical pulse generator decreases significantly as frequency increases. A configuration of three chirped waveforms was employed to improve the power spectrum of the transmitter signal at higher frequencies. To determine the amplification gain required for higher frequency components, three chirped waveforms were theoretically generated and their power spectra were measured using numerical band-pass filters. Based on the results of numerical computations, the three chirp configuration was successfully applied to the design of the transmitter for a broadband system.
The RCF analysis method is used to analyze small signal stability of power systems including GTO controlled FACTS equipment such as STATCOM. To apply the RCF analysis method in power system small signal stability problems, the state transition equations of power system equipments and power systems with STATCOM are presented. In eigenvalue analysis of power systems by the RCF analysis method, the STATCOM is modelled into the equivalents voltage source model and the PWM switching circuit model. As a result of simulation, the RCF analysis method is very powerful to calculate the oscillation modes exactly after the switching operations, and useful to analyze the small signal stability of power systems with periodically operated switching device such as the STATCOM.
International Journal of Control, Automation, and Systems
/
v.3
no.spc2
/
pp.355-362
/
2005
Deregulations and market practices in power industry have brought great challenges to the system planning area. In particular, they introduce a variety of uncertainties to system planning. New techniques are required to cope with such uncertainties. As a promising approach, probabilistic methods are attracting more and more attentions by system planners. In small signal stability analysis, generation control parameters play an important role in determining the stability margin. The objective of this paper is to investigate power system state matrix sensitivity characteristics with respect to system parameter uncertainties with analytical and numerical approaches and to identify those parameters have great impact on system eigenvalues, therefore, the system stability properties. Those identified parameter variations need to be investigated with priority. The results can be used to help Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) perform planning studies under the open access environment.
Kim, Hee-Seok;Kim, Hyun-Min;Park, Il-Hwan;Kim, Chang-Kyun;Ryu, Heui-Su;Park, Young-Ho
Journal of the Korea Institute of Information Security & Cryptology
/
v.20
no.6
/
pp.15-21
/
2010
In the recent years, various researches about the signal processing have been presented to improve the performance of power analysis. Among these signal processing techniques, the research about the signal compression is not enough than a signal alignment and a noise reduction; even though that can reduce considerably the computation time for the power analysis. But, the existing compression method can sometimes reduce the performance of the power analysis because those are the unsophisticated method not considering the characteristic of the signal. In this paper, we propose the new PCA (principal component analysis)-based signal compression method, which can block the loss of the meaningful factor of the original signal as much as possible, considering the characteristic of the signal. Also, we prove the performance of our method by carrying out the experiment.
Kim, Do Kyun;Hwang, Yu Min;Sim, Issac;Kim, Jin Young
Journal of Satellite, Information and Communications
/
v.12
no.2
/
pp.42-45
/
2017
It is known that power line communication systems have more noise than general wired communication systems due to the high voltage that flows in power line cables, and the noise causes a serious performance degradation. In order to mitigate performance degradation due to such noise, this paper proposes an artificial intelligence algorithm based on polynomial regression, which detects signals in the impulse noise environment in the power line communication system. The polynomial regression method is used to predict the original transmitted signal from the impulse noise signal. Simulation results show that the signal detection performance in the impulse noise environment of the power line communication is improved through the artificial intelligence algorithm proposed in this paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.