Korean Journal of Computational Design and Engineering
/
v.11
no.1
/
pp.11-19
/
2006
For several years, a research about the simulation for shipyard and shipbuilding has been performed. This research is based on the concept of PLM (Product Lifecycle Management) and DM (Digital Manufacturing). Global leading companies and research center are trying to get a good position of PLM, especially M&S field. Digital shipbuilding is to computerize shipyard facilities and shipbuilding processes, and to simulate expected scenarios of shipbuilding processes using a computer model in order to resolve a potential problem such as a bottleneck processes, and over loaded resources. In this paper, simulation methodology for shipbuilding is described. In addition, a local and global strategy for the use of simulation methodology is suggested. Finally, case studies about an indoor shop and an outdoor shop are described.
Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.
This paper discusses a knowledge-based system being developed by KAIST and KEPCO to assist planning the annual maintenance schedule of power units. To meet users' requirements, we have designed the system with several features: man-machine interaction, catalog system, user-friendliness, the hybrid-system of math-model and knowledge-base. In this paper, we introduce the outline of our system.
The TOC/DBR and Six Sigma are the most attention-getting concepts for managing manufacturing companies in Korea. Using the ideas and methods of the TOC/DBR, companies can achieve a large reduction of work-in-process and finished-good inventories, significant improvement in scheduling performance, and substantial earnings increase. The Six Sigma approach derives the overall process of selecting the right projects based on their potential to improve performance metrics and selecting/training the right people to get the business results. These two concepts have different backgrounds and different viewpoints for production systems. So, if the two concepts collaborate each other, the synergy effects to innovate production systems can be expected. This paper proposes a new approach to implement the TOC/DBR concepts in production systems. This approach uses some concepts of Six Sigma which stresses educations, project approaches (step by step procedure using a Roadmap), and improvement philosophy.
There are no formal decision tools or guidelines to assist owners and contractors in choosing delivery systems and project strategies that would allow for a radical reduction in project cycle time - from the preplanning phase through project start up. Therefore, it is important to identify the state-of-practice and the state-of-art on methods of achieving radical reduction defined as a reduction of 25% or more in overall project cycle time. A comprehensive literature review, three questionnaire surveys, and the seven case studies were conducted and the data obtained from them were analyzed to establish the state-of-practice and state-of-art for project cycle time reduction techniques.
This paper is concerned with a development and evaluation of heuristics for the multi-stage sequence dependent flowshop sequencing. Eighteen heuristics, CAM1, CAM2, and etc., are proposed. The performance measure is a makespan which is to be minimized. The experiment for each algorithm is designed for a 4*3*3 factorial design with 360 observations. The experimental factors are PS(ratio of processing times to setup times), M(number of machines), N(number of jobs). The makespan of the proposed heuristics is compared with the optimal makespan obtained by the complete enumeration of schedules. This yardstick of comparison is called a relative error. The mean relative errors of the eighteen heuristics are from 2.048% to 8.717%. The computational results are analysed using SPSS. The experimental results show that the three factors are statistically significant at 5% level. The simulation for the large size problems is conducted to show having the similar computational results like the small size problems.
The purpose of this paper is to schedule elective surgery patients using a stochastic programming approach and to illustrate how operating room utilization behaves when a decision-maker varies costs associated with utilization. Because of the uncertainty in surgery durations, the underage and overage costs that a decision-maker considers plays an important role in allocating surgery cases into available operating room capacity. We formulate the problem as a stochastic mixed integer programming and propose a sampling-based approximation method for a computational purpose. Newsvendor model is employed to explain the results from numerical experiments that are conducted with the actual data from a hospital. The results show that the operating room utilization is more sensitive when the unit overtime cost is relatively larger than the unit cost for underutilized time.
Kang Byung-Wook;Lee Young-Dai;Park Hyuk;Chun Yong-Hyun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.478-481
/
2002
In these days, Cost and Scheduling was managed effectively because of introduction of EVMS to construction project. However the EVMS is appropriate methods to advanced country, so it is difficult to apply into domestic construction project. in this paper weighted value n, m was used of compositive index(CI) to forecast Estimate At Completion (EAC) using statistical analysis in credible interval the objective of this paper is to verify compositive index(CI) and to forecast Estimate At Completion (EAC).
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.05a
/
pp.421-424
/
2004
This paper focuses on the problem of determining the quantity and timing of disassembling used products while satisfying the demand of their parts or components over a planning horizon. The case of multiple product types with parts commonality is considered for the objective of minimizing the sum of setup, disassembly operation, and inventory holding costs. A heuristic is suggested, in which an initial solution is obtained using a linear programming relaxation method, and then improved by perturbing the given solution using a dynamic programming approach and a look-ahead check while considering the trade-offs among different cost factors.
Proceedings of the Korean Operations and Management Science Society Conference
/
2005.05a
/
pp.1114-1116
/
2005
Shop floor control systems (SFCS) are used to make real-time planning and scheduling decisions to optimize the efficiency of manufacturing shops. These shops exhibit a non-linear, dynamic evolution caused by 1) the concurrent flows of disparate parts following complex routings, 2) a variety of machines that breakdown at random times, 3) stochastic arrivals of new parts with different priorities, and 4) jobs that have probabilistic processing times and transportation times. Because of their ability to capture that evolution faithfully, simulation models are often used in the aforementioned decisions. In this paper, various types of decision-making problems encountered in a shop floor have been investigated and categorized into process related problems and resource related problems for shop floor simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.