Implementation of TOC/DBR under Six Sigma environment

6 시그마 환경에서의 TOC/DBR 구현

  • 고시근 (부경대학교 시스템경영공학과) ;
  • 구평회 (부경대학교 시스템경영공학) ;
  • 하재원 (인제대학교 시스템경영공학) ;
  • 권혁무 (부경대학교 시스템경영공학) ;
  • 김동준 (삼성전기(주) 6시그마 경영팀)
  • Published : 2004.06.01

Abstract

The TOC/DBR and Six Sigma are the most attention-getting concepts for managing manufacturing companies in Korea. Using the ideas and methods of the TOC/DBR, companies can achieve a large reduction of work-in-process and finished-good inventories, significant improvement in scheduling performance, and substantial earnings increase. The Six Sigma approach derives the overall process of selecting the right projects based on their potential to improve performance metrics and selecting/training the right people to get the business results. These two concepts have different backgrounds and different viewpoints for production systems. So, if the two concepts collaborate each other, the synergy effects to innovate production systems can be expected. This paper proposes a new approach to implement the TOC/DBR concepts in production systems. This approach uses some concepts of Six Sigma which stresses educations, project approaches (step by step procedure using a Roadmap), and improvement philosophy.

Keywords

References

  1. Blackstone, J.H. Jr. (2001), Theory of constraints - a status report, International Journal of Production Research, 39(6), 1053-1080 https://doi.org/10.1080/00207540010028119
  2. Choi, K.S. (2001), Password for Company Resurrection - TOC, Haneon, Seoul, Korea
  3. Chung, N.K. (1999), TOC - Constraint Management, Daecheong Media, Seoul, Korea
  4. Chung, N.K. and Jeong, M.K. (2001), On the cooperation between TOC and Six Sigma, Quality Innovation, 2(1), 41-47
  5. George, M.L. (2002), Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, McGraw-Hill
  6. Goldratt, E.M. and Cox, J. (1992), The Goal, North River Press
  7. Hong, S.H., Kim, S.B., Kwon, H.M. and Lee, M.K. (1999), Six Sigma Business Breakthrough Strategy, Journal of the Korean Society for Quality Management, 27(1), 223-231
  8. Hur, W.S., Kim, D.C., and Jang, J.S. (2003), Six Sigma approach linked with Lean and TOC, IE Interfaces, 16(Special Edition), 60-64
  9. Lee, S.J. and Sun, J.U. (2002), Development of production scheduling system using TOC/DBR scheduling concepts, Proceedings KIIE 2002 Fall Conference
  10. Mabin, V.J. and Balderstone, S.J. (2000), The World of the Theory of Constraints, Boca Raton, FL: St. Lucie Press
  11. Moon, J. and Rim, S.C. (2001), A new method of profit maximization based on the theory of constraints, IE Interfaces, 14(4), 356-364
  12. Woeppel, M.J. (2001), Manufacturer's Guide to Implementing the Theory of Constraints, Boca Raton, FL: St. Lucie Press