• Title/Summary/Keyword: project evaluation

Search Result 2,339, Processing Time 0.029 seconds

원자력연구개발사업의 사후평가를 위한 계층화 분석법 (AHP)의 적용

  • 곽승준;유승훈;신철오
    • Journal of Technology Innovation
    • /
    • v.10 no.1
    • /
    • pp.201-217
    • /
    • 2002
  • Researchers, institutes, and government involved in research & development (R&D) are faced with the problem of performing R&D project evaluations. As a real-word case of evaluation, we elicited and reproduced the evaluation process of the national nuclear R&D projects, using a specific case study of Korea. In the methodology, the analytic hierarchy process (AHP) is employed to evaluate and rank the selected nuclear R&D projects which have a wide range of evaluation objectives and characteristics. As a result, we obtained relative ranking for research projects and importance of evaluation criteria. The method and implications can be easily understood and applied by practitioners since it follows naturally the standard practice of evaluating and relative comparisons of performance using evaluation procedures. By applying particular R&D project output to the procedures, project evaluators can compare and prioritize evaluation objectives.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

Study on the Development of an Evaluation Index for the Local Economy Activation of Community Investment Renewable Energy Projects (대규모 주민참여형 재생에너지 사업의 지역경제 활성화 평가지표 개발 연구)

  • Im, Hyunji;Yun, Seonggwon;Yoon, Taehwan;Kim, Yunsoung
    • New & Renewable Energy
    • /
    • v.17 no.2
    • /
    • pp.9-23
    • /
    • 2021
  • In Korea, various community investment renewable project models are being implemented to increase community acceptance of renewable energy. An important factor for enhancing local acceptance is that renewable energy projects have a positive effect on revitalizing the local economy such as income increase or job creation for residents and local companies. To maximize the local economic effect of large-scale community investment renewable energy projects, this study developed an evaluation index for local economy activation, whose indicators are the local return on investment, local companies' participation, local job creation, regional cooperation, transparency, and governance. Analysis of existing evaluation indicators and current renewable projects, financial analysis, and expert interviews were used in this research. The pilot evaluation determined that, the local economic effect was high in the following order: a fund investment wind project (Gangwon), benefit-sharing wind project (Jeju), and general wind project. In particular, residents' investment amount, the number of participating residents, and the amount and transparency of the regional cooperation fund were key factors to expand the effect of local economy activation. This evaluation index could be used in public bidding for renewable energy projects such as offshore wind zoning areas of local government.

Development of Performance Evaluation Method for Urban Regeneration Project based on Spatial Big Data (공간 빅데이터 기반의 도시재생사업 성과 평가기법 개발)

  • Yun Byung-Hun;Seong Soon-A;Lee Sam-Su
    • Journal of the Korean Regional Science Association
    • /
    • v.39 no.1
    • /
    • pp.21-36
    • /
    • 2023
  • Entering the era of low growth due to changes in social and economic conditions, most cities across the country are actively promoting urban regeneration. Although urban regeneration is a project with huge national finances, a clear evaluation system has not yet been established. In order to ensure the sustainability of urban regeneration, it is necessary to secure the validity of urban regeneration policies and establish a reflux system to supplement the policies. The purpose of this study is to derive the limitations of the existing comprehensive performance evaluation and to develop an improved urban regeneration policy comprehensive performance evaluation technique based on spatial big data. The urban regeneration comprehensive performance evaluation technique differentiated the areas affected by the urban regeneration project and the surrounding areas based on the type of urban regeneration project and the presence or absence of large cities and middle cities. The effects of urban regeneration were quantitatively verified through relative comparison between the areas affected by urban regeneration projects and the surrounding areas of population, society, economy, industry, physical and environmental evaluation indicators.

Elicitation Project Management Factors and Evaluation of its Weight to Ensure LNG Plant Success (LNG 플랜트 사업관리 요소 도출 및 중요도 평가)

  • Han, Jae-Goo;Chin, Kyung-Ho;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.85-89
    • /
    • 2010
  • The propose of this research is derive project management factors and evaluate its decision weight in LNG plant EPC phases. In order to research, we studied the demestic and international research trend and analysed expert opinions. Initially we derived nine project management factors in each phase of EPC. Elicited factors in research are project management, design management, cost management, time management, contract and craim management, safety management, environment management, and risk management. Then, we evaluated the weight of project management factors with expert survey method and elicitated. Finally, The remarkable points in the result are that key management factors of EPC project are project management and risk management.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

A Study on the Development and Evaluation of Partial Design Project for Computer Network Design Course Utilizing Software Simulator (소프트웨어 시뮬레이터를 활용한 네트워크설계 교과목의 요소설계 과제개발 및 평가에 관한 연구)

  • Choi, Dae-Woo
    • Journal of Engineering Education Research
    • /
    • v.15 no.2
    • /
    • pp.3-9
    • /
    • 2012
  • Normally, people think the results of engineering design project can be seen and be touched, however, it's not easy to develop such design subjects at IT related program. This matter turns into an initiative of Seoul Accord corresponding to the Washington Accord. In this paper, an engineering design project is developed from the lecture course that can hardly develop a touchable project due to the lack of expanse or the own characteristics of the course in the IT related program that follows the Washington Accord. An open-ended design project with the pre-defined design components and realistic constraints is developed for the Computer Network Design course. Each team consisted of 2 or 3 students performs the project for more than 5 weeks utilizing a software simulator, the Packet Tracer. In order to analyze the effectiveness, we have used various evaluation tools such as final presentation, peer evaluation, survey results, and mid/final exams. We concluded that the hard and soft skills of students have been improved considerably through the project.

FUZZY APPROACH TO PROJECT DELIVERY SYSTEM SELECTION

  • F. Nasirzadeh;N. Naderpajouh;A. Afshar;A. Etesami
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.662-671
    • /
    • 2007
  • Since variety of construction projects with their individual specifications could be handled through different procurement systems, selection of the most appropriate project delivery system is a vital step towards more efficient project execution. The appropriate selection of project delivery system may also ensure more competent management of the project. Its impacts are not only limited to the first stages of the project, as it could also influence pre-construction, construction and operational phases of the project. Among different approaches exerted for this purpose, none has taken uncertainty into account, despite the fact that during first stages of the project most of the selection factors are still uncertain and not clearly defined. This paper, hence, aims to provide a fuzzy insight into the project delivery system selection. Through this approach more tangible model of the evaluation process may be presented. Proposed fuzzy method is indeed a multi criteria decision making model, based on the group of criteria, assigned for the evaluation procedure. A case study is also conducted, based on the opinion of an invented group of the experts.

  • PDF

A Study on the Evaluation of School Library Revitalization Project (학교 도서관 활성화사업 평가에 관한 연구)

  • Byun Woo-Yeoul
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.3
    • /
    • pp.139-173
    • /
    • 2004
  • This study aims to investigate the problems in conducting the first year project of a five-year school library revitalization project and to suggest the alterative to the present system for the following years. The method of evaluation was to visit the 16 local ministries of education and to interview the government school inspectors, school principals, teachers-in-chief, teacher librarians and parents. The evaluation was conducted based on the following criteria; school library facilities and increase in collection, enrichment of education W through school library, location of manpower and enhancement of profession and building the cooperation system with the private and public sectors. Additionally, school library service training and library support system were evaluated.

  • PDF

Perceived fitness of the ex-post evaluation items of R&D projects: In the case of private R&D centers (연구개발과제의 직후평가항목에 대한 인식도 조사: 기업부설 연구소를 대상으로)

  • 이무신;손병호;엄기용;신원준;전현곤
    • Journal of Technology Innovation
    • /
    • v.3 no.1
    • /
    • pp.55-83
    • /
    • 1995
  • This paper addresses three central decision-making problems frequently encountered in developing evaluation checklists for ex-post evaluation of R&D projects at private R&D centers: 1) what kind of evaluation elements and factors should be included in the evaluation forms\ulcorner 2) how much weight should be assigned to each evaluation factor and element\ulcorner and 3) could the same evaluation elements and factors with weights be applied all the project type(research, development, and engineering)\ulcorner To answer these questions, we identified the evaluation elements/factors based on the review of relevant literature and measured the perceptions of researchers, R&D managers, and top managements of the three private R&D centers to get the information about the importance levels of the elements and the weights of the factors for each of the three project types. The findings include that 1) all the evaluation elements derived from the literature exhibited high importance levels, and 2) the importance levels of the elements and the weights of the factors were quite varied along the project types. Theoretical and practical implications of the findings for ex-post evaluation of R&D projects are discussed.

  • PDF