• Title/Summary/Keyword: precast concrete frame building

Search Result 48, Processing Time 0.023 seconds

A basic study of reinforcement tools development for Productivity Improvement of Composite PC connection work (합성 PC 구조 접합부공사의 생산성 향상을 위한 철근배근 도구 개발 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.339-340
    • /
    • 2012
  • Green frame is combined by structural steel and reinforcements of Green column and beam and unified by cast-in-place concrete. However, when upper reinforcements penetrate structural steel hole, the execution is difficult due to interference of joint and a rib of deformed reinforcements. Therefore, the objective of this study is to propose the reinforcement tools to improve productivity of precast structure connection construction. The reinforcement tools proposed in this study can be helpful to improve constructability, safety, duration, and cost comparing with conventional reinforcement method since unskilled workers can deal with reinforcements easily.

  • PDF

Erection Capability of Heavy Precast Frames with Metal Plates using Wet Concrete for Tolerance (톨러런스기반 플레이트 접합 장치를 사용한 고중량 RC보의 설치 성능)

  • Hong, Won-Kee;Nguyen, Van Tien;Nguyen, Manh Cuong;Nkundimana, Eric
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.12-13
    • /
    • 2021
  • Methods for the manufacture, erection, and assembly of heavy frame modules were proposed. Interferences among precast members were prevented by using bolted metal plates for dry precast beam-to-column joints during assembly with a clearance for tolerance implementing grouted concrete filler plates instead of metal filler plates. Clearances for tolerances were provided to avoid conflictions among components during erection phases. These gaps were, then, grouted by high-strength mortar. The constructability of new connections of a beam-to-column joint using bolted metal plates for precast structures was examined using a full-scale assembly test in which practical observations indicated that members could be aligned and placed accurately in both horizontal and vertical directions, leading to a fast and convenient assembling. Bolt holes of the endplate were properly aligned using couplers with 30 mm fastened length embedded in the columns. The assembly test demonstrated the erection safety and structural stability of the proposed joints that were without filler plates when they were subjected to heavy loads at the time of their erection. The facile and rapid assembly of precast beam-to-column connections with a 30 mm tolerance was observed. The proposed assembly method is rapid, sustainable, and resilient, replacing the conventional methods of concrete frame construction, offering a connection that can be used in constructing infrastructure, such as buildings and pipe-rack frames.

  • PDF

Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings (SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 -)

  • Kim, Doyeong;Ji, Woomin;Lim, Jeeyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2022
  • As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concrete components, a pin joint structure, for rapid construction. However, due to construction safety and structural stability requirements, the pin joint structure has many limitations in terms of the erection of the PC member, which increases the time and cost. A structural frame connected with steel joints between precast concrete components, called a SMART frame, has been developed, which addresses these constraints and risks. However, the effect of the appllication of a SMART frame on the time aspect has not been analysed. The study is a time reduction effect analysis of a SMART frame for long span and heavy loaded logistics buildings. For this study, the authors select a case site erected using existing PC components, and compare the time reduction with the SMART frame erection simulations. Through this analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventional PC installation period could be achieved. If the SMART frame is applied when carrying out future large-scale logistics building projects, it can be expected to have the effect of significantly shortening the construction period compared to the conventional method.

Seismic Behavior of Precast Frames with Hybrid Beam-Column Connections

  • Moon, Jeong-Ho;Lee, Yong-Ju
    • KCI Concrete Journal
    • /
    • v.11 no.3
    • /
    • pp.191-199
    • /
    • 1999
  • A Precast frame system with hybrid beam-column connections was proposed in this study. An analytical study evaluated the system under seismic loadings. Four buildings with different heights were modeled in which each building had three types of joint details (A. B, C). Thus, twelve buildings were examined with variables such as building height and joint detail. Four earthquake records were applied to the buildings as input ground motions. All the records were normalized to the intensity of 0.25g to assess behavior under the same intensity of seismic excitation. All the joint types showed almost identical results except for the Mexico earthquake which was scaled up from 0. 1g to 0.25g. Buildings with the type C joint exhibited the largest deflection for the Mexico earthquake. It was concluded that type B joint could be used in a high seismic zone and the type C joint could possibly be used in the regions of low to medium seismic activity.

  • PDF

Application of Hybrid Structural System Using Coupled Vibration Control Structure and Seismic Isolated Structure in High-Rise Building

  • Nakajima, Shunsuke
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.219-227
    • /
    • 2021
  • This building is a forty-eight story, 170 meters high multiple dwelling house with Dual Frame System (DFS), a coupled vibration system connecting two independent structures with hydraulic dampers. Generation of large deformation between two structures during earthquakes contributes to make the hydraulic dampers effective. To improve the aseismic performance more, this building adopts DFS hybrid system that consists of DFS and base isolation system. About typical floors, columns and beams are constructed with LRV precast concrete method that shorten the construction period greatly by integrating column-beam joints in column members.

Study on Seismic Performance of Steel Structure with Precast Concrete Cladding Panel and Connector Considered as Structural Components (외부벽판과 연결부재를 구조요소로 취급한 경우 철골구조물의 내진성능에 관한 연구)

  • Byeon, Ji-Seok
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.2
    • /
    • pp.127-133
    • /
    • 2008
  • The purpose of this study is to investigate the seismic performance of both exterior precast concrete cladding panels and their connections on steel frame, when these cladding systems are considered as the structural components. The degrees of their participation of lateral stiffness to the main building are evaluated in terms of different heights of the cladding panels. Considering the cladding system as an integrated building provides additional lateral stiffness, as well as a mechanism for energy dissipation and this system can be used as one of an advanced passive seismic control system. Hysteresis behaviors of connectors are modeled and integrated into a nonlinear finite element analysis program, ABAQUS. The results show that connections play the most important role in structural cladding system and they improve seismic performance of overall building response.

A study on rotational behaviour of a new industrialised building system connection

  • Moghadasi, Mostafa;Marsono, Abdul Kadir;Mohammadyan-Yasouj, Seyed Esmaeil
    • Steel and Composite Structures
    • /
    • v.25 no.2
    • /
    • pp.245-255
    • /
    • 2017
  • The performance of an Industrialised Building System (IBS) consists of prefabricated reinforced concrete components, is greatly affected by the behaviour of the connection between beam and columns. The structural characteristics parameters of a beam-to-column connection like rotational stiffness, strength and ductility can be explained by load-rotation relationship of a full scale H-subframe under gravitational load. Furthermore, the connection's degree of rigidity directly influences the behaviour of the whole frame. In this research, rotational behaviour of a patented innovative beam-to-column connection with unique benefits like easy installation, no wet work, no welding work at assembly site, using a hybrid behaviour of steel and concrete, easy replacement ability, and compatibility with architecture was investigated. The proposed IBS beam-to-column connection includes precast concrete components with embedded steel end connectors. Two full-scale H-subframes constructed with a new IBS and conventional cast in-situ reinforced concrete system beam-to-column connections were tested under incremental static loading. In this paper, load-rotation relationship and ratio of the rigidity of IBS beam-to-column connection are studied and compared with conventional monolithic reinforced concrete connection. It is concluded that this new IBS beam-to-column connection benefits from more rotational ductility than the conventional reinforced concrete connection. Furthermore, the semi-rigid IBS connection rigidity ratio is about 44% of a full rigid connection.

A Basic Research for Connection Type of Green Frame (Green Frame 접합방식 기초연구)

  • Kim, Keun-Ho;Joo, Jin-Kyu;Lim, Chae-yeon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.171-172
    • /
    • 2011
  • Green column and green beam, key structural members of green frame, have the characteristics of post-lintel structure, thanks to the steel frame in the connection, enabling prompt and precise installation. The connection of green frame can be divided into 4 types, depending on its shape, and each type is associated with different characteristics and construction methods. Notably, as the connection between green columns have differing types and sequences of work, subject to the connection method in use, a connection method optimized for relevant site conditions need to be selected. Therefore, this study analyzed pros and cons of 4 different types of green frame connection methods. The results set forth herein will provide basic data for subsequent studies to comparatively analyze the performance and constructibility of different green frame connection methods.

  • PDF

A Study of Analysis and Improvement Measures for Productivity in PC Project (PC공사의 생산성 분석 및 향상방안에 관한 연구)

  • Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.96-97
    • /
    • 2013
  • PC(Precast Concrete) technology has been widely used for reduction of construction period and manpower in domestic construction industry since it was introduced from advanced countries in the 1960s. But most of existing researches are shortage of research which proves the efficiency of PC methods quantitatively. Therefore, this study analyzed productivity targeting construction site workers who are working on projects using the PCF(Precast Concrete Frame) system out of PC methods that is used most typically in construction sites, and in order to provide basic data to prove the efficiency of PC project quantitatively.

  • PDF

A Basic study of Bolt-type Connection Form of Green Frame (그린 프레임 볼트방식 접합형태 비교 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.337-338
    • /
    • 2012
  • As a rahmen structure, the connection among columns of Green frame is divided into three types such as sleeve, coupler (column pre and post installation), and bolt. The bolt type consists of six types according to steel frame shape and each type has different constructability, safety, structural performance, cost, and quality. Therefore, the analysis of comparison among the types is necessary. The objective of this study is to analyze the characteristics according to the shape of six bolt types to select the appropriate connection of Green frame. The results of this study can be used as a basic study for indentifying the characteristics of steel frame on site applying bolt type connection of Green frame. In addition, this study can be applicable to compare and analyze the performance and constructability of six bolt types in detail.

  • PDF