• Title/Summary/Keyword: excavation method

Search Result 1,058, Processing Time 0.03 seconds

An Analysis for the Stress Redistribution around Tunnel Face Using Three-Dimensional Finite Element Method (3차원 유한요소법을 이용한 터널 막장 주위에서의 응력 재분배 해석에 관한 연구)

  • 문선경;이희근
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.95-103
    • /
    • 1995
  • In this paper the stress redistribution around tunnel face was analyzed by using a three-dimensional finite element model. The effects of in-situ stress levels, excavation sequences, stiffness difference between the hard ground and the weak zone on the stress redistributions were considered. Displacement and stress changes at tunnel crown, side wall, and invert were investigated throughout the sequential excavation. To show ground response, percentage of the displacement and stress variations are used as a function of normalized distance that is between the face and monitoring section. Preceding displacements and stress variations were presented to be adopted in the two-dimensional tunnel analysis.

  • PDF

Deformation Characteristics of Diaphragm Wall Induced by Deep Excavation(II) -Numerical Analysis- (대규모 굴착공사에 따른 지중연속벽체의 변형특성(II) -수치해석-)

  • 김동준;이병철;김동수;양구승
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.4
    • /
    • pp.107-115
    • /
    • 2001
  • 해성토층 위에 준설매립된 수도권 해안매립지역에서 원형의 대심도 굴착공사로 인하여 발생하는 지중연속벽의 수평변위를 예측하기 위하여 수치해석을 수행하였고, 이러한 수치해석결과와 현장측정값을 비교하여 각각의 수치해석방법의 적용성을 평가하였다. 수치해석법으로는 지반반력해석, 선형 유한요소법 그리고 비선형 유한요소법이 수행되었다. 각각의 방법들에서는 미소변형률에서의 지반거동특성인 비선형성과 굴착으로 인한 구속압감소효과를 고려한 경우와 고려하지 않은 경우에 대하여 수치해석을 수행하여 각각 그 결과들을 비교.분석하였다. 이러한 분석결과 미소변형률에서의 비선형성과 굴착으로 인한 구속압감소 효과를 고려한 비선형 유한요소해석법이 가장 정확하게 수평변위를 예측할 수 있는 방법임을 알 수 있었다.

  • PDF

A Study on the Determination of Design Load for Buried Hume Pipeline (매설흄관의 설계하중 결정에 관한 연구)

  • O, Chi-Nam;Jeong, Seong-Gyo;Jang, Gi-Tae
    • Geotechnical Engineering
    • /
    • v.5 no.2
    • /
    • pp.19-32
    • /
    • 1989
  • The vertical loads of buried Hume pipes were calculated using the finite element method, in which the hyperbolic soil model, the nonlinear hysteretic stress path model and soil-structure interface model were used. The obtained results were compared and discussed with those from the classic methods such as Marston-Spangler's theory and so on. The effects of excavation width and depth to the top of pipe along with soil parameters and type of excavation, which have not been included in the classic methods, were investigated. In addition, a calculation method of the vertical load for buried Hume pipes was proposed and it is presumed to be easily applied in the practical fields.

  • PDF

Stability Estimation of NATM Tunnel due to Excavation using Back Analysis (역해석기법을 통한 NATM 터널의 안정성 평가)

  • Lee, Jae-Ho;Kim, Young-Su;Jin, Guang-Ril;Park, Jin-Kyu;Park, Si-Hyun;Choi, Chil-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.494-504
    • /
    • 2008
  • Successful design, construction and maintenance of NATM tunnel demands prediction, control, stability estimation and monitoring of surface settlement, gradient and ground displacement with high accuracy. Back analysis using measured data and forward analysis have been and are indispensable tools to achieve this goal. Sakurai provided the hazard warning levels for assessing the stability of tunnels using the relation of critical strain and apparent Young's modulus. This paper performed the estimation of tunnel stability on construction. Firstly, the apparent Young's modulus concept and back analysis method is introduced for the assessment of tunnel safety during excavation a brief framework. Secondly, this paper deals with case study using "Apparent Young's modulus" and "Back analysis" for the purpose of estimating the stability of NATM tunnel in Korea. Finally, a general method that can be estimated the tunnel stability discussed by a flow chart.

  • PDF

Field Experiment on the Optimization of Concave-Shaped Face Development for Rapid Tunnel-Whole-Face Excavation (대단면 급속시공을 위한 최적의 곡면막장형상개발에 관한 현장실험)

  • Kim, Tae-hyoung;Yoon, Ji-sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.65-76
    • /
    • 2006
  • In this study, NATM can reduce the loosened ground near the tunnel face more than the other pre-existing tunnelling methods, because of rapid supporting by means of shotcrete and rock bolts. However, this method sometimes can not help for a unstable tunnel face with a unsupported caondition. In order to keep from that dangerous case, some excavation methods such as bench cut and drift advancing method are introduced, despite of high construction cost and period. So, this thesis is intended to introduce the new tunnel face shape, that is concave shaped face, and discusses its effects on the tunnel stabilization.

  • PDF

A Study on Notch Bit System for Controlling Blast Vibration and Over-break in Rock Mass (발파공해 해소 및 여굴 최소화를 위한 선균열 암굴착 노치장비 개발에 관한 연구)

  • Jeong, Dong-Ho;Moon, Sang-Jo;An, Dae-Jin;Jeong, Won-Joon;Kim, Eun-Kwan;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.17 no.3 s.68
    • /
    • pp.216-224
    • /
    • 2007
  • Blasting, using shock and dynamic energy of explosive, is very effective tunnel excavation method. But it had serious problem which is the blast vibration and over-break. In recent study, pre-cracked excavation method using notch hole reduced blast vibration and over-break in tunnel, so we performed study about developing notch bit system for making notch hole. In order to make notch hole effectively we had perform drilling experiments changing length and height of notch and in order to improve speed and precision of drilling we had developed notch bit system which consists of drilling bit, notch bit, adapter and notch guide.

Sequential prediction of TBM penetration rate using a gradient boosted regression tree during tunneling

  • Lee, Hang-Lo;Song, Ki-Il;Qi, Chongchong;Kim, Kyoung-Yul
    • Geomechanics and Engineering
    • /
    • v.29 no.5
    • /
    • pp.523-533
    • /
    • 2022
  • Several prediction model of penetration rate (PR) of tunnel boring machines (TBMs) have been focused on applying to design stage. In construction stage, however, the expected PR and its trends are changed during tunneling owing to TBM excavation skills and the gap between the investigated and actual geological conditions. Monitoring the PR during tunneling is crucial to rescheduling the excavation plan in real-time. This study proposes a sequential prediction method applicable in the construction stage. Geological and TBM operating data are collected from Gunpo cable tunnel in Korea, and preprocessed through normalization and augmentation. The results show that the sequential prediction for 1 ring unit prediction distance (UPD) is R2≥0.79; whereas, a one-step prediction is R2≤0.30. In modeling algorithm, a gradient boosted regression tree (GBRT) outperformed a least square-based linear regression in sequential prediction method. For practical use, a simple equation between the R2 and UPD is proposed. When UPD increases R2 decreases exponentially; In particular, UPD at R2=0.60 is calculated as 28 rings using the equation. Such a time interval will provide enough time for decision-making. Evidently, the UPD can be adjusted depending on other project and the R2 value targeted by an operator. Therefore, a calculation process for the equation between the R2 and UPD is addressed.

A case study on the optimal tunnel design based on risk analysis (위험도 분석에 근거한 최적 터널설계 사례)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.5
    • /
    • pp.379-387
    • /
    • 2010
  • In this study, a case study was introduced for the design of a twin tunnel along high speed national highway Route 12 from Damyang to Sungsan. It was related to determine the optimal tunnel support pattern and excavation method based on a risk analysis in order to incorporate the uncertainty of ground properties. To this end, three alternatives with different amounts of support and excavation method were selected and risk analysis was performed by applying Monte Carlo simulation technique, respectively. Stability of the tunnel was quantified by the factor of safety. To improve the result, the 729 cases of the combination of ground properties (deformation modulus, cohesion, and internal friction angle) satisfying a Gaussian distribution were generated and applied. Also, stability of the tunnel was confirmed by analyzing the distribution of both displacement and shotcrete bending stress.

New Observational Design and Construction Method for Rock Block Evaluation of Tunnels in Discontinuous Rock Masses (불연속성 암반에서의 터널의 암반블럭 평가를 위한 신 정보화설계시공법)

  • Hwang Jae-Yun
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.1-10
    • /
    • 2006
  • Rock masses in nature include various rock discontinuities such as faults, joints, bedding planes, fractures, cracks, schistosities, and cleavages. The behavior of rock structures, therefore, is mainly controlled by various rock discontinuities. In many tunnels, enormous cost and time are consumed to cope with the failing or sliding of rock blocks, which cannot be predicted because of the complexity of rock discontinuities. It is difficult to estimate the properties of rock masses before the rock excavation. The observational design and construction method of tunnels in rock masses is becoming important recently. In this paper, a new observational design and construction method for rock block evaluation of tunnels in discontinuous rock masses is proposed, and then applied to the tunnel based on actual rock discontinuity information observed in the field. It is possible to detect key blocks all along the tunnel exactly by using the numerical analysis program developed far the new observational design and construction method. This computer simulation method with user-friendly interfaces can calculate not only the stability of rock blocks but also the design of supplementary supports. The effectiveness of the proposed observational design and construction method has been verified by the confirmation of key block during the enlargement excavation.