Field Experiment on the Optimization of Concave-Shaped Face Development for Rapid Tunnel-Whole-Face Excavation

대단면 급속시공을 위한 최적의 곡면막장형상개발에 관한 현장실험

  • 김태형 (인하대학교 토목공학과 대학원) ;
  • 윤지선 (인하대학교 환경토목공학과)
  • Published : 2006.03.30

Abstract

In this study, NATM can reduce the loosened ground near the tunnel face more than the other pre-existing tunnelling methods, because of rapid supporting by means of shotcrete and rock bolts. However, this method sometimes can not help for a unstable tunnel face with a unsupported caondition. In order to keep from that dangerous case, some excavation methods such as bench cut and drift advancing method are introduced, despite of high construction cost and period. So, this thesis is intended to introduce the new tunnel face shape, that is concave shaped face, and discusses its effects on the tunnel stabilization.

기존의 NATM과 같은 터널공법에서는 불착 직후 벽연은 숏크리트나 록볼트에 의하여 지지되기 때문에 재래공법과 비교하여 암반의 느슨함을 감소시킬 수 있으나, 막장은 통상 무지보 상태로 놓여있기 때문에 붕괴의 위험성을 항상 내포하고 있는 것이 현실이다 현재 국내 터널시공시에는 막장이 굴진방향에 직립합A로써 응력의 집중이 발생하며 또한 막장의 안정성을 우려하여 단연분할공법을 채택하는 것이 일반적 공법으로 되어왔다. 그러나 이러한 방법은 경제적우로 큰 부당이 되며 공사기간 연장의 한 원인이 된다. 따라서 곡연막장 굴착공법을 개발하여 적용한다면 보다 나은 응력상태를 유지할 수 있어 1회 불진장의 증대 및 분할공법을 피함으로써 공사비절감 및 공사기간 단측에 매우 유리할 것이라 판단된다.

Keywords