This study aims at investigating the effects of Government R&D subsidies. We analyse the effects of inputs and behavioral additionality on the output additionality. We also measure the moderate effects of the experiences of benefiting from government R&D on the relationship between inputs and behavioral additionality and the output additionality. We conducted a structured questionnaire on the companies who have participated in promotion program of the Korea Innovation Cluster. 126 responses were collected and alnalysed using the OLS technique. Empirical results show that the relationship between input/behavioral additionality (management, follow-up, cognitive capacity) and output additionality had positive effect. The moderating effects of experiences of R&D subsidy on the relationship between input additionality and output additionality and the relationship between cognitive additionality and the output additionality appear to be statistically significant.
This paper attempts to investigate how and why the additionality effects occur in the case when a firm receives government subsidy as opposed to counterfactual situation. To demonstrate this, we selected 12 SMEs(small and medium enterprises) firms in Daejeon area and have conducted multiple case studies. In order to analyse the multiple cases of firms, we classified firms innovative activities into three stages which are composed of input, behaviour and output stages and related various factors. Furthermore, we investigated the differences according to types of firms and stages of firm growth. Empirical results show that various input, behaviour and output additionality effects exist when firms receive public subsidies. Compared to companies in the growth and mature stages, startup phase companies depend on government subsidy extensively and they use public subsidies strategically to develop new product and to change their strategic direction. The attitude of firms to use government subsidies is different according to their types and stage of growth as well.
Park, Keum-Joo;Jung, Jae-Soo;Lee, Moon-Gu;Kim, Doo-Hoon
New & Renewable Energy
/
v.2
no.1
s.5
/
pp.66-71
/
2006
CDM(Clean Development Mechanism) is one of three Kyoto mechanisms. As a non-annex I party of UNFCCC, Korea can host CDM projects. Currently eight CDM projects are hosted in Korea under Kyoto protocol. Six of these CDM projects are related to renewable energy power generation. Renewable energy power plants assumes zero GHGs emission and has great potential to become COM projects which is very environmental friendly energy. Gangwon wind park CDM project is the first renewable CDM project in Korea. In this research, emission factors and additionality proving process are studied, which are important procedures of doing CDM project.
Kai. Li.;Robert Tiong L. K.;Maria Balatbat ;David Carmichael
International conference on construction engineering and project management
/
2009.05a
/
pp.272-275
/
2009
Carbon finance is the investment in Greenhouse Gas (GHG) emission reduction projects in developing countries and countries with economies in transition within the framework of the Kyoto Protocol's Clean Development Mechanism (CDM) or Joint Implementation (JI) and with creation of financial instruments, i.e., carbon credits, which are tradable in carbon market. The additional revenue generated from carbon credits will increase the bankability of projects by reducing the risks of commercial lending or grant finance. Meantime, it has also demonstrated numerous opportunities for collaborating across sectors, and has served as a catalyst in bringing climate issues to bear in projects relating to rural electrification, renewable energy, energy efficiency, urban infrastructure, waste management, pollution abatement, forestry, and water resource management. Establishing additionality is essential for successful CDM project development. One of the key steps is the investment analysis. As guided by UNFCCC, financial indicators such as IRR, NPV, DSCR etc are most commonly used in both Option II & Option III. However, economic indicator such as Economic Internal Rate of Return(EIRR) are often overlooked in Option III even it might be more suitable for the project. This could be due to the difficulties in economic analysis. Although Asian Development Bank(ADB) has given guidelines in evaluating EIRR, there are still large amount of works have to be carried out in estimating the economic, financial, social and environmental benefits in the host country. This paper will present a case study of a CDM development of a 18 MW hydro power plant with carbon finance option in central Vietnam. The estimation of respective factors in EIRR, such as Willingness to Pay(WTP), shadow price etc, will be addressed with the adjustment to Vietnam local provincial factors. The significance of carbon finance to Vietnam renewable energy development will also be addressed.
The government has supported the innovation of private firms by intervening the market for various purposes, such as preventing market failure, alleviating information asymmetry, and allocating resources efficiently. Although the government's R&D budget increased rapidly in the 2000s, it is not clear whether the government intervention has made desirable impact on the market. To address this, the current study attempts to explore this issue by doing a systematic literature review on foreign and domestic papers in an integrated way. In total, 168 studies are analyzed using contents analysis approach and various lens, such as policy additionality, policy tools, firm size, unit of analysis, data and method, are adopted for analysis. Overlapping policy target, time lag between government intervention and policy effects, non-linearity of financial supports, interference between different polices, and out-dated R&D tax incentive system are reported as factors hampering the effect of the government intervention. Many policy prescriptions, such as program evaluation indices reflecting behavioral additionality, an introduction of policy mix and evidence-based policy using machine learning, are suggested to improve these hurdles.
This paper considers major three steps to arrive at accurate baseline emissions against which actual emission reductions attributable to CDM projects are accounted for. The first step is to select most likely baseline scenario among plausible alternatives. Then, the additionality of the project in question would be assessed by demonstrating that the project is not included in the baseline scenario selected. Finally, baseline emissions are calculated under the baseline scenario. In this paper, these three steps are integrated into a single flow chart in order to help understand the procedures for application of a baseline methodology better. Following the flow chart, a landfill gas-to-electricity project in Korea is analyzed as a case study. In consequence, this paper concludes that landfill gas-to-electricity projects in Korea have great potential for CDM projects, and it could also be concluded that data availability and reliability are a prerequisite for successful application of baseline methodologies for landfill gas projects to Korean specific situations.
Journal of Korean Society for Atmospheric Environment
/
v.27
no.2
/
pp.209-213
/
2011
Enforcement Decree of the Framework Act on Low Carbon, Green Growth for achieving the country's GHG emission reduction goal of 30% was in effect. The remarkable content of the Act is the managements of targets for GHG reduction. So, the entities that have reduced voluntarily have much interest in the recognition of 'early action'. The recognition of early action is necessary to induce the fair competence of business entities and promote the voluntary GHG reduction. The definite and concrete guidance should be prepared. The important principles for this are the environmental integrity and the additionality. Based on this, the early action activities must be restricted to the voluntary, real, permanent, quantifiable, verifiable reduction. In the early action recognition, its credit should be allocated additionally set aside from the GHG target allocation in the national total allowance. Through this, the reward for the early reduction should be realized on market mechanism. The effective period to award the early action should be addressed. This can be the period after the enactment of framework on GHG reduction in effect and before the beginning year of GHG target control. It should be set with flexibility through the collection and consultation of the sector's opinions. The appropriate allowance reserve of early action was estimated as approximately 1~1.5% by using the data from the 'Pilot GHG Emission Trading Program' operated by Ministry of Environment. Also, the concrete and detail guidance to construct the necessary infra which is used to register the related information of early action activities should be prepared.
The green premium is the most important feature of Korea's RE100 system. Green premium has three characteristics. The first, the cost of implementation is lower than that of other means of implementation. The second, it is linked with the RPS system to keep the means of implementing the green premium low. Third, the funds raised by the green premium are used to supply renewable energy to compensate for the additionality that the green premium does not have. When the entire industrial sector's electricity consumption is converted to renewable energy, the implementation cost of the green premium is estimated to be 3,377.4 billion won, and the REC purchase is estimated to incur the implementation cost of 6,576.4 billion won, which is 3.5 trillion more than the green premium. It was analyzed that an additional implementation cost of KRW 100 million would occur. In addition, in the case of solar PPA, it was analyzed that additional implementation costs of KRW 13,375.7 billion to KRW 16,162.3 billion were incurred. It was estimated that the renewable energy that could be supplied to the green premium would at least be sufficient for companies exporting to the US and EU. In addition, it was analyzed that when the fund created as a green premium is used for renewable energy supply, about 30.7% of the renewable energy supply through PPA can be supplied. However, as ESG is emphasized, green premium can be criticized by green washing because there is no additionality. There is also a limit to responding to the EU's CBAM. Therefore, companies can use the green premium depending on the situation, but it is more advantageous to use PPA, etc. The government needs to sufficiently maintain the supply of renewable energy using the fund to maintain the green premium.
Park, Keum-Joo;Jung, Jae-Soo;Lee, Moon-Gu;Kim, Doo-Hoon
한국신재생에너지학회:학술대회논문집
/
2006.06a
/
pp.298-303
/
2006
CDM(Clean Development Mechanism) is one of three Kyoto mechanisms. As a non-annex I party of UNFCCC, Korea can host CDM projects. Currently eight CDM projects are hosted in Korea under Kyoto protocol. Six of these CDM projects are related to renewable energy power generation. Renewable energy power plants assumes zero GHGs emission and has great potential to become CDM projects which is very environmental friendly energy Gangwon wind park CDM project is the first renewable CDM project in Korea. In this research, emission factors and additionality proving process are studied, which are important procedures of doing CDM project.
Korean government had used public 'credit guarantee schemes' (CGS) as a counter-cyclical measure. However, it is still controversial about the effectiveness of policy financing on the SMEs. Criticism on policy financing involves the argument that supporting enterprises hampers competition and innovation of SMEs by increasing their dependence on the government and delays the exit of marginal firms. In this paper, we investigate how to effectively build up the rationale of running public CGSs. At the same time, we propose the ways to coexist of public credit guarantee and market-based private finance system for SMEs. First, CGS, as a counter-cyclical function, must coexist with the private financial system by compensating the market failure caused by pro-cyclical behavior of the private financial market. Second, CGS has the comparative advantages, compared to both the interest rate policy of the central bank and fiscal policy of the government. The credit guarantee is the symptomatic treatment that could revitalize the economy shortly by providing liquidity. Also, knowing that CGS is provided based on the leverage ratio defined by outstanding guarantee divided by capital fund, public 'credit guarantee' (CG) has an advantage that is free from the risk of government deficit. Third, the reason for existence of the CGS should be founded in supporting services for SMEs, available only in a public sector that is difficult to expect from private banks. In this regard, it is desirable to strengthen the publicness of credit guarantee over the support for start-ups, growing companies, the improvement of productivity, increase of exports, a long-term investment in facilities, the employment-creating businesses, and innovative enterprises.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.