• Title/Summary/Keyword: UP-SET

Search Result 8,115, Processing Time 0.035 seconds

Characteristics of Oceanographic Environment in a Building with a Sea Area for the Artificial Upwelling Structure. (인공용승구조물 설치해역의 해양환경 특성)

  • Kim Dong-Sun;Hwang Suk-Bum
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2005.11a
    • /
    • pp.133-137
    • /
    • 2005
  • To investigated the variation of marine environments due to set up of artificial structure, we carried out field observations. High temperature and salinity waters were distributed clearly in the southeastern part of study area during summer season. The variation of current structure was also occurred around study area where artificial structure set up. In 2005 after set up of artificial structure, the nutrient concentration increased greater than that in 2002 before set up artificial structures. To illustrate the characteristics of marine environment due to set up of artificial structure, quantitative analyses on the effect of artificial structure are important.

  • PDF

The dose distribution and DVH change analysis wing to effect of the patient setup error (환자 SET-UP ERROR에 따른 선량분포와 DVH 변화 분석)

  • Kim KyoungTae;Ju SangGyu;Ahn JaeHong;Park YoungHwan
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.16 no.2
    • /
    • pp.81-89
    • /
    • 2004
  • Introduction : The setup error due to the patient and the staff from radiation treatment as the reason which is important the treatment record could be decided is a possibility of effect. The SET-UP ERROR of the patient analyzes the effect of dose distribution and DVH from radiation treatment of the patient. Material & Methode : This test uses human phantom and when C-T scan doing, It rotated the Left direction of the human phantom and it made SET-UP ERROR , Standard plan and 3mm, 5mm, 7mm, 10mm, 15mm, 20mm with to distinguish, it made the C-T scan error. With the result, The SET-UP ERROR got each C-T image Using RTP equipment It used the plan which is used generally from clinical - Box plan, 3Dimension plan( identical angle 5beam plan) Also, ( CTV+1cm margin, CTV+0.5cm margin, CTV+0.3,cm margin = PTV) it distinguished the standard plan and each set-up error plan and The plan used a dose distribution and the DVH and it analyzed Result : The Box4 the plan and 3Dimension plan which it bites it got similar an dose distribution and DVH in 3mm, 5mm From rotation error and Rectilinear movement( $0\%{\sim}2\%$ ). Rotation error and rectilinear error 7mm, 10mm, 15mm, 20mm appeared effect it will go mad to a enough change in treatment ( $2\%{\sim}^11\%$ ) Conclusion : The diminishes the effect of the SET-UP ERROR must reduce move with tension of the patient Also, we are important accessory development and the supply that it reducing of reproducibility and the move

  • PDF

A sutyd on Production Scheduling and Capacity Requirements in Discrete Demand, Fixed Production Quantity System (이산수요, 고정량 생산시스템의 생산일정과 소요용량에 관한 연구)

  • 김만수;강석호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.13 no.2
    • /
    • pp.59-65
    • /
    • 1988
  • This paper discusses the problem of coordinating aggregate planning and production schedules, minimizing the combined set-up inventory and capacity costs. In this study, by using the relation of fixed production quantity and the number of set-up we develop a heuristirc procedure of solving the discrete demand, fixed production quantity, variable capacity problem. First, we obtain the trade-off between set-up cost and capacity cost, then search the point minimizing the combined inventory and capacity costs.

  • PDF

A Scheduling Strategy for Reducing Set-up Time and Work-In-Process in PCB Assembly Line (PCB조립 라인의 준비 시간 단축 및 재공품 감소를 위한 스케줄링 전략)

  • 이영해;김덕한;전성진
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.1
    • /
    • pp.25-49
    • /
    • 1997
  • Printed circuit board (PCB) assembly line configuration is characterized by very long set-up times and high work in process (WIP) inventory level. The scheduling method can significantly reduce the set-up times and WIP inventory level. Greedy sequence dependent scheduling (GSDS) method is proposed based on the current methods. The proposed method is compared with the current method in terms of three performance measures: line throughput, average WIP inventory level, and implementation complexity.

  • PDF

Research on the optimization method for PGNAA system design based on Signal-to-Noise Ratio evaluation

  • Li, JiaTong;Jia, WenBao;Hei, DaQian;Yao, Zeen;Cheng, Can
    • Nuclear Engineering and Technology
    • /
    • v.54 no.6
    • /
    • pp.2221-2229
    • /
    • 2022
  • In this research, for improving the measurement performance of Prompt Gamma-ray Neutron Activation Analysis (PGNAA) set-up, a new optimization method for set-up design was proposed and investigated. At first, the calculation method for Signal-to-Noise Ratio (SNR) was proposed. Since the SNR could be calculated and quantified accurately, the SNR was chosen as the evaluation parameter in the new optimization method. For discussing the feasibility of the SNR optimization method, two kinds of PGNAA set-ups were designed in the MCNP code, based on the SNR optimization method and the previous signal optimization method, respectively. Meanwhile, the single element spectra analysis method was proposed, and the analysis effect of single element spectra as well as element sensitivity were used for comparing the measurement performance. Since the simulation results showed the better measurement performance of set-up designed by SNR optimization method, the experimental set-ups were built for the further testing, finally demonstrating the feasibility of the SNR optimization method for PGNAA setup design.

Prediction of Longshore Current with Set-up/down Effect on a Plane Beach (일정경사 수심단면에서 평균수위의 상승/저하 효과를 고려한 해빈류의 예측)

  • Lee, Cheol-Eung;Kim, Young-Jung;Choi, Han-Kyu
    • Journal of Industrial Technology
    • /
    • v.17
    • /
    • pp.277-289
    • /
    • 1997
  • The numerical model for prediction of longshore current with set-up/down effect on a plane beach is developed using the longshore component of the depth-integrated momentum balance equation. To predict the longshore current, the wave height model should first be formulated because the longshore current depends on the wave height directly. Two wave model, regular wave model and random wave model, are developed based on the energy flux balance equation. Also, the numerical model estimating the set-up inside the shoreline is developed using both the on-offshore momentum equation and the moving boundary technique. The numerical models are verified by the analytical solution, and compared with laboratory data. It is found from the comparison that developed models may be predicted accurately the longshore current with set-up/down effect on a plane beach.

  • PDF

Development of a Finishing-Mill Set Up Program for Calculating Pass Schedule In Mini Process (미니밀 마무리압연기의 Pass Schedule 설정 프로그램 개발)

  • 이호국;박해두;최갑춘
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1996.03a
    • /
    • pp.101-109
    • /
    • 1996
  • Mini-mill process which is one of the new steel -marking technologies to be able to produce the hot rolled coils by thin slab caster of ISP(In-Line Strip Production) type, will be completed in the Kwangyang Steel Works of POSCO in August, 1996, SEt-Up Model of finishing mill which consists of 5 stands is the most basic and essential in mini-mill plant. Therefore, the simulation program of Finishing-mill Set-Up model were developed in this research , using new temeprature prediction model, roll gap model and rolling physical model. Using the developed FSU program , pass schedules to produce the strips with target strip thickness of 1.8mm, 2.0mm, 2.3mm, 2.7mm an d3.0mm were also determined respectively.

  • PDF

Analysis of a Production Systems with Early Set-up and Post-operation (조기 준비기간과 후공정을 갖는 생산시스템의 분석)

  • ;;;Kim, S. C.;Yoon, S. H.;Park, N. I.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.3
    • /
    • pp.99-111
    • /
    • 1997
  • We consider a production system with post-operation and early set-up. As soon as there are no more units(raw materials) to process and the machine becomes idle, it undergoes a post-operation. After the post operation, if the number of waiting units is greater than or equal to m, it begins a set-up. After the set-up, if the number of units is greater than or equal to N($\geq$m), it begins to process the units. We first analyze the system by employing the decomposition property of the vacation queue. We, then, propose an algorithm that finds the optimal threshold values ($m^*$, $N^*$). Finally we present some numerical examples and interprete the system behavior.

  • PDF

Development of Set-up Model for Elongation Control in Steel Skin Pass Mill (조질압연에서의 연신율제어를 위한 set-up 모델 개발)

  • 이원호
    • Transactions of Materials Processing
    • /
    • v.10 no.2
    • /
    • pp.130-136
    • /
    • 2001
  • The mathematical set-up model was developed to reduce the mechanical property deviation in annealed and slightly rolled steel strip. The mechanical peculiarities of skin pass rolling process, such as high friction value and non-circular contact arc, low reduction and non-negligible entry and exit elastic zones as well as central restricted deformation zone are all taken into account. The deformation of work rolls is calculated with the influence function method and arbitrary contact arc shape is permitted. The strip deformation is modeled by slab method and the entry and exit elastic deformation zones are included. The strip restricted deformation zone near the neutral point is also considered. It was revealed that the new model has better accuracy than present regression model by statistical analysis with actual mill rolling data.

  • PDF

Development of set-up model for elongation control in steel skin pass mill (강판의 연신율제어를 위한 Set-Up 모델 개발)

  • 이원호;이규택;류율리
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.317-317
    • /
    • 2000
  • The mathematical set-up model was developed to reduce the mechanical property deviation in annealed and slightly rolled steel strip. The mechanical peculiarities of temper rolling process, such as high friction value and non-circular contact arc, Low reduction and non-negligible entry and exit elastic zones as well as central restricted deformation zone are all taken into account. The deformation of work rolls is calculated with the influence function method and arbitrary contact arc shape is permitted. The strip deformation is modeled by slab method and the entry and exit elastic deformation zones are included. The restricted deformation Bone near the neutral point is also considered. It was revealed that the new model has better accuracy than present regression model by statistical analysis with actual mill rolling data.

  • PDF