A sutyd on Production Scheduling and Capacity Requirements in Discrete Demand, Fixed Production Quantity System

이산수요, 고정량 생산시스템의 생산일정과 소요용량에 관한 연구

  • Published : 1988.12.01

Abstract

This paper discusses the problem of coordinating aggregate planning and production schedules, minimizing the combined set-up inventory and capacity costs. In this study, by using the relation of fixed production quantity and the number of set-up we develop a heuristirc procedure of solving the discrete demand, fixed production quantity, variable capacity problem. First, we obtain the trade-off between set-up cost and capacity cost, then search the point minimizing the combined inventory and capacity costs.

Keywords

References

  1. J.Opl.Res.Soc v.35 no.5 An Intergrated Model for Master Scheduling, Lot Sizing and Capacity Requirement planning Bahl,H.C.;Ritzman.L.P.
  2. Decision Science v.10 Heuristic Lot-Sizing and Sequencing Roles in a Multistage Production-Inventory System Biggs,J.R.
  3. Decision Science v.8 Disaggregation in Manufacturing and Service Organizations : Survey of Problems and Research Krajewski,L.J.;Ritzman,L.P.
  4. Interfaces v.13 A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems Maxwell,W.;Muckstadt,J.A.;Thomas,L.J.;Vander Eecken,J.
  5. Int. J. Prod. Res. v.25 no.7 Material Requirements Planning in Hierachical Production Planning Systems Meal,H.C.;Wachter,M.H.;Whybark,D.C.
  6. Mgt. Sci. v.21 Multi-item Lot Size Scheduling by Heuristic Part 1 : With Fixed Resources, Part 2 : With Variable Resources Newson,E.F.P.
  7. Mgt. Sci. v.12 no.10 An Operational System for Smoothing Batch-Type Production O'Mally,R.L.;Elmaghraby,S.E.;Jeske,J.W.
  8. Int. J. Prod, Res. v.23 no.3 Progress in Integrating and Optimizing Production Plans and Schedules Seward,S.M.;Taylor,S.G.;Bolander,S.F.