• Title/Summary/Keyword: Public Surveying Regulations

Search Result 14, Processing Time 0.027 seconds

A Study on the Site Calibration of Network RTK Surveying (네트워크 RTK 측량의 사이트 캘리브레이션 방안에 관한 연구)

  • Choi, Han Jun;Lee, Byoungkil;Yeon, Sang Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.99-107
    • /
    • 2013
  • With the expansion of the development and use of surveying equipment recently, by the establishment of infrastructure for network RTK surveying of the NGII, network RTK surveying has been widely used in surveying industry. Currently, in public surveying regulations, site calibration with minimum 5 evenly spaced bench marks is needed for using network RTK surveying results as leveling. But the range between and the number of bench marks for site calibration can be varied according to the geoid undulation. In this study, in order to verify this, Incheon area having regular geoid undulation and Taebaek area having irregular geoid undulation are selected as study area and network RTK surveying have been done. Then the accuracy of site calibration by range between and the number of bench marks have been compared. As a result of this study, in order to meet a tolerance of vertical precision (0.1m) that has been set in public surveying regulations, there is a necessity for improving the regulations so that the range and number of bench marks, to be used for site calibration of network RTK surveying, can be applied complementarily.

Improvement on Surveying Performance Evaluation for Public Surveying of Underground Facilities (지하시설물의 공공측량 성과심사 방법 개선에 관한 연구)

  • Jung, Choong Ho;KIM, Chong-Mun;KIM, Ki-Su;CHOI, Yun-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.2
    • /
    • pp.15-23
    • /
    • 2019
  • When the public surveying system was introduced in 1961, large scale surveying performances, such as infrastructure construction work, were dominant. However, due to changes in the environment, most of the current surveying performances focused on small scale underground facilities. The method of surveying underground facilities is as follows: "method of measurement before refilling after burying the pipeline" and "method of using exploration after refilling." There are advantages and disadvantages to each method. It became difficult to obtain the accuracy of the location of the underground facilities due to the fact that there were sections of the pipeline that had not been observed through exploration. Therefore, the 2017 performance evaluation regulations were revised. The revision included the addition of the "Underground Facilities Creation Period," a system that allows for surveys to be evaluated based on actual measurements. However, in this particular field, concerns about the advantages of exploration and the purpose of this study was to investigate the background and purpose of the limitations of the survey have been continuously raised. The purpose of this study was to investigate the background and purpose of the public surveying system and to identify the proportion of underground facilities surveying in comparison to public surveying. This study conducted surveys on the implementers of public surveying and those who did the actual surveying. The researcher has summarized the improvements that incorporate the analysis results and the field comments in the revised performance evaluation regulations in 2017.

System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology (토공측량 자동화 기술의 적용 활성화를 위한 제도개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.303-313
    • /
    • 2018
  • The purpose of this study is digitalization of earthwork such as development of 3D terrain analysis platform using latest technologies including unmanned aerial vehicle and terrestrial laser scanner to ultimately achieve earthwork automation. It is necessary to develop related element technologies and to establish regulations so that it can be applied to the domestic construction projects. As a result of pilot project about the earthwork surveying automation technology, it was confirmed that information such as terrain coordinates, soil, boring, and excavation volume is acquired smoothly. In this paper, we investigate related regulations and manuals in Japan and propose the improvement plan of domestic regulation. We plan to study regulations from early to final construction stage, combine with the 'regulation for public surveying', and improve the regulations in detail.

Surveying the Impact of Work Hours and Schedules on Commercial Motor Vehicle Driver Sleep

  • Hege, Adam;Perko, Michael;Johnson, Amber;Yu, Chong Ho;Sonmez, Sevil;Apostolopoulos, Yorghos
    • Safety and Health at Work
    • /
    • v.6 no.2
    • /
    • pp.104-113
    • /
    • 2015
  • Background: Given the long hours on the road involving multiple and interacting work stressors (i.e., delivery pressures, irregular shifts, ergonomic hazards), commercial drivers face a plethora of health and safety risks. Researchers goal was to determine whether and to what extent long-haul trucker work schedules influence sleep duration and quality. Methods: Survey and biometric data collected from male long-haul truck drivers at a major truckstop in central North Carolina over a six month period. Results: Daily hours worked (mean = 11 hours, 55 minutes) and frequency of working over government-mandated daily HOS regulations (23.8% "frequently or always") were statistically significant predictors of sleep duration. Miles driven per week (mean = 2,812.61), irregular daily hours worked (63.8%), and frequency of working over the daily hour limit (23.8% "frequently or always") were statistically significant predictors of sleep quality. Conclusion: Implications of findings suggest a comprehensive review of the regulations and operational conditions for commercial motor vehicle drivers be undertaken.

Accuracy Analysis of GNSS-based Public Surveying and Proposal for Work Processes (GNSS관측 공공측량 정확도 분석 및 업무프로세스 제안)

  • Bae, Tae-Suk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.457-467
    • /
    • 2018
  • Currently, the regulation and rules for public surveying and the UCPs (Unified Control Points) adapts those of the triangulated traverse surveying. In addition, such regulations do not take account of the unique characteristics of GNSS (Global Navigation Satellite System) surveying, thus there are difficulties in field work and data processing afterwards. A detailed procesure of GNSS processing has not yet been described either, and the verification of accuracy does not follow the generic standards. In order to propose an appropriate procedure for field surveys, we processed a short session (30 minutes) based on the scenarios similar to actual situations. The reference network in Seoul was used to process the same data span for 3 days. The temporal variation during the day was evaluated as well. We analyzed the accuracy of the estimated coordinates depending on the parameterization of tropospheric delay, which was compared with the 24-hr static processing results. Estimating the tropospheric delay is advantageous for the accuracy and stability of the coordinates, resulting in about 5 mm and 10 mm of RMSE (Root Mean Squared Error) for horizontal and vertical components, respectively. Based on the test results, we propose a procedure to estimate the daily solution and then combine them to estimate the final solution by applying the minimum constraints (no-net-translation condition). It is necessary to develop a web-based processing system using a high-end softwares. Additionally, it is also required to standardize the ID of the public control points and the UCPs for the automatic GNSS processing.

Revision of related Regulations and Construction Standards for the Use of Information on Underground Facilities Quality Level (지하시설물 품질등급 정보의 활용을 위한 관련 규정 및 건설기준 개정 방안)

  • Park, Joon Kyu;Kim, Tae Hoon;Kim, Won Dae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.4
    • /
    • pp.343-350
    • /
    • 2022
  • The computerization project for underground facilities in Korea began in earnest after the city gas explosion in Seoul in 1994, and the Daegu subway explosion in 1995. As such a large-scale gas explosion accident caused enormous economic loss including human casualties and potential benefits, the need for computerized for efficient management of underground facilities was greatly emphasized in society. Meantime, computerization of underground facilities has been carried out according to the basic plan for building national geographic information system. In this study, problems were identified based on the current status of construction and management of underground facility information, as well as laws and regulations, and directions for establishing quality standards were presented. In addition, construction work standards such as 「Public Survey Work Regulations」, design standards, standard specifications, and technical specifications, gas technology standards, design standards, and communication works so that underground facility information can be linked and utilized in construction work by examining the linkage of the underground facilities, the targets that can be used for quality level information on underground facilities were derived, and a proposal to revise the construction standards was presented. In the future, if the quality standards are established, it is expected that the accuracy and utilization in the construction field will be increased.

Comparison and analysis of spatial information measurement values of specialized software in drone triangulation (드론 삼각측량에서 전문 소프트웨어의 공간정보 정확도 비교 분석)

  • Park, Dong Joo;Choi, Yeonsung
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.4
    • /
    • pp.249-256
    • /
    • 2022
  • In the case of Drone Photogrammetry, the "pixel to point tool" module of Metashape, Pix4D Mapper, ContextCapture, and Global MapperGIS, which is a simple software, are widely used. Each SW has its own logic for the analysis of aerial triangulation, but from the user's point of view, it is necessary to select a SW by comparative analysis of the coordinate values of geospatial information for the result. Taking aerial photos for drone photogrammetry, surveying GCP reference points through VRS-GPS Survey, processing the acquired basic data using each SW to construct ortho image and DSM, and GCPSurvey performance and acquisition from each SW The coordinates (X,Y) of the center point of the GCP target on the Ortho-Image and the height value (EL) of the GCP point by DSM were compared. According to the "Public Surveying Work Regulations", the results of each SW are all within the margin of error. It turned out that there is no problem with the regulations no matter which SW is included within the scope.

A Study on the Improvement of Orthophoto Accuracy According to the Flight Photographing Technique and GCP Location Distance in Orthophoto Generation Using UAV (무인항공기를 활용한 정사영상제작에서 지상기준점 위치간격과 비행촬영기법에 따른 정사영상정확도 향상에 관한 연구)

  • Yun, Bu-Yeol;Yoon, Won-Sub
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.21 no.6
    • /
    • pp.345-354
    • /
    • 2018
  • It is conservative to say that lots of research is performed as measures to use UAV for application to the rapid spatial information and its application is faced with settlement stage to some extent. In addition, Korea Land and Geospatial Informatix Corporation autonomously produces work regulation which is applied to every kind of orders and National Geographic Information Institute (2018) has notified public surveying work instructions about unmanned aerial device for the rapid spatial information construction. The results acquired by UAV are comprised of contents about accuracy improvements for the orthophoto when reviewing pertinent regulations. The results acquired by UAV are comprised of contents about accuracy improvements for the orthophoto when reviewing pertinent regulations. As a result, it is known that error amount has been sharply increased from 400m separation distance, and this study proposes that cross flight is able to reduce irregular error occurrence as measures to acquire stable results.

Utilization of Real-time Aerial Monitoring System for Effective Damage Investigation of Natural Hazard (효율적인 자연재해 피해조사를 위한 실시간 공중자료획득시스템의 활용성 평가)

  • Jung, Kap Yong;Yun, Hee Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.4
    • /
    • pp.369-377
    • /
    • 2012
  • Recently, development of IT technology and enhancement of spatial information technology increases the necessity about effective technology of damage investigation in the area of disaster prevention. Quick damage investigation is necessary to deal with the natural hazard and plan the recovery. To do this, UAV is the useful mean for quick damage investigation. In this study, it was evaluated based on UAV that utilization of real-time aerial monitoring system for effective damage investigation of natural hazard. Accuracy analysis was implemented to evaluate the application of this system. And utilization of damage investigation was evaluated based on the domestic regulations that is appled the system according to the type of hazard. As a result, damage investigation was possible about house, farmland, agriculture and forestry facilities and public facilities. Henceforth, it will be effectively possible to inspect damage for natural disaster and to establish restoration plan through utilization of acceptable image data by Real-time Aerial Monitoring System in real various natural disaster.

Drone Operation Plan at Road Construction Site (도로건설 현장에서의 드론 운용방안)

  • Sung, Sang-Min;Yun, Bu-Yeol;Song, Mi-Hwa;Cho, Jun-Sang
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.709-716
    • /
    • 2020
  • Recently, the drone's equipment development and software technology have dramatically improved. With such developments, the applicability is increasing in various fields that require rapid geospatial information, and in practice, regulations and systems have been established, and the fields in use are increasing. Also, in Korea, corporations and public institutions are actually using and researching drones in fields such as aircraft development, communication technology development, construction site use, and surveying. However, there are no fields where drones are actually used in road construction sites. Therefore, in this study, to utilize drones that have been actively used in the civil engineering and construction fields for road construction, we investigated the current status of the Korea Highway Corporation's field drone use research and classified the possibility of drone introduction by road construction. Finally, a method of using drones at road construction sites was proposed to prepare a method for using drones at road construction sites.