These days Construction Industry is one of the major industry in public project and it has many problems. And Construction Industry highly respond to a chage of IT, politics, economy, domestic and international situation. And it causes an uncertainty in Korea economy. The goal of this paper is showing the efficiency application of BIM in Public Project. And this paper follow three steps. First, these day's trend of BIM and delivery method are researched. Second, major factors are thrived to appreciating BIM Third, delivery method based on BIM is proposed. Major factors of delivery method are researched to make guide line of delivery method in public project in the future.
The 3th International Conference on Construction Engineering and Project Management
/
pp.464-471
/
2009
Robot and application of IT skill of construction industry are slow comparatively than another thing industry by the feature. This research proposes progress management and real time information gathering through construction automation and RFID focused on steel structure construction. Building for RTPM system, must consider various variables and surrounding situation in construction field and it is the most important and difficult matter that draw right requirement and grasp relation between this requirements to accomplish one suitable task considering these environment. Therefore, in this study analyzes requirement and target for RTPM system based on scenario that is easy to draw requirement and apply this to use case model. Presented method suggests that represent relation between goals and way that refines goal systematically from requirement of RTPM system. And it could express for visualization through the Way that attaches nonfunctional elements of system with system internal goal.
The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there are also various tools or techniques applicable to that. In an organization, the application of project management develops gradually from low to high maturity, and the organization should choose and implement a method of application proper for the level of its maturity. This article suggests a method to reduce inefficiency of the management and how to apply risk management by levels of maturity for easier application. For this, the stages of project management maturity levels were divided into the introduction, development, and maturity step, and methods of risk management suitable for each stage were applied. And methods of risk management that need to be applied by the levels of project maturity are divided into three factors : risk management processes, risk management tools and techniques, and risk management standards and templates. It is expected to be favorable approaches for the application of risk management in an organization to divide those factors into more concrete processes, tools, techniques, and standards and apply them by the levels of management maturity.
The Journal of Asian Finance, Economics and Business
/
제9권3호
/
pp.53-63
/
2022
Despite the relationship between cash flow, financial management, and project performance, no study examined the mediating role of financial management on the relationship between cash flow and construction project performance, especially in Kuwait. The goal of this study was to examine the impact of cash flow fluctuations on construction project performance, as well as the role of financial management in mediating this relationship. To accomplish these goals, the researcher employed a descriptive-analytical method to create a questionnaire of 31 items. The study's sample was chosen at random and includes (181) project managers and firm owners from contractors' companies in Kuwait. The study found a statistically positive and significant effect of cash flow variation on project performance from the perspective of Kuwaiti contractors at the significance level (0.05), as well as a mediated role of financial management in the relationship between cash flow variation and project performance. The research came up with a number of recommendations based on the findings, including the need for contractors to have a better understanding of cash flow to arrange project activities correctly and efficiently. Further studies may be included into the effect of cash flow forecasting (planning) and financial management (control) on various construction activities.
Companies are paying attention to project governance to realize their goal strategies, project success, and project value in a rapid and complex environment due to the development of information technology. This study aims to explore project governance and factors from literature review and practice guides related to project governance and empirically analyze the impact of project governance factors on IT project objective performance. The survey was conducted on project managers, project team members, and project management members with experience in carrying out business IT projects within two years at companies in various industries in Korea. The main conclusion is as follows. Among the project governance factors, disclosure and reporting that uses and reports using appropriate and reliable information about projects related to decision-making activities positively impact the achievement of IT project objectives: business success and stakeholder satisfaction. Among the project governance factors, project sponsorship, a role that effectively connects management and projects, and a project management framework that provides tools, procedures, resources, and techniques for projects positively impact IT project objective performance. This study is of academic and practical significance in that it identifies the definition and factors of project governance through companies in various industries in Korea and the positive impact of project governance factors on IT project objective performance.
The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.
The purpose of this study was to verity the effect of project method on the task performance ability in development of a solar-tracking-control-system of specialized high school. In order to carry out this study, 2 classes of technical high school in Jeonbuk are chosen as experimental and control groups. The experimental group was taught by project method and the control group was taught by traditional instruction. Project method was designed by 4 stages-selection of goal, planning, implementation and evaluation. According to these stages, experimental group's students carried out the project that developing solar tracking control system in solar generation. The results of this study are as follows; the project method was more effective than the traditional instruction in planning ability for task performance and implementation ability, subordinates of task performance ability. However, information gathering ability and evaluation ability on task performance, others in subordinates, it is not clear that the project method is more effective.
제약이론은 특정한 관리기술을 개발하는데 사용되는 접근방법이며, 철학이다. 운영관리상에 적용되었던 소설 "The Goal"에 의해서 처음으로 널리 보급되었다. 1997이후로 프로젝트관리의 두 가지 영역에서 적용되어 왔으며, 그 첫 번째 적용은 단일프로젝트에 대한 공기단축과 프로젝트 통제관리의 간소화를 위한 공정관리분야이며, 두 번째 적용은 동시에 수행되는 여러 프로젝트에 의해서 공유되는 자원의 효과적 관리이다. 이 논문은 프로젝트 관리에 적용된 제약이론인 애로사슬(Critical chain)의 원리에 대해서 연구하고, 국내의 건설프로젝트에 적용하는 것을 목적으로 한다.
한국해양정보통신학회 2004년도 SMICS 2004 International Symposium on Maritime and Communication Sciences
/
pp.80-84
/
2004
The goal of the project is to study and describe a new stressed state of High Temperature Superconducting (High-Tc) YBCO Films, to create of SQUIDs on the bases of these Films with maximal sensitivity. The problems of the project are: 1. The experimental studying of the stressed films growing by laser ablation method. 2. The studying of stressed film properties. 3. The making of the dc-SQUIDs with maximal sensitivity on the bases of the stressed YBCO films.
연구목적 크라우드펀딩 프로젝트의 성공요인에 대해 다양한 연구들이 시도되어 왔으나 아직까지도 국내외 연구는 제한적인 상황이다. 이에 따라 본 연구는 크라우드펀딩 프로젝트 커뮤니티를 둘러싼 정보기반(information-based) 및 행위 기반(behavior-based)의 사회적 상호작용뿐만 아니라 펀딩 모금액 달성이라는 공동의 목표가 프로젝트 성공에 미치는 영향에 대해 분석하고자 한다. 연구설계/방법론/접근법 본 연구를 위해 2016년 2월부터 8월까지 국내 대표적인 보상형 크라우드펀딩 플랫폼, 텀블벅(Tumblbug)에서 펀딩에 성공한 154개 크라우드펀딩 프로젝트들의 패널 데이터를 수집하였다. 이를 바탕으로 정보 기반의 사회적 상호작용 변수(정보 공유 횟수)와 행위 기반의 사회적 상호작용 변수(후원자수)가 크라우드펀딩 프로젝트 성공에 미치는 영향을 분석하였다. 또한 목표 달성 동기요인이 사회적 상호작용과 크라우드펀딩 프로젝트 성공 간의 관계를 조절하는지 살펴보았다. 결과 본 연구 결과에 따르면 정보 기반의 사회적 상호작용 및 행위 기반의 사회적 상호작용이 크라우드 펀딩 프로젝트 성공에 긍정적으로 유의한 영향을 미치는 것으로 나타났다. 또한 목표 달성 동기요인이 정보 및 행위 기반의 사회적 상호작용과 크라우드펀딩 프로젝트 성과 간의 관계를 조절한다는 것을 확인하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.