DOI QR코드

DOI QR Code

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project

대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로

  • Kim, Jeong-Guk (Korea Atomic Energy Research Institute, Nuclear Fuel Cycle Research Laboratory) ;
  • Ko, Won-Il (Korea Atomic Energy Research Institute, Nuclear Fuel Cycle Research Laboratory) ;
  • Ku, Jeong-Hoe (Korea Atomic Energy Research Institute, Nuclear Fuel Cycle Research Laboratory) ;
  • Nam, Hyo-On (Korea Atomic Energy Research Institute, Nuclear Fuel Cycle Research Laboratory)
  • 김정국 (한국원자력연구원, 핵연료주기기술연구소) ;
  • 고원일 (한국원자력연구원, 핵연료주기기술연구소) ;
  • 구정회 (한국원자력연구원, 핵연료주기기술연구소) ;
  • 남효온 (한국원자력연구원, 핵연료주기기술연구소)
  • Received : 2017.09.30
  • Accepted : 2017.12.07
  • Published : 2017.12.31

Abstract

The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

Keywords

References

  1. Ministry of Science and ICT (MSIT), Future Nuclear System Technology Development and Strategy (Draft), Decision of The 6th Nuclear Energy Promotion Committee (2016. 07.25.), 2016.
  2. NASA/SP-2007-6105 Rev1, "Systems Engineering Handbook", US National Aeronautics and Space Administration, 2007.
  3. Yongsoo Kim, et al, A study to Improve the Research Management of Big Science Projects, Report of National Research Foundation of Korea, 2014.
  4. KS A ISO 21500:2013, Guidance on Project Management, Korean Agency for Technology and Standards, 2013.
  5. ISO 21500, Guidance on project management, International Organization for Standard, 2012.
  6. KS X ISO/IEC 15288:2009, Information Technology - Systems and Software Engineering - System Life Cycle Processes, Korean Agency for Technology and Standards, 2009.
  7. ISO/IEC/IEEE 15288:2015, " Systems and software engineering - System life cycle processes", International Organization for Standard, 2015.
  8. Taekyong Lee and Joong-Yoon Lee, "A Systems Engineering Process Refinement: Focused on Technical Process", J. KOSSE, Vol.13(1), pp.41-50, 2017.
  9. IEEE STD 1220:2005, "IEEE standard for application and management of the systems engineering process", IEEE Computer Society, 2005.
  10. ANSI/EIA-632:1998, "Processes for engineering a system", Electronic Industries Alliance, 1998.
  11. ISO/IEC/IEEE-24748-4:2016, "Systems and software Engineering - life cycle management - Part 4", International Organization for Standard, 2016.
  12. ISO/IEC 12207:2008, "Information technology - Systems and software engineering - Software life cycle processes", International Organization for Standard, 2008.
  13. ISO/IEC 26702:2007, "Systems engineering - Application and management of the systems engineering process", International Organization for Standard, 2007.
  14. Ministry of Science and ICT (MSIT), Regulations on the Management, etc. of National R&D Projects, Presidential Order No. 28043 (2017.5.8.) / Regulations on the Management, etc. of National R&D Projects, Order of MSIT No. 94 (2017.5.23.), Ministry of Science and ICT, 2017.
  15. Korea Atomic Energy Research Institute (KAERI), Regulations on R&D Project Management (2017.8.31.), Guidance on Project Management (2015.10.12.), Regulation on Quality Assurance (2008.02.27.), The Basic Plan on Quality Assurance (2011.01.01.) KAERI.