• Title/Summary/Keyword: Post Environmental Management

Search Result 234, Processing Time 0.023 seconds

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

Establishment on Management Plan of Environmental Noise with Noise Map (소음지도를 활용한 환경소음 관리계획 수립)

  • Sun, Hyosung
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.2
    • /
    • pp.123-131
    • /
    • 2011
  • The objective of this study is to prepare the effective management plan of environmental noise with a noise map, and the guideline on the management plan of environmental noise was suggested through the review of existing application examples. The management plan of environmental noise with a noise map includes the practical contents in the stages of subdivision of management areas, establishment of reduction measures, opinion collection, post investigation, and reformulation of management plan. First, the classification of management regions is performed considering the excess degree of noise standard and the facility type in the phase of subdivision of management areas. Second, the optimal management plan is established through the investigation of regional characteristics and various noise reduction measures in the phase of establishment of reduction measures, which includes the examination of noise reduction effects with a noise map and the budget planning with the costing of noise reduction measures. Third, the opinion survey with a local resident and a expert is carried out in order to prove the validity of the management plan in the phase of opinion collection, and the management plan is modified with gathered opinions. Fourth, the post examination plan with noise measurement is performed in order to verify the real effect of noise reduction measures according to the management plan in the phase of post investigation. Finally, the amendment of the management plan as well as the improvement of a noise map is carried out at a regular cycle in the phase of reformulation of management plan.

A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업 사후관리 실태와 개선 방안)

  • Lee, Ji Hyun;Sung, Hyun Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Environmental Impact Assessment and Environmental Monitoring in Korea (한국에서의 환경영향평가와 환경측정)

  • Kang, In-Goo;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.31-39
    • /
    • 1995
  • Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.

  • PDF

Environmental Impact Assessment and Environmental Monitoring: Monitoring Factors and Organization (환경영향평가와 측정 : 환경처 업무 중심으로)

  • Kang, In-Goo;Chang, Chun-Ki;Han, Eui-Jung;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.69-75
    • /
    • 1994
  • Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.

  • PDF

Enhancing the Applicability and Improvement Direction of Integrated Environmental Permit System (통합환경허가시스템의 활용도 제고 및 개선방향)

  • Park, Jae Hong;Shin, Su Jeong;Lee, Dae Gyun
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.3
    • /
    • pp.339-345
    • /
    • 2018
  • The integrated environmental permit system is currently in operation online. It carries out various functions of postmanagement such as the submission of annual reports containing operations management data onto integrated management workplaces, the operation and management of emission facilities and prevention facilities, and the disclosure of information on the integrated permission. On the other hand, the integrated environmental permit system needs to perform various roles in order to stably manage and smoothly perform the permitting work. It is necessary to utilize this system to establish policies by using diverse operations management data onto integrated management workplaces collected in the integrated environmental permit system. This system can also play a role in improving the post-management system and user convenience after the permission review and approval processes. The integrated environmental permit system can be effectively used to set up the BAT-AEL because it collects all of the cross-media data and identifies the overall status of the workplace. In order to establish a post management system after the approval, it is necessary to provide performance management and performance evaluation functions as conditions of the permit after approval. In addition, a variety of support functions should be provided to enable the permission authority and the environmental expert examination agency to facilitate the review of permits. It will be necessary to provide an evaluation system and a proactive diagnostic function to determine whether permission conditions and permit emission standards will change in the future. Also, it is important to adopt an information exchange platform that can be used to collect the status data onto the workplaces; the platform can also be used as an information exchange site for technical working groups (TWG), and for collecting field experts' opinions.

Importance of biomass management acts and policies after phytoremediation

  • Song, Uhram;Park, Hun
    • Journal of Ecology and Environment
    • /
    • v.41 no.3
    • /
    • pp.93-98
    • /
    • 2017
  • Background: Although phytoremediation is a promising method for pollution control, biomass produced by the remediation process must be managed; otherwise, it will eventually return to the environment and cause secondary pollution. Therefore, research and policy development for the post-remediation management of biomass are both required. Results: While there are many published studies of phytoremediation, research into post-remediation management is very limited. Therefore, a new study using biomass as a co-composting material was conducted and showed positive effects on soil characteristics and plant performance. However, despite its potential, research and policies to promote this form of management are still lacking. Conclusions: We suggest public engagement in support of "Post-phytoremediation management" legislation that stipulates management of biomass after phytoremediation, promotes recycling of biomass with known environmental risks, and includes specific policies developed for managers. Further research to support and inform such policies and laws is also required.

A Comparative analysis of the Pre- and Post-Construction Image Analysis of the Nakdong Estuary as Coastal Tourism Resource

  • Yhang Wii-Joo;Cho Yoon-Shik
    • Journal of Environmental Science International
    • /
    • v.14 no.10
    • /
    • pp.905-910
    • /
    • 2005
  • The purpose of this study is the comparative analysis of Susan citizens' images of Eulsook-do as a coastal tourism destination before and after the construction of a road bridge across the Nakdong estuary in order to analyze local people's changes in leisure patterns. Analysis of the images of a pre-construction Eulsook-do that people aged both 40 and less and 50 and more had on five dimensions showed values higher than zero(0) that suggests neutral image, while their images of a post-construction Eulsook-do showed the shrinking size of pentagon on all five dimensions: ET(Entertainment), CA(Culture & Art), EE(Environment & Ecology), RC(Recreation) and LP(Leports) dimensions. Its pre- and post- construction image analysis conducted 20 years after it came to be built finds that the road bridge construction has led to the ecological, environmental disruption of the coast and the lower Nakdong river, having negative influence on the images of Eulsook-so.

A Study on the Site Selection of Unmanned Post Office Considering the Operation Cost by the Mail Volume (우편물량 규모에 따른 운영비용 기준의 무인화 대상우체국 선정에 관한 연구)

  • Choi, Jiyoung;Lee, Jeong-hun
    • Korean Management Science Review
    • /
    • v.33 no.3
    • /
    • pp.1-18
    • /
    • 2016
  • Recently, ordinary mail is decreasing continuously by the development of ICT (Information and Communications Technology) including E-mail, messenger service, and etc. On the contrary, parcel post is increasing by the increase of online shopping, home shopping, and etc. Aside from these changes, the demand for various mail acceptance and delivery means is increasing with the increase of single households and dual-income couples. To overcome these environmental changes, Korea Post installs unmanned post offices which are composed of various unmanned mail acceptance and delivery postal systems. In this paper, we propose the methodological approach for the site selection of unmanned post office among the existing post offices and the installation standard of unmanned postal system considering the operation cost by the mail volume.