• 제목/요약/키워드: PLANNING AND MANAGEMENT

검색결과 6,172건 처리시간 0.03초

건설프로젝트 계획단계에서 폐기물 관리방안 연구 (A Study on Waste Management Method of Construction Project in Planning Stage)

  • 조성;조용;박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF

컨벤션시스템의 서비스 품질제고를 위한 최적운영계획 수립 (The Optimal Operating Planning of Convention Systems for Service Quality)

  • 김창대;문재영
    • 품질경영학회지
    • /
    • 제36권1호
    • /
    • pp.40-48
    • /
    • 2008
  • The purpose of this study is to rationally manage service facilities of convention center. This study is to develop the algorithm to consider optimal assignment and optimal operation system planning for convention center. The scheduling algorithm of this study develops through constructing the mathematical model and analyzing the mathematical structure of variables and constraints in model. The scheduling algorithm develops to consist eight stage of optimal operation planning and five stage of optimal assignment planning. Especially, this study indicates that optimum answer through mathematical model and results of algorithm is nondiscrimination.

유연한 공급망 계획 모형 작성을 위한 모형관리자의 설계 및 구현 (Design and Implementation of Model Manager for Flexible Supply Network Planning Model)

  • 양영철;장양자;박찬권;박진우
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.40-48
    • /
    • 2002
  • Recently, in the competitive environments, every company recognizes the importance of supply network planning models. However, there are so many problems in correctly applying mathematical model to the real world. Because mathematical modeling packages charge planning managers with understanding the models and responsibility for generating plans, fast and accurate model cannot be generated with ease. In this paper, we design the model management system that helps planning managers flexibly create and modify mathematical models and manage model versions. We implement the system with model base concept.

규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구 (A Study on Project Management Scheduling Module Development using the Rule and CBR)

  • 신호균;김영준;전승호
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2004년도 춘계학술대회
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구 (A study on the development on project scope management module using rule and case-based reasoning)

  • 신호균;전승호;김창호
    • 정보학연구
    • /
    • 제7권3호
    • /
    • pp.127-137
    • /
    • 2004
  • 본 연구에서는 프로젝트의 계획단계에서 프로젝트 관리자가 수행해야 할 프로젝트에 대하여 규모, 범위, 기간, 성격 등의 측면에서 가장 유사한 과거의 사례를 찾아주고 이를 참조하여 WBS를 설계할 수 있도록 규칙과 사례기반 추론에 근거한 프로젝트 계획수립 지원모듈(PPSM: Project Planning Support Module)개발 방법을 제안한다.

  • PDF

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

EU Water Framework Directive-River Basin Management Planning in Ireland

  • Earle, R.;Almeida, G.
    • Environmental Engineering Research
    • /
    • 제15권2호
    • /
    • pp.105-109
    • /
    • 2010
  • The European Union (EU) Water Framework Directive (WFD) (2000/60/EC) was transposed into Irish law by Statutory Instrument Nos. 722 of 2003, 413 of 2005 and 218 of 2009, which set out a new strategy and process to protect and enhance Ireland's water resources and water-dependent ecosystems. The Directive requires a novel, holistic, integrated, and iterative process to address Ireland's natural waters based on a series of six-year planning cycles. Key success factors in implementing the Directive include an in-depth and balanced treatment of the ecological, economic, institutional and cultural aspects of river basin management planning. Introducing this visionary discipline for the management of sustainable water resources requires a solemn commitment to a new mindset and an overarching monitoring and management regime which hitherto has never been attempted in Ireland. The WFD must be implemented in conjunction with a myriad of complimentary directives and associated legislation, addressing such key related topics as flood/drought management, biodiversity protection, land use planning, and water/wastewater and diffuse pollution engineering and regulation. The critical steps identified for river basin management planning under the WFD include: 1) characterization and classification of water bodies (i.e., how healthy are Irish waters?), 2) definition of significant water pressures (e.g., agriculture, forestry, septic tanks), 3) enhancement of measures for designated protected areas, 4) establishment of objectives for all surface and ground waters, and 5) integrating these critical steps into a comprehensive and coherent river basin management plan and associated programme of measures. A parallel WFD implementation programme critically depends on an effective environmental management system (EMS) approach with a plan-do-check-act cycle applied to each of the evolving six-year plans. The proactive involvement of stakeholders and the general public is a key element of this EMS approach.

교통기획예산제도(TPBS) 도입방안에 관한 연구 (A Studyon Implementation of TPBS (Transportation-planning Programming Budgeting System))

  • 김종민
    • 대한교통학회지
    • /
    • 제13권1호
    • /
    • pp.153-165
    • /
    • 1995
  • The budget management in Korea is one-year budget system which is just following int he steps of last years budget plan. This system towards traditional item-by-item and restriction-centered budget system. The budget distribution without establishing and considering rational policy goals and directions have brought inefficient resource allocations. In order to promote the implementation of transportation planning, there are some alternatives like introduction of top-down planning system preparing for the provincial self-government era. In this study, the most efficient alternatives to promote the existing management system is referring by foreign countries transportation planning examples(BVWP system in Germany). First of all, mid-long term transportation and budget planning should be established and then make decisions of resource availability and allocation. In order to provide ration budget planning, introduction of Transportation Planning Programming Budget System(TPBS) has been judged as one of the method of unifying the sysematic transportation improvement planning and budgeting. All transporation planning and related activites can not be expressed in quantity and due to the limitation of excessive cost of analyzing transportation planning and ranking priority, here after, the continuous study to minimize the evaluation cost and introduction of TPBS should be done.

  • PDF

Using Fuzzy Set Theory in Project Planning Problem

  • Park, Seung-Hun;Chang, In seong
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.131-145
    • /
    • 1995
  • This paper presents a method for solving project planning problem which the opinions of experts greatly disagree in each activity processing time. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. And we introduce a pessimistic project planning with major TFNs and an optimistic project planning with minor. TFNs, and illustrate the approach using a combination of the existing composite and the comparison methods, which is used to solve the complex project planning problem.

  • PDF

초고속정보통신망 구축을 위한 기획분석 모형의 개발 및 분석 (Planning the Korea Information Infrastructure : Models and a Case Example)

  • 전용수;장석권
    • 경영과학
    • /
    • 제19권2호
    • /
    • pp.91-124
    • /
    • 2002
  • The use of network planning models and tools is essential for effective KII (Korea Information Infrastructure) planning and analysis in that it will significantly reduce the risk and uncertainty embeded in the development and the provision of future broadband services. The purpose of this study is to develop a theoretical framework and a computer tool for modeling the various aspects of the KII topology and architecture and evaluating the techno-economic feasibility of the KII implementation strategy.