• 제목/요약/키워드: Life-cycle costs

검색결과 309건 처리시간 0.026초

불확실성을 고려한 철도 교량의 LCC분석 시스템 개발 (Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges)

  • 조중연;선종완;김이현;조효남
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

공공건물 건축설비 갱신 계획시 비용-효율분석 평가기준에 관한 연구 (Evaluation Standard of Cost-Effectiveness Analysis for Renew of Architectural Equipment in Public Building)

  • 정순성
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.131-138
    • /
    • 2013
  • The purpose of this study is to suggest the evaluation standard of cost-effectiveness analysis for renew of architectural equipment in public building. Evaluation items of cost-effectiveness analysis for renew of architectural equipment in public building were used life cycle cost, energy consumption(ton of oil equivalent), green house gas emissions(ton of carbon dioxide) and maximum power demand. Life cycle cost is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. The social concern with green house gas and maximum power demand of architectural equipment field has been growing for the last several years.

각종지원금제도에 의한 냉열원시스템의 라이프 사이클 코스트 분석 (Life Cycle Cost Analysis of Primary Cooling System by Systematic Support Cost)

  • 김종민;정순성;최창호
    • 한국태양에너지학회 논문집
    • /
    • 제22권4호
    • /
    • pp.97-106
    • /
    • 2002
  • The purpose of this study is to analyze the life cycle cost of primary cooling system by systematic support cost. Life Cycle Cost(LCC) is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. In order to select economical primary cooling system in early heat source plan stages, the research investigates cost items and cost characteristics during project process phases such as planning/design, construction, maintenance /management, and demolition/sell phases. The study also analyze the life cycle cost by capacity leading to suggest the most economical primary cooling system by systematic support cost.

불확실성을 고려한 교량 하부구조 최적설계 (Optimal Design of Bridge Substructure Considering Uncertainty)

  • 박장호;신영석;신욱범;이재우
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

도시철도 차량에서 수명주기비용의 검증 (Verification of Life-Cycle Cost for the Urban Railway Vehicle)

  • 정광우;전영석;안준용;김철수;정종덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.636-642
    • /
    • 2009
  • The application of LCC-techniques is being introduced at the on-going procurement programs of various techniques. LCC-techniques have the common characteristic that all are designed to motivate contractors to design, manufacture and deliver equipment with lower life cycle costs. You may believe that savings may be in the acquisition cost component of life cycle costs. However, primary emphasis is generally on reducing and controlling operating and support costs by transferring more responsibility to the contractor for equipment operating and support cost performance. It has been found that life cycle cost procurement provisions must be individually tailored to each program. In this study, the currently identified LCC procurement techniques including a variety of LCC incentive provisions are introduced. Moreover, verification method, a procedural issue and incentive to application of LCC-techniques are examined.

  • PDF

인공지능기술을 이용한 교량구조물의 생애주기비용분석 모델 (Life Cycle Cost Analysis Models for Bridge Structures using Artificial Intelligence Technologies)

  • 안영기;임정순;이증빈
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권4호
    • /
    • pp.189-199
    • /
    • 2002
  • This study is intended to propose a systematic procedure for the development of the conditional assessment based on the safety of structures and the cost effective performance criteria for designing and upgrading of bridge structures. As a result, a set of cost function models for a life cycle cost analysis of bridge structures is proposed and thus the expected total life cycle costs (ETLCC) including initial (design, testing and construction) costs and direct/indirect damage costs considering repair and replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses costs. Also, the optimum safety indices are presented based on the expected total cost minimization function using only three parameters of the failure cost to the initial cost (${\tau}$), the extent of increased initial cost by improvement of safety (${\nu}$) and the order of an initial cost function (n). Through the enough numerical invetigations, we can positively conclude that the proposed optimum design procedure for bridge structures based on the ETLCC will lead to more rational, economical and safer design.

교량의 생애주기비용 최적설계 (Optimal Life Cycle Cost Design of a Bridge)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.115-122
    • /
    • 2010
  • 최근 들어 교량과 같은 구조물에 대한 생애주기비용(Life Cycle Cost, LCC) 분석의 중요성이 점차 커지고 있다. 그러나 교량의 공용수명 동안 발생할 수 있는 생애주기비용은 설계 및 시공조건 그리고 사용환경에 따라 많은 불확실성을 내포하고 있기 때문에 정확히 예측하기 힘들다. 본 논문에서는 교량의 생애주기비용 최적설계를 위한 설계방법을 제시하였다. 교량의 총생애주기비용은 초기비용, 손상비용 유지관리비용, 보수/보강비용, 사용자비용, 해제/폐기비용의 합으로 산정하였다. 생애주기비용을 목적함수로 하고 도로교설계기준을 제약조건으로 최적화를 수행하였다. 초기비용은 종합불가정보 및 참고자료를 근거로 산출하였으며, 하중 및 부재에 대한 불확실성을 고려하기 위해 손상확률의 개념을 도입하여 손상비용을 산출하였다. 교량의 내하율곡선을 이용하여 교량의 보수/보강 비용을 추정하였으며, 차량운행비용과 시간지연비용으로부터 사용자비용을 산정하였다. 이로부터 교량에 대한 생애주기비용 최적설계를 수행하고 주요인자들에 대한 영향을 살펴보았다.

8200호대 전기기관차 주변환장치 LCC 비교 분석 (Life Cycle Cost Comparative Analysis for Main Conversion System in 8200 Series Electric Locomotive)

  • 김완일;창윤우;김동만;김재문
    • 전기학회논문지
    • /
    • 제67권12호
    • /
    • pp.1717-1722
    • /
    • 2018
  • Parts and units of 8200 series electric locomotive are aging, but and source technology is not secured. As a results, maintenance costs are increasing steadily due to using expensive substitute parts. Therefore, various studies have been conducted to reduce maintenance costs. In this paper, the life cycle cost(LCC) of the developed and conventional products were compared and analyzed about main conversion system in 8200 Series electric locomotive. As a result of analysis, the material cost was the highest in the conventional product among the various item costs. On the other hand, it is confirmed that preventive cost was the highest among the costs about the developed product.

Technology Readiness Level Assignment to Industrial Plant System Life Cycle

  • Salim, Shelly;Jo, Raehyeok;Lee, Taekyeong;Lee, Joongyoon
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.1-11
    • /
    • 2015
  • During the industrial plant system life cycle, required technologies are developed and assessed to analyze their performance, risks and costs. The assessment is called technology readiness assessment (TRA) and the measure of readiness is called technology readiness level (TRL). The TRL consists of 9 levels and through the TRL assessment, the technology to be developed and its components are assigned to their appropriate TRL. TRL assessment should be performed in each life cycle stages to monitor the technology readiness and analyze the potential risks and costs. However, even though the concept of TRL has been largely adopted by numerous organizations and industry, direct and clear assignment of target TRL for each life cycle stage has been overlooked. Direct mapping/assignment of target TRL for each life cycle has benefits as follow: (1) the technical risks condition of each life cycle stage can be better understood, (2) cost incurred if the technology development is failed can be analyzed in each life cycle stage, and (3) more effective decision making because the technology readiness achievement for each life cycle stages is agreed beforehand. In this paper, we propose a steel-making plant system life cycle and TRL assignment to each of the system life cycle stage. By directly assigning target TRL for each life cycle stages, we look forward to a more coordinated (in terms of exit criteria) and highly effective (in terms of technical risks identification and eventually prevent project failure) technology development and assessment processes.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF