• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.023 seconds

Assessment Model for Project Management Information System Based on User Satisfaction and Importance (사용자 만족도 및 중요도를 고려한 건설 정보화 시스템 평가모형 개발)

  • Park, Kyoung-Ah;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.137-148
    • /
    • 2008
  • Using PMIS(Project Management Information System) plays an important role in systematically planning and effectively managing the complex and large-sized construction projects. In spite of the importance of PMIS, on-site engineers, who are the main users of PMIS, have not used PMIS enthusiastically because PMIS has been evaluated and improved by not the viewpoint of the system users but the viewpoint of system managers and head office manager. Therefore, this study developed an assessment model to evaluate PMIS with the viewpoint of the on-site engineers, so previously developed PMIS can be evaluated by the on-site engineers with importance and satisfaction elements. It is anticipated that the effective use of the developed assessment model might increase the utilization of existing PMIS as well as develop the construction industry.

Suggestion of the Attached Piping Material Rate for the Mechanical Fire Protection Facilities in Office Buildings (업무용 건축물의 기계소방시설 배관 부속자재 요율 제시)

  • Park, Lyool;Park, Kyung-Soon;Yoon, Hang-Mook
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.1-8
    • /
    • 2018
  • In generally, the estimation work regarding building mechanical service system in comparison with other architectural estimations is time-consuming, and the process is continuously getting more difficult because of the increased usage of the attached piping materials such as fittings and supports in addition to their complicated construction processes. In order to improve this problem, the Korean authority provides a simple method to estimate the attached material rate regarding the main piping material, which is the most time-consuming work in the architectural mechanical estimation. However, to be an applicable method on construction site, a proper conversion rate of the attached piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the suggestion of the material and labor cost rate of the attached piping materials such as the fittings and supports by work types and fitting methods of indoor fire, sprinkler, and extinguishing gas piping work of mechanical fire protection facilities in office buildings that have been designed after 2010.

Field Evaluation of Scour Countermeasure Using Geobag (지오백 세굴보호공법의 현장 적용성 평가)

  • Park, Jae-Hyun;Kwak, Ki-Seok;Lee, Ju-Hyung;Chung, Moon-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1251-1258
    • /
    • 2006
  • Field evaluation of new scour countermeasure using geobag and aggregate is performed to prepare for the basis of design and construction standard in Korea. Polyester non-woven geotextile is determined as a geobag material and tire cord is used to sew up the geobag which contain aggregate. Hwasang-gyo(bridge) is selected as a pilot test site through office review and field investigation. According to the design flood of Hwasang-gyo(bridge), the size and volume of geobag are calculated and construction area and required number of geobags are computed by considering the specification of the pier and foundation of the bridge. After construction, scour depth around geobag construction area is measured and the stability of geobag is ascertained by using pole and digital camera.

  • PDF

A Study on the Architectural Characteristics of Jogeongdan Examined through Construction-Related Records (영건(營建) 관련 자료를 통해 본 조경단(肇慶壇)의 건축특성)

  • Ahn, Seon-Ho
    • Journal of architectural history
    • /
    • v.32 no.5
    • /
    • pp.59-68
    • /
    • 2023
  • Jogyeongdan is an altar built by the Korean Empire within the burial grounds of Sijomyo(始祖墓), the Jeonju Lee clan, as a part of their posthumous respecting project. This site adheres to strict rules and formalities that are comparable to those of the royal tombs of the Joseon Dynasty, with its altars and monument House demonstrating construction techniques that hold high value in architectural history. This study compares and analyzes construction-related records such as Uigwe, Statements, and Figure, along with their historical context. Through this effort, the study explores in detail the original form of Jogyeongdan at the time of its construction and subsequent transformations in later periods. Findings showed that the Figure was drawed by Chae Yongsin and was only a blueprint prior to the construction; it was modified during the actual construction process. A part of Jogyeongdan project was carried out by demolishing four government office buildings that were closed because of the Gabo Reform in order to secure wood and roof tiles, among other materials. Additionally, concluded the Jaesil was by relocated Deokryudang from Samryeyeokcham. Further, instances of distinctive terminology usage were found related to construction materials in the Jogyeongdan Uigwe, which were not used in another Uigwe. These terms were distinguished in detail according to the locations in which the materials were used.

TEMPERATURE CONTROL AND COMPRESSIVE STRENGTH ASSESSMENT OF IN-PLACE CONCRETE STRUCTURES USING THE WIRELESS TEMPERATURE MEASURING SYSTEM BASED ON THE UBIQUITOUS SENSOR NETWORK

  • Ho Kyoo JO;Hyung Rae KIM;Tae Koo KIM
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.794-799
    • /
    • 2009
  • The temperature control of in-place concrete is the most important factor for an early age of curing concrete. Heat stress of mass concrete caused by the heat of hydration can induce the crack of concrete, and a frost damage from cold weather casting concrete results defect on compressive strength and degradation of durability. Therefore, success and failure of concrete work is dependant on the measurement and control of concrete temperature. In addition, the compressive strength assessment of in-place concrete obtained from the maturity calculated from the history of temperature make a reduction of construction cycle time, possible. For that purpose, wireless temperature measuring system was developed to control temperature and assess strength of concrete. And, it was possible to monitor the temperature of concrete over 1km apart from site office and to take a proper measure; mesh-type network was developed for wireless sensor. Furthermore, curing control system that contains the program capable to calculate the maturity of concrete from the history of temperature and to assess the compressive strength of concrete was established. In this study, organization and practical method of developed curing control system are presented; base on in-place application case.

  • PDF

Consideration of Surveying the Site for Lighthouse in Harbor Plan (항만계획에 있어서 등대부지측량의 고찰)

  • 장용구;이중우;강인준;이호
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.225-233
    • /
    • 1999
  • Harbor design and construction plan in Korea becomes the most hot issue both in the Maritime Affairs and Fisheries Office and in the related port industries. Production of the plane and cross section maps together with the profile map for harbor project is done firstly and is important in all procedure because it is the most basic datum in counting the constructional expense for determination of the area and capacity. As the expense assigned on surveying part among the total expenses of harbor planning and construction in Korea is very small, it is difficult to make exact maps. Moveover, because the method used to make such maps is mostly traditional surveying such as plane table surveying , offset surveying, stadia surveying and level surveying, etc, it is difficult to get precise three dimensional maps. Therefore, for making more precise map in the harbor project, we have to use the newest surveying equipment. This study discusses the method of old surveying and recent surveying used for the three dimensional map of the site for lighthouse which gives navigational aids for the in-and out-bound ships. The authors are proposing a method for more precise three dimensional positioning in this study.

Field Application of the Mass Concrete Utilizing Combined Method for Temperature Crack Reduction (온도균열 저감공법을 복합사용한 매스콘크리트의 현장적용)

  • Han, Sang-Yoon;Lee, Chung-Sub;Baek, Dae-Hyun;Jang, Duk-Bae;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.37-39
    • /
    • 2010
  • In this study, with new office construction site of S Construction company as subject, to solve all the problems according to reduced hydration heat and temperature crack of mass concrete used mat foundation and placing time difference, low heat combination of coarse particle cement and fly-ash and setting time difference applied AE water reducing agent, and to prevent the early frost damage caused by low outdoor temperature, a heat insulation method using double bubble sheet was conducted. As a result, it was found that hydration heat and setting time difference was reduced by applying a low heat combination and setting time difference construction method, and that the high insulation capability of the double bubble sheet was able to not only prevent the early frost damage but also reduce temperature difference between the central part and the upper part of mass concrete.

  • PDF

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications (Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용)

  • Roh, Gi-Tae;Dang, Ngoc Son;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

Analysis of Changes in Groundwater Level according to Tunnel Passage in Geological Vulnerable Zone (지질취약구간 터널통과에 따른 지하수위 변화량 분석)

  • Choi, Jung-Youl;Yang, Gyu-Nam;Kim, Tae-Jun;Chung, Jee Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.369-375
    • /
    • 2020
  • The section of this study is the geological vulnerable zone where groundwater leakage occurred through the tunnel barrier during excavation of the shield tunnel boring machine(TBM) for the construction of the electric power unit. Therefore, a Three D imensions(3D) numerical analysis was performed to analyze the actual situation from before construction to the time when the change in groundwater level occurred, and to reflect the surrounding ground conditions based on the observed change in groundwater level during construction. As a result of the study, the correlation between groundwater level change and tunnel construction around the site was identified. Therefore, it was similar to the measurement result of groundwater level at the target ground. The amount of groundwater discharge to the entrance of the tunnel construction was also similar to the actual measured result, and the numerical analysis method and modeling in this study were analyzed to reflect the site conditions.

Achievements of Environmental Restoration During Multipurpose Dam Construction - In case of Wheng Seong multipurpose dam - (댐 건설과 환경복원에 대한 우리의 노력 - 강원도 횡성군 횡성다목적댐 환경복원 사례를 중심으로 -)

  • Won, Hi-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.3 no.3
    • /
    • pp.100-104
    • /
    • 2000
  • We have put considerable time and work to find a proper solution to restore the damaged natural environment due to Dam construction, and to restore the field around Dam on the basis of Environmentally Sound Sustainable Development(E.S.S.D). We've replaced the site which had been used as a equipment space with the natural-oriented park, have made a wildlife corridor for those animals which have been living in the area in a newly constructed road to in an out, and have introduced a streamside plant to organize green-space. We've received incredible favor from visitors and residents for the environment restoration. The natural-oriented park plays a role of giving the citizens to the pleasure and the comfort.

  • PDF