Achievements of Environmental Restoration During Multipurpose Dam Construction - In case of Wheng Seong multipurpose dam -

댐 건설과 환경복원에 대한 우리의 노력 - 강원도 횡성군 횡성다목적댐 환경복원 사례를 중심으로 -

  • Won, Hi-Young (Wheng Seong Dam office, Korea Water Resources Corporation(kowaco))
  • 원희영 (한국수자원공사 횡성댐건설단)
  • Received : 2000.07.18
  • Published : 2000.09.30

Abstract

We have put considerable time and work to find a proper solution to restore the damaged natural environment due to Dam construction, and to restore the field around Dam on the basis of Environmentally Sound Sustainable Development(E.S.S.D). We've replaced the site which had been used as a equipment space with the natural-oriented park, have made a wildlife corridor for those animals which have been living in the area in a newly constructed road to in an out, and have introduced a streamside plant to organize green-space. We've received incredible favor from visitors and residents for the environment restoration. The natural-oriented park plays a role of giving the citizens to the pleasure and the comfort.

Keywords