• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

Geotechnical Site Investigation for Designing of Tidal Power Plant Structures (조력발전 구조물 설계를 위한 지반조사;인천만 지반조사 사례)

  • Oh, Myoung-Hak;Lee, Kwang-Soo;Park, Jin-Soon;Yum, Ki-Dai;Cha, Dai-Wook;Yang, Geun-Hun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.613-616
    • /
    • 2007
  • The main structures that comprise a tidal power plant are turbine structure, sluice structure, tide embankment and gate. Since these structures are founded on seabed ground, an extensive geotechnical site investigation to evaluate the engineering properties of field soils must be conducted prior to design and construction. According to the results of geotechnical site investigation conducted at the planned site for construction of Incheon bay tidal power plant, soft ground generally lie 7 meters below the seabed surface level. This research suggests the reliable and economical design of foundations and ground improvements required for construction of main structures in Incheon bay tidal power plant, with considerations on field conditions.

  • PDF

Adsorption Characteristics of BTEX on Dust Collecting Electrode Coated with Activated Carbon (활성탄으로 코팅된 집진전극의 BTEX 흡착특성)

  • Nam, Sangchul;Kim, Hyun Jung;Kim, Kwang Soo
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.29 no.6
    • /
    • pp.773-779
    • /
    • 2013
  • This study was performed to provide the basic data for the function of BTEX removal for compact electrostatic precipitator which are applicable to indoor environment (or closed spaces). For this purpose, the adsorption equilibrium test was conducted for BTEX of activated carbon sheet (ACS) and activated carbon (AC), and the adsorption characteristics of AC and ACS were evaluated using the Langmuir constant which was obtained from the adsorption characteristics, adsorption capacity and regression calculation. The surface area and adsorption pore volume of ACS reduced by 70% and 86%, respectively, as compared to those of AC, and the adsorption capacities of BTEX also showed a similar level. Thus, it is considered that ACS applied electrostatic precipitator is able to remove dust and BTEX simultaneously.

The Improving Direction of Korean Eco-Industrial Park Construction Project (한국 생태산업단지 구축사업의 개선방향)

  • Kong, Hyung-Ok;Ko, Jae-Cheol
    • Journal of the Korean Applied Science and Technology
    • /
    • v.28 no.4
    • /
    • pp.418-430
    • /
    • 2011
  • This study was conducted to provide an improving direction of K-EIP(Korean Eco-Industrial Park) construction project by company's voluntary participation. For this purpose, we investigated and analyzed the status of domestic eco-industrial park projects from various literatures, foreign EIP cases and FGI(Focus Group Interview). The key issues to construct a voluntary K-EIP are the lack of experts, the difficulties of commercialization financing, and so on. In this study, therefore, the programs to resolve these problems in K-EIP construction project were suggested at the level of government and corporation.

Case Study of Environmental Impact Assessment about Groundwater Outflow during Railroad Tunnel Construction (철도건설사업시 터널지하수 유출에 관한 환경영향평가 사례 연구)

  • Lee Jeongho;Yoo Heonseok;Lee Young Soo;Park Chang Sug
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.303-308
    • /
    • 2004
  • It is recently reported that the importance of environmental impact assessment(EIA) about groundwater outflow problems is beingy raised in the case of tunnel excavation during railroad construction. The EIA about groundwater outflow into railroad tunnel is generally performed using the results of numerical analysis embodied through groundwater flow modeling program like MODFLOW. The basic data for this modeling include (1) the geological and hydrogeological investigation data along the planned block of tunnel excavation, (2) total amount of outflowed groundwater during tunnel excavation, and (3) the status of groundwater level fluctuation in the water-supply wells distributed in the planned block of tunnel excavation. In this study, the authors analyzed the cases of the computational modeling about groundwater outflow in three planned blocks of railroad tunnel, and suggest the environmental impact factors and mitigation plan during EIA of tunnel excavation in railroad construction.

  • PDF

A Study on the Forward Kinematic Analysis of a Casing Oscillator (케이싱오실레이터의 순기구학 해석)

  • 백재호;신진오;이은준;박명관
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.237-240
    • /
    • 1997
  • The casing oscillator is a construction equipment to clamp, oscillate and push a casing for foundation work. In case that the casing oscillator is operated on the slant ground, if another construction heavy equipment is not used, it is impossible to insert the casing in ground using only casing oscillator. So in this paper, we present the new casing oscillator that need not to level the ground for work of casing insertion. This mechanism can execute 4 DOF motion by actuating 5 single - rod hydraulic cylinders. The forward kinematics analysis of the casrng oscillator by tetrahedron geometry is performed so predict workspace, direction and poison of casing oscillatoer.

  • PDF

The Application of Hydration Heat to Form Removal of Lining Concrete in Tunnel (수화열을 고려한 터널 라이닝 콘크리트 거푸집 탈형)

  • Lee, Jong-Kil;Jung, Hyung-Mok;Kim, Kook-Han;Namgoong, Yeong-Hwan;Park, Chan-Kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.347-350
    • /
    • 2005
  • The strength level for removal of lining concrete in tunnel is increased from 2.94MPa to 4.9MPa in 2004. This result in the increase of concrete curing time, and construction time would be delayed. In this study, in order to improve the efficiency of construction cycle and satisfy the strength criterion, a curing method is adopted, which is considering the hydration heat in the lining concrete member. As a result, it is shown that the concrete curing time for form removal is about 20hrs without the adjustment of concrete mix design. And construction cycle time is not changed compared to that before the change of strength criterion.

  • PDF

The Compressive Strength Prediction of Crushed Sand Concrete by Non-Destructive Test Method (부순모래 콘크리트의 비파괴 시험에 의한 압축강도 추정)

  • Kim, Myung-Sik;Jang, Hei-Suk;Beak, Dong-Il;Sin, Nam-Gyun;Kim, Kang-Min
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05b
    • /
    • pp.145-148
    • /
    • 2006
  • Schmidt hammer and ultra-sonic method are commonly used for crushed sand concrete compressive strength test in a construction field. At present, various of equations for prediction of strength are present, which have been used in a construction field. The purpose of this study is to evaluate the correlation between prediction strength by presentation equations and destructive strength to test specimen, and find out which is a suitable equation for the construction site, In this study, a strength test was carried out destructive test by means of core sampling and traditional test. Non-destructive test was conducted Schmidt hammer and ultra-sonic method, the experimental parameter were concrete age, curing condition, test method and strength level. It is demonstrated that the correlation behavior of crushed sand concrete strength in this study good due to the perform analysis of correlation between core, destructive strength and non-destructive strength.

  • PDF

Integrated Architectural Engineering Design Process Using BIM Tools (BIM 도구 활용을 통한 건축공학설계의 프로세스)

  • Kang, Da-Young;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

Information Management for Eco-performance Management of Buildings (건축물 친환경 성능 관리를 위한 정보 관리)

  • Jeon, Me-Yeon;Lim, Chul-Woo;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.237-241
    • /
    • 2010
  • The Eco-performance assessment program was developed as part of Eco-performance management for buildings at the national level in developed countries. Cases of domestic Green Building Certification(GBC) system was developed but these program's destination of Eco-performance management for buildings needs systematic management by the limited GBC. Generally in the construction industry, Eco-performance management of Building Life-cycle is required. Therefore this paper develop the creation of Eco-performance information and management process, those are from design and maintenance management phases, through suggest the development of a information management for Eco-performance management of buildings. In addition, it makes to decrease the reproduction of information unnecessarily by analyzation of the related association between the information of facilities objects and Eco-performance management. Finally, study the previous reaserch and suggest the BIM by the method of information management and this paper purpose the development of web-based Eco BIM object library management system.

  • PDF

Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library (BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링)

  • Jo, Jae-Hun;Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.3 no.4
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.