• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.035 seconds

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.

Investigation into the Effectiveness on Customized Remodeling - Focusing on apartment houses completed during remodeling - (맞춤형 리모델링에 대한 실효성 검증 연구 - 리모델링을 추진중, 완공한 공동주택을 중심으로 -)

  • Yoon, Hyang-Seung;Kim, Gi-Soo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.7
    • /
    • pp.3-12
    • /
    • 2018
  • The present remodeling makes almost no difference from rebuilding as all the building materials are removed remaining frame structure only. And, in case of vertical extension of building, higher construction cost and safety problem occur. The Ministry of Land, Transport and Maritime Affairs, therefore, recommends customized remodeling that can be made in light of the resident' needs such as parking lot, elevator, bathroom, and room for the alternative of remodeling of vertical extension of building. The purpose of this study is to present real data that can be referred to the constructor's decision making before starting the remodeling, by investigating and analyzing the weight and importance between evaluation factors for customized remodeling at the completed time of remodeling. Accordingly, the factors were divided into environmental factor, social factor, and economical factor, and the survey was performed for the residents living in remodeling houses. In addition, for the professionals, AHP (Analytic Hierarchy Process) has been carried out for the priority in the customized remodeling. For environmental factor, the level of importance made difference from that before remodeling, except parking level. For social factor, every item, including psychological satisfaction and community satisfaction, made difference. For economical factor, the recognition level of importance in rent made difference, except sale price of the factor for price satisfaction. In case of the factor for cost satisfaction, it was checked that construction cost and administration cost both could be considered important. As a result of AHP, the most importantly emphasized item was construction cost, and sale price, administration cost, residence structure, and parking lot were followed by priority in order. This study could contribute to reliably settle down customized remodeling by giving reasonable and substantial help from the analysis of the differences in the customized remodeling items before/after the remodeling.

Development of the Business Survey Index Evaluation Model for Overseas Construction Companies (해외건설 진출기업을 위한 기업경기실사지수 평가모델 개발)

  • Park, Hwan-Pyo;Ko, Hyun-A
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.305-316
    • /
    • 2022
  • Domestic construction companies have difficulty in establishing strategies when entering overseas markets because they do not have an overseas construction economic sentiment index to refer to for data on overseas construction prospects. Considering that the fluctuation of overseas construction orders over the past decade has been substantial and large companies and SMEs are actively advancing overseas, this study developed an evaluation model for an overseas construction business sentiment index to grasp the economic experience of overseas construction companies. In 2021 Korean companies earned 30.6 billion in overseas construction contracts, 87% the level of the previous year, despite difficulties such as COVID-19 and low oil prices, thanks to efforts by construction companies to strengthen their strategies for entry, such as regional diversification, and government support for winning orders. Since the overseas construction industry fluctuates greatly due to changes in the international environment, it is necessary to investigate and analyze the economic sentiment index of overseas construction companies. In particular, despite the increase in overseas expansion of small and medium-sized construction companies and engineering companies, the provision of information on the overseas construction market sentiment index is insufficient, limiting the establishment of strategies for overseas construction expansion. Therefore, this study intends to develop an overseas construction market sentiment index model that can understand the economic sentiment of overseas construction companies, provide a forecast for overseas construction, and use it to establish overseas construction strategies and policies.

Analysis and Suggestion of Environment-friendly Interior Finishing Materials for Aged Apartment Remodeling (노후 공동주택 리모델링의 친환경 실내 마감재료 분석 및 제안)

  • Kim, Ki-Hyun;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.118-126
    • /
    • 2007
  • Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Apartment residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling construction has a unique characteristic in that the residents are already determined prior to construction execution. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.

A Study on General Contractors' Control Measures for Construction Cost Overrun (종합건설사 현장의 원가초과 억제 방안 분석에 관한 연구)

  • Park, Jee Young;Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

Total Information System for Urban Regeneration : City and District Level Decline Diagnostic System (도시재생 종합정보시스템 구축 - 시군구단위 쇠퇴진단시스템 구현을 중심으로 -)

  • Yang, Dong-Suk;Yu, Yeong-Hwa
    • Land and Housing Review
    • /
    • v.2 no.3
    • /
    • pp.249-258
    • /
    • 2011
  • In order to achieve an efficient urban regeneration of the nation, it is required to determine the extent of decline nation-wide and the declined areas for each district and also to evaluate the potentials of the concerned areas. For this task to be accomplished, a construction of a comprehensive diagnostic system based on spatial information considering diversity and complexity is required. In this study, a total information system architecture for urban regeneration is designed as part of the construction of such a diagnostic system. In order to develop the system, a city and district level unit decline diagnostic indicators has been constructed and a decline diagnostic system has been developed. Also, a scheme to promote the advancement of the system is proposed. The DB construction is based on the city and district level nation-wide and metadata for the concerned level is constructed as well. The system is based on the Open API and designed to be flexible for extension. Also, an RIA-based intuitive UI has been implemented. Main features of the system consist of the management of the indicators, diagnostic analysis (city and district level decline diagnosis), related information, etc. As for methods for the advancement, an information model in consideration of the spation relations of the urban regeneration DB has been designed and application methods of semantic webs. Also, for improvement methods for district unit analytical model, district level analysis models, GIS based spatial analysis platforms and linked utiliation of KOPSS analysis modules are suggested. A use of a total information system for urban regeneration is anticipated to facilitate concerned policy making through the identification of the status of city declines to identify and the understanding of the demands for regeneration.

A Study on the Effectiveness of Learning Organization Managed by Medical Center (의료기관 학습조직 운영효과에 관한 연구)

  • Nam, Jong-Hae;Cho, Woo-Hyun;Lee, Sun-Hee;Kweon, Soon-Chang;Moon, Ki-Tae;Kang, Myung-Geun
    • Korea Journal of Hospital Management
    • /
    • v.9 no.2
    • /
    • pp.1-22
    • /
    • 2004
  • This study was designed to suggest a learning organization in a medical center by examining the factors to influence effectiveness of the learning organization. We collected the data of 586 persons who participated once or more times in the learning organization managed from 2000 to 2002 by Y Medical Center located in Seoul, and included the data of 285 persons in the final analysis. The results of the study are summarized as follows. First, as the results of examining the regression coefficients to predict the effectiveness of and satisfaction with the learning organization through the learning level, learning method and learning organization constructing level as the general variables, the important influential factors were shown as follows: 1)knowledge creation, knowledge storing, private learning, organizational learning, and learning organization construction of occupational and human levels as the factors to predict the working competency; 2) learning organization construction of the human level as the factors to assume the duty satisfaction; 3) gender, working years, private learning, team learning and organizational construction level for the prediction of the organizational commitment; and 4) medical technical service, knowledge creation, organization learning, and constructing level of the environmental and human levels for the assumption of the satisfaction with experience in the learning organization. Based on the study results of the effects in managing the learning organization, we can conclude the followings. First, the members who are in various working positions and occupations need to continuously participate in the learning organization. Second, to raise the organizational outcome from the management of the learning organization, it is necessary to establish systematic concepts in the constituents of the organizational effectiveness such as working competency improvement, duty satisfaction and organizational commitment, and the experience satisfaction of the learning organization. Finally, the future of the organization depends on the learning competencies of the organization members. To continuously exist and develop the organization, the private learning of the organizational members should be constantly spread and shared over the organizational level, and the usual innovations such as repetitive and habitual organizational learning should be generally tried out throughout the whole field of the management.

  • PDF

Analysis on Effect of Construction Facilities depending on a Scenario of Sea Level Rise around Jeju Coastal Area (해수면 상승 시나리오에 따른 제주연안지역 건설시설물의 영향 분석)

  • Lee, Dong Wook;Bu, Yang Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.267-274
    • /
    • 2011
  • In this study, around Jeju area where climatic change is most considerably appearing in Han Peninsula, we prepared sea level rise height caused by sea level rise (Seogwipo 5.6 mm/yr, Jeju 5.3 mm/yr) and a sea level rise scenario for the case when an enlarged typhoon attacks during high water ordinary spring tide, and evaluated flooding area and effect on road and facility using Digital Elevation Model(DEM) and GIS Spatial Analysis Technique. As a result, the flooding areas were shown to be 2.9 $km^2$ in 2040, 5.4 $km^2$ in 2070, and maximum 5.4 $km^2$ in 2100. Analyzing the effect of flooding on each type of road, the local roads(Gun-do) were shown to be mostly affected. The most flood effected facilities were individual houses. Especially, as there is a possibility for casualties to occur due to disaster in Hwabuk-dong because the effect of flooding on individual houses in this area was shown to be high. In addition, flood on port facilities will considerably affect logistic and marine activities. This study is thought to be a basic data which can be utilized for establishment of strategic coping measures and policies of government affiliated organizations through analysis of effect of sea level rise on construction field.

Characteristics of short term changes of groundwater level and stream flow rate during 2017 Pohang earthquakes (2017 포항 지진시 단기간 지하수위 변동 및 하천 유량 변화 특성)

  • Choi, Myoung-Rak;Lee, Ho-Jeong;Kim, Gyoo-Bum
    • Journal of the Geological Society of Korea
    • /
    • v.54 no.5
    • /
    • pp.557-566
    • /
    • 2018
  • Pohang earthquake (Main shock magnitude = 5.4) occurred in Southeastern region of South Korea in November 15, 2017. Groundwater levels of 6 monitoring wells with 5 minutes interval measurements located in that region and stream water levels of 4 stations located along the Hyeongsan-gang stream are used for the analysis of earthquake induced effects. Four groundwater monitoring wells show a short-term decrease of groundwater level after a main shock and one well does an increase and the maximum change is about 42.0 cm. Especially, groundwater levels at two monitoring wells near the epicenter are consistently maintained after a decrease. There is little relationship between earthquake magnitude or a distance to epicenter and changing amount of groundwater level and it may be due to the inhomogeneity of geologic material and unconsolidated sediments distribution. The changes in permeability of fractured zone and groundwater levels occasionally cause changes in stream flow rate, and water level of the Hyeongsan-gang stream in the study area decreases just after the earthquake and increases again up to the normal level and next shows an more gentle decreasing slope. Total increasing flow rates at S1 (upstream site) and S4 (downstream site) stations are about $12,096m^3$ and $116,640m^3$, respectively, during the increasing period.