• Title/Summary/Keyword: Construction Site Information

Search Result 829, Processing Time 0.031 seconds

A Study on the development of Construction site management system to build Web-based BIM (웹기반 BIM 구축을 위한 건축현장 관리시스템 개발에 관한 연구)

  • Sung, Kyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.1081-1083
    • /
    • 2009
  • Several construction management systems, such as CIC, CALS, PMIS etc., are only focused on visualizing or collecting data without linking between them. So, it is required to develop a new concept construction management system able to control data throughout the construction process. The purpose of this study is to develop prototype of web-based BPMS, which implements whole information flow for each construction phase effectively by storing common data in general building constructions.

  • PDF

Methodology Developments based on CO2 Emission Information from Construction Equipment for Greenhouse Gas Regulations (온실가스 규제에 대비한 건설장비 이산화탄소 배출량정보 활용방법론 개발)

  • Go, Jee-Eun;Lee, Jin-Woo;Chae, Yoon-Byung;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.35-36
    • /
    • 2018
  • According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.

  • PDF

The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project - (초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 -)

  • Park, Hee-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

Automated Construction Progress Management Using Computer Vision-based CNN Model and BIM (이미지 기반 기계 학습과 BIM을 활용한 자동화된 시공 진도 관리 - 합성곱 신경망 모델(CNN)과 실내측위기술, 4D BIM을 기반으로 -)

  • Rho, Juhee;Park, Moonseo;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.11-19
    • /
    • 2020
  • A daily progress monitoring and further schedule management of a construction project have a significant impact on the construction manager's decision making in schedule change and controlling field operation. However, a current site monitoring method highly relies on the manually recorded daily-log book by the person in charge of the work. For this reason, it is difficult to take a detached view and sometimes human error such as omission of contents may occur. In order to resolve these problems, previous researches have developed automated site monitoring method with the object recognition-based visualization or BIM data creation. Despite of the research results along with the related technology development, there are limitations in application targeting the practical construction projects due to the constraints in the experimental methods that assume the fixed equipment at a specific location. To overcome these limitations, some smart devices carried by the field workers can be employed as a medium for data creation. Specifically, the extracted information from the site picture by object recognition technology of CNN model, and positional information by GIPS are applied to update 4D BIM data. A standard CNN model is developed and BIM data modification experiments are conducted with the collected data to validate the research suggestion. Based on the experimental results, it is confirmed that the methods and performance are applicable to the construction site management and further it is expected to contribute speedy and precise data creation with the application of automated progress monitoring methods.

Characteristics Analysis of Seasonal Construction Site Fall Accident using Text Mining (텍스트 마이닝을 활용한 계절별 건설현장 추락사고 특징 분석)

  • Kim, Joon-Soo;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.113-121
    • /
    • 2019
  • The death rate of industrial accidents per 10,000 people in Korea is two to three times higher than that of major countries. Falling accidents at the construction site happened to have caused the most deaths. Analysis of existing research and measures by national institutions showed that the industrial accident management concentrated on falling accidents was insufficient and the seasonal safety management measures were not enough. There is thus the need for research that provides detailed and enough information on falling accidents. This study, therefore, aims to overcome the limitations of existing research and safety management accident response using a methodology that provides the necessary information for the prevention of fall accidents by deriving seasonal crash characteristics of the construction site. In order to provide enough information, 387 cases of seasonal construction site falling were collected, which describes the causal relationship of accidents. Text mining using principal component analysis and cluster analysis was carried out. The analysis showed that: In the spring, snowfall and unreasonable operation of equipment including lifts were the major cause. In summer, most accidents were caused by form, insufficient safety inspection, and installation work. In autumn, weather factors such as wind and typhoon were the cause. In winter, material transportation, exterior wall work, and ignore safety precautions were the cause of the crash.

Preliminary Study on GIS Mapping-based Fine Dust Measurement in Complex Construction Site (단지조성공사 내 드론을 활용한 GIS 맵핑 기반 미세먼지 측정 시스템 기초 연구)

  • Lee, Jaeho;Han, Jae Goo;Kim, Young Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.319-325
    • /
    • 2021
  • A fine dust measurement using drones is becoming an increasingly common technology, and air pollutants can be identified through dust monitoring in partial industrial areas. A station for measuring fine dust provides information at large construction site offices. On the other hand, it was difficult to check the fine dust in the pollutant source accurately. Therefore, the drone took measurements directly after been placed at the site. While measuring fine dust, monitoring noise occurred due to the influence of the drone's down-wind during landing, but the measurements were similar to the numerical value of the grounded pollution source on the height of 30 m. The field applicability to the study area has limitations in periodic updates using satellite images because the terrain was constantly changing due to considerable flattening fieldwork. Therefore, this study implemented a system that can reflect real-time field information through GIS mapping using drones.

A Study on the Construction of the Framework Spatial DB for Developing Watershed Management System Based on River Network (하천 네트워크 기반의 유역관리시스템 개발을 위한 프레임워크 공간 DB 구축에 관한 연구)

  • Kim, Kyung-Tak;Choi, Yun-Seok;Kim, Joo-Hun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.2
    • /
    • pp.87-96
    • /
    • 2004
  • When watershed spatial database is constructed from DEM, hydrological geographic characteristics of watershed can be easily extracted. And the characteristics can be assigned and managed as the attribute of spatial database. In this study the scheme of constructing framework spatial database which is basic information for managing watershed information is examined. We established framework spatial data and defined the relationship of the data. And framework spatial database of test site was constructed. In this study, HyGIS(Hydrological Geographic Information System) which is developed by domestic technology for making hydrological spatial data and developing water resources system is used. Hydrological geographic characteristics and spatial data is extracted by HyGIS. And the data from HyGIS is used for constructing framework spatial database of test site. Finally, this study suggests the strategy of constructing framework spatial database for developing watershed management system based on river network.

  • PDF

Research on the Direction of Building an Integrated Smart Platform at Construction Sites (건설현장 통합 스마트플랫폼 구축방향에 대한 연구)

  • Yeon Cheol Shin;Yu Mi Moon
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.3
    • /
    • pp.620-634
    • /
    • 2024
  • Purpose: This study aims to strengthen the linkage between the construction site and the headquarters, suggest the direction of building an integrated smart platform that can actually be operated and utilized in the field, and effectively implement safety management. Method: Agile methodologies were applied to build a flexible and scalable system through cloud-based and three-tier architectures. Functional requirements were set through an on-site survey, and design and construction were carried out by reflecting personal information protection and legal requirements. Result: The integrated smart platform proposed in this study strengthens the connection between the site and the headquarters to maximize the effect of safety accident prevention and safety management. This system has improved the safety awareness of workers and managers, and has realized more efficient safety management through a unified communication system. Conclusion: In the establishment of an integrated smart platform, it is essential to reflect the characteristics of the site when selecting the development method and establishing the function plan. In the basic design and detailed design stages, it is necessary to establish security measures, design mobile functions, and review device expansion, and consider enterprise-wide safety management, user convenience, and scalability. It is also important to maintain and improve the system, reflect legal requirements, and support the elderly and foreign workers. By strengthening personal information and CCTV security and continuously improving it by reflecting user opinions, it can be expected to activate an integrated smart platform.

Spatial interpolation of geotechnical data: A case study for Multan City, Pakistan

  • Aziz, Mubashir;Khan, Tanveer A.;Ahmed, Tauqir
    • Geomechanics and Engineering
    • /
    • v.13 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Geotechnical data contributes substantially to the cost of engineering projects due to increasing cost of site investigations. Existing information in the form of soil maps can save considerable time and expenses while deciding the scope and extent of site exploration for a proposed project site. This paper presents spatial interpolation of data obtained from soil investigation reports of different construction sites and development of soil maps for geotechnical characterization of Multan area using ArcGIS. The subsurface conditions of the study area have been examined in terms of soil type and standard penetration resistance. The Inverse Distance Weighting method in the Spatial Analyst extension of ArcMap10 has been employed to develop zonation maps at different depths of the study area. Each depth level has been interpolated as a surface to create zonation maps for soil type and standard penetration resistance. Correlations have been presented based on linear regression of standard penetration resistance values with depth for quick estimation of strength and stiffness of soil during preliminary planning and design stage of a proposed project in the study area. Such information helps engineers to use data derived from nearby sites or sites of similar subsoils subjected to similar geological process to build a preliminary ground model for a new site. Moreover, reliable information on geometry and engineering properties of underground layers would make projects safer and economical.