• Title/Summary/Keyword: 초고층 공사

Search Result 124, Processing Time 0.025 seconds

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

종합건설업체 탐방-힘찬 도약을 위해 새롭게 도전하는 롯데건설(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.3 s.212
    • /
    • pp.50-55
    • /
    • 2008
  • 롯데건설(주)은 1959년 창립해 도로, 교량, 항만 등의 대규모 토목공사와 첨단 인텔리전트 빌딩, 호텔, 쇼핑센 터 및 고급 아파트 등의 건축공사를 통해 국가산업 발전과 주거문화 향상에 기여하고 있다. 롯데건설(주)은 잠실 롯데월드를 비롯해 전국에 롯데호텔 · 백화점을 건설하며 테마파크, 관광, 유통시설 건설에 남다른 기술과 노하우를 축적하고 현재 서울, 부산에 100층 이상의 초고층 건물인 제2롯데월드 건설 추진등 수익 다각화를 위해 끝없이 노력하고 있다. 또한 중세 유럽성의 긍정적인 이미지를 아파트 브랜드에 적용, 주택시장의 고급화, 차별화를 선도해왔다. 이런 노력의 결과 롯데건설(주)은 2007년 매출 3조1,608억원, 수주 6억원을 달성했고 올해 매출 3조8,000억원, 수주 8조원을 목표로 정진하고 있다.

  • PDF

Performance Elements for Schedule Compression in Slab Form Work for High-rise Buildings (초고층 바닥거푸집 공사 공기단축을 위한 현장 요구 성능도출)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.167-170
    • /
    • 2010
  • In tall building construction, It is important to reduce construction duration of slab form work. Therefore, the purpose of this study is to assess the required performance for reduction of construction duration in slab form work of tall buildings. We surveyed the required performance and their degrees of importance and economical efficiency through the interview and questionnaire survey by related experts. This study proposes the guideline to develop improved formwork system for reduction of construction duration.

  • PDF

A Variable Table Form for Concrete Structural Frame Work of Irregular-Shaped Tall Buildings (비정형 초고층 건물의 골조공사를 위한 가변형 테이블폼)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.35-36
    • /
    • 2011
  • Recently, an irregular-shaped super tall building has been increased, aiming toward landmarks of cityscape. However, the complex floor plan derived from an irregular shape requires considerable resources including time, cost, and effort to meet complex structural framework. Based on the motivation, the study proposes a table-form system that is variable slab form appropriate to an irregular shaped floor through improving limitations of an existing table-form system. The variable table-form is expected to reduce construction resources and improve constructability on an irregular floor plan of super tall buildings as well.

  • PDF

Framework on Database Development based on Modular Simulation Model Implementation for Curtain Wall Operations in High-rise Buildings (초고층 커튼월공사 MSM 구성 및 데이터베이스 구축을 위한 프레임워크)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Tae-Hyung;Shin, Young-Keun;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.301-302
    • /
    • 2012
  • Recently, high-rise building projects have been in the spotlight in South Korea. Curtain wall construction, as one of important operations in the high-rise building projects is composed of various, entangled and complex unit processes that require a systematic planning to prevent unexpected delays. A schedule simulation technique has been used for deriving more efficient planning and accurate performance measurement. However, the simulation technique has difficulty in collecting actual data and in applying data fluctuations during construction. Thus, this paper suggests a concept model of Modular Simulation Model(MSM) that overcomes such limitations of traditional simulation technique based on curtain wall operations.

  • PDF

Working Posture Analysis Using OWAS method of Core Wall Construction in High-rise Building (OWAS기법을 활용한 초고층 코어월 공사의 근로자 작업자세 분석)

  • Lee, Junehyuck;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.72-73
    • /
    • 2016
  • Working Posture is an important factor directly connected with quality and productivity of the construction project. In particular, High-rise building construction is required to manage the working posture due to the repetitive task and unfavorable working condition such as high place work, limited space. However existing construction planning of high-rise building construction has a negative effect on the labor's productivity because it is not insufficiently considered for working posture. Therefore the purpose of this study is to suggest a work that needs improvement by analyzing labor's working posture quantitatively using OWAS method. These results would provide the basic information to improve the productivity of the construction project by supporting the construction plan considering the working posture in high-rise building.

  • PDF

Development of An Optimal Call-response Algorithm of Construction Lift for High-rise Building Construction (초고층 건설용 리프트의 최적 호출 응답 알고리즘 개발)

  • Ahn, Heejae;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.6-7
    • /
    • 2018
  • Although the importance of the construction lift is increasing, no improvements are being made to its operating system. This study proposed an optimal call-response algorithm of the construction lift for high-rise building construction by using image sensing technology, height measuring sensor, and load cell. This algorithm makes turn-around decision of the construction lift by considering the information and the number of user. It occurs when the call comes from a floor where the construction lift already have passed. The purpose of this study is to reduce the total latency of the construction lift user. Furthermore, it is possible to prevent delay in construction duration by carrying out a priority operation of the construction lift for the critical workforce.

  • PDF

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

Analysis of Interference Elements for the Integrated Equipment Operation in Tall Building Construction (초고층 골조공사의 통합 장비 운영을 위한 장비 간의 간섭요소 분석)

  • Lee, Dongyoon;Lim, Hyunsu;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.173-175
    • /
    • 2013
  • In tall building construction, the equipment operation plans have an effect on productivity. Equipment, used in tall building construction, has operating plans of each it and restrictively operate owing to the first placed equipment operation. Therefore the interference of equipment was occur frequently. As it, the productivity is less effective and the construction delay occurs. This research was analysis the interference elements between the equipment for constructing the efficient equipment associated operational processes. The interference elements between the equipment derive through expert advice and analysis using IPA. Through the IPA, this research deducted the interference elements located 'Concentrate Here' which is the highest importance and the lowest performance.

  • PDF

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF