• 제목/요약/키워드: 건축공정

검색결과 444건 처리시간 0.022초

An Analysis of a Request for the Development of Computer Application Technology in an Architectural Construction Management System (건축공정 관리시스템의 전산적용 최적화를 위한 시스템 개발 요구 분석)

  • Kwon, Choon-An;Ji, Suk-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • 제11권6호
    • /
    • pp.567-575
    • /
    • 2011
  • With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.

Integration of Construction Inspection to Schedule Management (공정관리와 연계한 건설 검측 업무 체계화 방안)

  • Song, Bohyeon;Jeong, Seunghwan;Lee, Jin Gang;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.161-162
    • /
    • 2023
  • The construction inspection is conducted by the contractor or construction supervisor after a certain stage of work has been completed. As the consturction inspection task is dependant on construction schedule, however, it is difficult to plan inspection task systematically, resulting in increased supervision costs, delays in construction, and disputes. Therefore, this study aims to integrate inspection work with schedule management to systematize inspection procedures. Firstly, the inspection work is defined based on the construction supervision checklist. Then its relationship with the construction process, required time, and resources for inspection tasks are defined in construction schedule. Lastly, a process management program is used to assess the effects of applying the inspection work and examine changes in the overall construction period and process management. The proposed method in this study can support to plan construction inspection more systematically and to improve the effectiveness of construction quality management.

  • PDF

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

TACT Modification Methods for Responding to Delay in Winter Season (동절기 공정지연 대응을 위한 TACT 공정 조정방안)

  • Kim, Dae-Kyu;Jeong, Yong-Joon;Lee, Jun-Ho;Moon, Hyun-Seok;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.125-126
    • /
    • 2011
  • Construction projects are being more complicated in proportion to the economic development. Process management is a critical issue in the construction that decides success of a project. Especially, a TACT method which divides and manages resources to repeat each activity is more important. Although becoming an issue dealing with the delay at winter season, it is not property developed. This paper suggests 'activity priority method' and 'TACT unit method' through case study. We validate necessity and efficiency of the TACT method through simulations and a survey. We expect cost reduction by decreasing unnecessary spending.

  • PDF

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

A Fundamental Study on the Float Application of Construction Schedule Management (건설 프로젝트 공정관리에 있어서 Float 활용에 대한 기초연구)

  • 이상범;진유나;송진우;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.133-137
    • /
    • 2003
  • Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.

  • PDF

Development of a Pretreatment Process for Coal Gasification Slag to Convert High-quality Aggregates. (고품질 골재 전환을 위한 석탄 가스화 용융슬래그의 전처리 공정 개발)

  • Hu, Yun-Yao;Han, Soo-Hwan;Lim, Gun-Su;Han, Jun-Hui;Kim, Jong;Han, Min-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.122-123
    • /
    • 2021
  • This study examines the performance of pretreatment process system as the initial construction stage of the pretreatment process system to use CGS, a by-product generated in IGCC, as a concrete fine aggregate of construction materials. The process undergoes a grinding process capable of grinding to a predetermined particle size during primary grinding and a sorting plant through sieve grading of 2.5 mm or less for particle size correction. Afterwards, it is hoped that the use of coal gasification slag of Korean IGCC as a fine aggregate for concrete will be distributed and expanded by producing quality-improved CGS fine aggregate using water as a medium for removing impurities and particulates.

  • PDF

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

Structural Analysis of Advanced Spent Fuel Conditioning Process Facility (차세대관리 종합공정 실증시설의 구조해석)

  • 구정회;정원명;조일제;국동학;유길성
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.411-420
    • /
    • 2003
  • An advanced spent fuel conditioning process (ACP) is developing for the safe and effective management of spent fuels which arising from the domestic nuclear power plants. And its demonstration facility is under design. This facility will be prepared by modifying IMEF's reserve hot cell facility which reserved for future usage by considering the characteristics of ACP. This study presents a basic structural architecture design and analysis results of ACP hot cell including modification of the IMEF. The results of this study will be used for the detail design of ACP demonstration facility, and utilized as basic data for the licensing of the ACP facility.

  • PDF

A Study of the effectiveness of Pre-drying on the dyeing of wood blocks (예비건조를 도입한 염색무늬목의 공정개선효과 고찰)

  • Kim, Moon-Jeong;Lim, Kyung-Soo;Heo, Seong-Yong;Kim, Jong-Hoon
    • Proceedings of the Korean Society of Dyers and Finishers Conference
    • /
    • 한국염색가공학회 2011년도 제45차 학술발표회
    • /
    • pp.49-49
    • /
    • 2011
  • GNP 증가 등의 요인으로 생활수준이 향상되면서 사람들의 고급스럽고 아름다운 공간에 대한 선호도가 점점 증가하고 있으며 따라서 실내 인테리어 산업에 대한 관심이 높아지고 있다. 인테리어 산업에서 주로 사용되는 무늬목은 나무 모양이 나게 무늬를 새겨 넣어, 외양을 장식하는 얇은 합판으로 나무의 고급스러움과 아름다움으로 인해 고부가가치 상품으로 자리잡고 있으며 주로 실내인테리어장식 및 가구, 마루바닥, 건축내장재, 제재목 등의 건축 자제의 용도로 사용되고 있다. 또한 천연목재를 이용한 다양한 가공법으로 아름다운 무늬의 재현 등을 실제 이루고 있으며, 천연 목재의 색감 외 표백/염색/가공을 통한 염색무늬목 제조도 이루어지고 있는 실정이다. 무늬목 염색가공에 대한 기술이 보편화되지 않은 실정에서 고부가가치형 기술로 자리 매김 하기 위해서는 제조공정 시 보다 안정적인 작업성과 최소한의 작업 변수를 확보하는 것이 무엇보다도 중요하다. 이에 본 연구에서는 고부가가치형 무늬목의 생산성을 향상하고, 불량률의 최소화를 궁극적 목적으로 하며, 실제 침염목의 건조공정 중 최적의 함수율을 확보할 수 있는 예비건조 시스템을 개발 적용하여 시간과 에너지 절감 효과를 확보하였다. 생산 중 최대의 불량현상으로 갈라짐(건조로 발생한 응력에 의해 목리방향으로 갈라지는현상:checks)과 건조공정의 지연으로 발생하는 부패현상도 개선하였다.

  • PDF