• 제목/요약/키워드: 건설폐기물 발생량

Search Result 108, Processing Time 0.032 seconds

Improvement of Construction Waste Treatment when Dismantling Building (건축물 해체 시 발생하는 건설폐기물 처리의 문제점 및 개선방향)

  • Chae, Kyeong-Seok;Park, Jin-Gu;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.536-539
    • /
    • 2008
  • Construction waste is given a great deal of weight on the total waste. Because of many reconstructions, urban redevelopment projects and dismantlement of dilapidated building, construction waste that generated by dismantlement is having a great effect on total construction waste. Problems about waste treatment are increasing along with an amount of construction waste. Therefore, environmental problems that related to waste treatment become a social issue recently and problems about waste treatment are confronted with a major subject. A study focuses on giving solutions to treat construction waste through quantitative analysis of the problems about waste treatment.

  • PDF

A Regression Model for Estimating Solid Wastes of Apartment Construction (아파트 신축공사의 건설폐기물 발생량 예측 회귀모델)

  • Kim Sung-Hoon;Park Sung-Soo;Park Sung-Chul;Um Ik-Jun;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.329-334
    • /
    • 2004
  • The objective of this study regards the preceding condition of the construction disposal of waste which is appropriate, with occurrence quantity DB anger the occurrence quantity prediction which is accurate the regression model which it sees and with the method which is mote accurate prediction method of existing than to sleep it presents it does. This study acquires apartment results data of public construction and civil construction, and chose factor that exert biggest influence on the waste occurrence amount through question and interview memorial address by regression model variable. And presented regression mode] which uses statistics program named SPSS. Result of this study by regression model through constant results data DB anger existent error big experience than estimate method that corrector estimation is available show.

  • PDF

A Analysis of Generated Construction Waste and Dismantlement Method by Field Investigation (분별해체 현장조사에 의한 건설폐기물 발생량 및 공정 분석)

  • Lee, Jong-Chan;Song, Tae-Hyeob
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.1
    • /
    • pp.101-109
    • /
    • 2009
  • This CW(Construction wastes) are increasing as construction industry is growing, so many countries make efforts to recycle CW. Korea also made a stipulation for recycling CW. But the main content of this stipulation is for using recycled aggregates. Advanced countries try to increase reuse rate of not only recycled aggregate but also other kinds of wastes. So they are adopting SDM(separating dismantlement) method and we are also planning to make the system for SDM. This study is about SDM analysis through construction field investigation and difference analysis between SDM and UDM comparing predictive amount by UDM with real generated amount by SDM. First, the generated amount of construction wastes by SDM is more than estimated amount by UDM, and mixed waste was specially reduced more than UDM. The warehouse is easier than the office building to applicate SDM. But still there is no manual for SDM in the site, so establishment of SDM is demanded.

  • PDF

A Guideline for Construction Management Plan Based on the Characteristics of $CO_2$ Emissions: A Case Study for a High-Rise Residential Building Project ($CO_2$ 배출 특성을 고려한 건설폐기물 관리방안 수립기준: 고층 주거건물 건설 프로젝트를 대상으로 한 사례조사)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.150-158
    • /
    • 2007
  • As the amount of $CO_2$ emission in Korea is ranked 9th and the increasing rate of $CO_2$ emissions highest in the world, it is strongly necessary to devise methods to decrease the amount of $CO_2$ in each industry as the basis of establishing environmentally sustainable production system. This paper aims to identify the characteristics of $CO_2$ emissions from construction wastes throughout the simplified LCA (Life Cycle Assessment) and suggest the strategic guideline for the construction waste management plan to decrease $CO_2$. As a result of LCA on the case of a high-rise residential building project, total sum of $CO_2$ emission generated from construction wastes appeared as 6,818,123kg-$CO_2$ and $CO_2$ emission per unit floor area as 21.01kg-$CO_2/{\beta}{\ge}$. The principal waste materials generating more than 95% of $CO_2$ are materials such as reinforcing bar, temporary materials, cement, ready-mixed-concrete, concrete products, and tile, which have relatively high unit emission rate of $CO_2$ in the process of production. Besides, more than 92% of $CO_2$ was generated from the activities such as structure work, plaster work, temporary work, and tile and stone work, which are generally executed in the early phase of the whole construction period. Reflecting these results, the guideline for the construction waste management plan was recommended. If the waste management plan is established considering the guideline suggested, there would be high potential to decrease the amount of $CO_2$ generated from construction wastes.

Evaluation of Greenhouse Gas Emissions for Life Cycle of Mixed Construction Waste Treatment Routes (혼합 건설폐기물 처리경로별 전과정 온실가스 발생량 평가)

  • Kim, Da-Yeon;Hwang, Yong-Woo;Kang, Hong-Yoon;Moon, Jin-Young
    • Resources Recycling
    • /
    • v.31 no.1
    • /
    • pp.56-64
    • /
    • 2022
  • Construction waste is generated at a rate of approximately 221,102 tons/day in Korea. In particular, mixed construction waste generates approximately 24,582 tons/day. The other components were recycled by 98.9%. The amount of greenhouse gas emissions from the waste was 17.1 million tons of CO2 equaling 2.3% of the total greenhouse gas emissions. To reduce greenhouse gas emissions, reducing the environmental impact is becoming increasingly important. However, appropriate treatment must first be established, as mixed construction waste is also increasing. Thus, an effective plan is urgently needed because it is frequently segregated and sorted by the landfill and incinerated. In addition, there is an urgent need to prepare various effective recycling methods rather than a simple treatment. Therefore, this study analyzed the environmental impact of the treatment of mixed construction waste by calculating greenhouse gas emissions. As a result, the highest greenhouse gas generation occurred during the incineration stage. Moreover, the optimal method to reduce greenhouse gas emissions is recycling and energy recovery from waste. In addition, the amount of greenhouse gas generated during energy recovery from the waste stage was the second highest. However, greenhouse gas emissions can be reduced by using waste as energy to reduce fossil fuel consumption. In addition, for the transportation stage, the optimal reduction plan is to minimize the amount of greenhouse gas emissions by setting the optimal distance and applying biofuel and electric vehicle operations.

The Effect of Waste Disposal Volume on Earnings Management Behavior in the Construction Waste Disposal Industry - Focused on the Size of the Licensed Storage Capacity and the Location of the Waste Disposal Site - (건설폐기물 기업의 폐기물처리량이 이익조정에 미치는 영향 - 허용보관량 규모와 폐기물처리장 소재지를 중심으로 -)

  • Kim, Dae-Bong;Lee, Hyo-Ik
    • Resources Recycling
    • /
    • v.24 no.5
    • /
    • pp.40-55
    • /
    • 2015
  • The purpose of this study is to analyse whether the waste disposal volume level in the construction waste disposal industry makes a different effect on earnings management behaviour by size of the licensed storage capacity and by location of the waste disposal site. The empirical results of this study are as follows. First, the waste disposal volume significantly influences earnings management behavior. When it comes to the size of licensed storage capacity in the small-sized capacity firms, the smaller waste disposal volume firms make more aggressive earnings management by using discretionary accruals. On the other hand, in the large-sized capacity firms, more waste disposal volume firms report higher earnings by adjusting more discretionary accruals. Second, the effects of waste disposal volume on the earnings management show different pattern depending on the location of waste disposal site. When the firms are located in the non-capital regions, the smaller waste disposal volume firms report higher earnings by adjusting discretionary accruals as well as by using real activities earnings management. However, the firms located in the capital regions show more aggressive earnings management when they have higher waste disposal volume level.

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

Effects of Tourist and Accommodation on the Municipal Solid Waste Generation in the Small Island (소규모 도서지역에서 관광객 및 숙박시설이 생활폐기물 발생량에 미치는 영향)

  • Lim, Ji-Young;Park, Sang-Hyun;Song, Seung-Jun;Cho, Young-Gun;Kim, Jin-Han
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.27 no.1
    • /
    • pp.15-22
    • /
    • 2019
  • This study analyzed the correlation between generation of municipal solid waste (MSW), number of tourists, and area of accommodation facilities of small island such as Shin, Si, Mo and Jangbong island in Ongjin county, Incheon for use as basic data for estimation of MSW generation. An analysis of statistics data from september in 2012 to august in 2018 showed MSW generation was steadily increasing, and MSW generation in 2018 was increased by about 3.98 times compared to 2012. In summer, which is the tourist season, MSW generation was 2.43~9.39 times higher than in winter. MSW generation was influenced by the number of tourists. As of August 2018, generation rate of per capita of MSW was $0.839kg/cap{\cdot}day$, which was about 3.71 times higher than August 2013. Area of accommodation increased continuously from 2008 to 2017, increasing by about 8.32 times. The coefficient of determination between the area of accommodation and the number of tourists was 0.8418. Also coefficient of determination between area of accommodation and MSW generation were 0.9370 and 0.6025 before and after August in 2015, respectively. Accommodation was lacked due to increase of tourists. Although accommodation was scarce because of increase in the number of tourists since 2015, the coefficient of determination decreased due to the increase in waste generation.

A study on application of RFID technology for optimum Processing and management of construction waste (건설폐기물의 적정 처리 및 관리를 위한 RFID기술 적용방안)

  • Lee, Seul-Ki;Jeon, Sang-Min;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.774-780
    • /
    • 2007
  • Occurrence amount of construction waste dominates weight that is the most as 44.6% if examine domestic waste occurrence present condition, scales of construction becomes jumbo gradually depending on social environment that change and occurrence amount of construction waste is steadily increasing real condition. Construction waste processing and recycling expense have held about 0.5% to 1% of whole construction cost, but if do not manage construction waste efficiently in each construction site, ratio that construction waste processing and recycling expense hold in whole construction cost is expected that will rise more. This does hint that environmental harm and economical damage are serious by construction waste. In this study, system is activated in each construction site at information interchange system and waste electron succession and waste government official makes radio frequency realization technology (RFID) purpose suggest plan that can be applied efficiently through example analysis that a RFID technology is already applied by efficiently attained plan.

  • PDF

Patterns and Factors Causing Construction Waste Generation in High-Rise Housing Projects in Korea : A Case Study (고층 주거건물 프로젝트에서 발생하는 폐기물 발생패턴 및 발생 유발 요인 분석)

  • Cha, Hee-Sung;Shin, Dong-Woo;Kim, Jee-Hye
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.159-168
    • /
    • 2006
  • In order to respond to interest and regulations in sustainable environment which is increasing, construction industry needs to establish a sustainable production system. When generation of wastes can be diminished and recycling of them raised in the construction site as a part of a sustainable production system, it might contribute to not only establishing a sustainable production system but also gaining economical profit. This study is a preliminary research for establishing a sustainable production system, which aims to identify construction waste generation patterns and factors causing construction waste generation. Case studies were implemented to investigate these patterns and factors.