• Title/Summary/Keyword: work analysis method

검색결과 4,402건 처리시간 0.031초

Walsh변환을 이용한 한국어 숫자음 음성분석에 관한 연구 (A Study on Korean Speech Analysis using Walsh Transform)

  • 김계현;김준현
    • 대한전기학회논문지
    • /
    • 제37권4호
    • /
    • pp.251-256
    • /
    • 1988
  • This work describes a speech analysis of Korean number ('1'-'10') which are spoken by several speakers using Fast Walsh Transform(FWHT) method. FWHT includes only addition and subtraction operations, therefore faster and needs less memory than FFT(Fast Fourier Transfifrm) or LPC(Linear Predictive Coding) analysis method. We have investigated that FWHT method can find speaker independent feature(which represents same cue about some word independent of different speakers) The results of this experiment, the 70% of same words(korean number '2')which spoken by several speakers have had slmilar patterns.

  • PDF

전자기력에 대한 설계민감도 계산 및 위상 최적화 (Design Sensitivity Analysis and Topology Optimization for Electromagnetic Force)

  • 문희곤;왕세명
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 B
    • /
    • pp.708-710
    • /
    • 2003
  • This paper presents design sensitivity analysis for the electromagnetic force and torque obtained from Coulomb's virtual work method using the adjoint variable method. And virtual displacement field is calculated from a static structural analysis. Derived equations are verified by comparison with finite different method. And topology optimization for a c-core is given as a verification example.

  • PDF

공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발 (Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment)

  • 김민주;김태훈;임현수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

다구찌 방법을 이용한 레이저 리소그라피 미세패턴 가공조건의 최적화 (Optimization of Laser Lithography Micropatterning Technique based on Taguchi Method)

  • 백남국;김대은
    • 한국정밀공학회지
    • /
    • 제19권7호
    • /
    • pp.59-64
    • /
    • 2002
  • Laser lithography technique is useful for fabricating micro-patterns of silicon wafers. In this work, the laser lithography micromachining technique is optimized based on Taguchi method. Sensitivity analysis was performed using laser scanning speed, laser power level, developing time and mixture ratio between developer and Di-water as the parameters. The results show that for the photoresist used in this work, 70${\mu}m$/s scan speed, 50㎽ laser power, 60sec. developing time and 6: 1 mixture ratio gives the best result. This work shows the effectiveness of laser lithography technique in fabricating patterns with a flew micrometer in width.

저층아파트 해체공사의 공기산출에 관한 연구 - 압쇄공법을 중심으로 - (A Study on the estimation method for the term of demolition work In Low-rise Apartment house - Focus on Clutcher Method -)

  • 양극영;문명완;이대재;윤여완;정미선
    • 한국주거학회논문집
    • /
    • 제8권3호
    • /
    • pp.231-236
    • /
    • 1997
  • After 1970 Years. Korea has developed a concept of public domestic housing. But this house is reached the uppermost limit time of using the occupant's satisfying life. Then reconstruction of Apartment house is urgently needed which is developed in Korea. So this study is examined the demolition work on current reconstructing apartment site. for reconstruction. Therefore this research examined the fitted demolition time of low-rise house and characteristics of demolition works. The conclusions from this experiment are shown below. 1. The average day work in clutcher method is shown about 1, 032㎥/Day. 2. The calculations of the term of construction which is produced by the analysis of demolition construction period on low-rise house is below. D(day) = S(day) + (0.272+0.000902b(㎥))+R(day)

  • PDF

A Study on the Fault Diagnosis of the 3-D Roll Shape in Cold Rolling

  • Lee, Chang-Woo;Kang, Hyun-Kyoo;Shin, Kee-Hyun
    • Journal of Mechanical Science and Technology
    • /
    • 제18권12호
    • /
    • pp.2174-2181
    • /
    • 2004
  • The metal processing system usually consists of various components such as motors, work rolls, backup rolls, idle rolls, sensors, etc. Even a simple fault in a single component in the system may cause a serious damage on the final product. It is, therefore, necessary to diagnose the faults of the components to detect and prevent a system failure. Especially, the defects in a work roll are critical to the quality of strip. In this study, a new 3-D diagnosis method was developed for roll shape defects in rolling processes. The new method was induced from analyzing the rolling mechanism by using a rolling force model, a tension model, the Hitchcock's equation, and measurement of the strip thickness, etc. Computer simulation shows that the proposed method is very useful in the diagnosis of the 3-D roll shape.

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

유전 알고리듬을 이용한 소형 고속스핀들 시스템의 바-피더 지지부의 위치 최적선정 (Optimum Bar-feeder Support Positions of a Miniature High Speed Spindle System by Genetic Algorithm)

  • 이재훈;김무수;박성훈;강재근;이시복
    • 한국정밀공학회지
    • /
    • 제26권11호
    • /
    • pp.99-107
    • /
    • 2009
  • Since a long work piece influences the natural frequency of the entire system with a miniature high speed spindle, a bar-feeder is used for a long work piece to improve the vibration characteristics of a spindle system. Therefore, it is very important to design optimally support positions between a bar-feeder and a long work piece for a miniature high speed spindle system. The goal of the current paper is to present an optimization method for the design of support positions between a bar-feeder and a long work piece. This optimization method is effectively composed of the method of design of experiment (DOE), the artificial neural network (ANN) and the genetic algorithm (GA). First, finite element models which include a high speed spindle, a long work piece and the support conditions of a bar-feeder were generated from the orthogonal array of the DOE method, and then the results of natural vibration analysis using FEM were provided for the learning inputs of the neural network. Finally, the design of bar-feeder support positions was optimized by the genetic algorithm method using the neural network approximations.

A Study on Work Ability among Aging Workers in Korea

  • Kim, Day Sung;Park, Jae Oh
    • 대한인간공학회지
    • /
    • 제33권5호
    • /
    • pp.423-432
    • /
    • 2014
  • Objective and Background: The objective of this study was to evaluate the association of individual characteristics, work-related factors, lifestyle factors, and health problems with work ability among aging workers in Korea. Method: In this cross-sectional survey, the study population consisted of 1,594 workers who had participated in a voluntary health promotion center and private workplace. Participants completed the work ability index. Results: The mean WAI score was 37.4, while the mean age of the sample was 43.25. In the age group over 50 showed 36.26. The majority of participants rated their work ability as 'good' to 'excellent', one-third moderate and about 7.5% poor. Work ability decreased significantly with age among the men. The younger group had higher scores on the work ability index than the age group over 50, except for mental resources. By work characteristics, work ability was analyzed to be the lowest in the case of work handling heavy stuff. Lastly, as a result of health factors analysis, the good management and retention of current health status can be the measure helpful to the improvement of work ability. Conclusion and Application: According to the results, it can be a basic principle to devise and enforce preventive measures on the factors for which improvement or action is possible, together with workplace-level systematic approach, in order to improve work ability. For such measures to be realized, it is necessary to check trends in change for several years.

건설공사의 중대재해 원인분석에 관한 연구 (A Study on the Analysis of Causes for Fatal Accident in Construction Works)

  • 박종근
    • 한국안전학회지
    • /
    • 제12권4호
    • /
    • pp.122-133
    • /
    • 1997
  • Various types of fatal accidents are increasing in Korean construction work site. Simply repeated and conventional accidents as well as new types of potential hazards which are caused by large-scaled work, complexity and negligence of temporary structures in construction are increasing, so that analysis of fundamental causes are necessary to control the construction accidents. In this study 739 fatal accidents are informally classified by the types of work and work process. The classified items which are based on ANSI Z 16.2, are modified adapted to the construction fields and are given code numbers and are analyzed by the data-base program. The exact causes of various types of accidents are analyzed by the accident types, agencies and hazardous conditions and through the Cross-tabulation method in order to find out the cause between relevant accidents.

  • PDF