Power grids are large complicated networks in use around. An absolute phase value for a particular unknown-phase line at a local site should be identified for the operation and management of a 3-phase distribution network. The phase shift for a specific point in the line, as compared with a phase reference point at a substation, must be within a range of ${\pm}60^{\circ}$ for correct identification. However, the phase shift at a particular point can fluctuate depending on the line constants, transformer wiring method, line length, and line amperage, etc. Conducted in this study is a theoretical formulation for the determination of phase at a specific point in the line, Simulink modeling, and analysis for a distribution network. In particular, through evaluating the effects of unbalanced current loads, the limitations of the present phase identification methods are described.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.1
no.2
/
pp.7-11
/
2008
In order to enhance standardization and interoperability of local level systems, AHU control network was designed with basement(8 point) and basis story(15 point) and then the network was constructed by power line communication. Each devices of AHU system were programed with neuron C of $L_{ON}W_{ORKS}$ as an open protocol. As a result of a study, each devices of the network were controlled with self dispersion process by $L_{ON}W_{ORKS}$ protocol and wiring could be reduced by power line communication.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.1
/
pp.194-202
/
2017
In this study, we measured and analyzed electrical noise signals present in devices and systems operated in industrial facilities. Based on the analytic findings, we studied the most effective improvement measures for eliminating such noise signals. Leakage current and ground current generate data interferences in communication systems, and therefore we measured leakage current and ground current. We also measured and analyzed electrical noises in power systems to predict noise pathways and interference routes. Furthermore, we proposed the most effective and reliable improvement measures for blocking off various noise signals and safely eliminating them by improving the internal wiring of the facilities and grounding systems. As a final step, we conducted the proposed improvement measures and confirmed that they helped to improve the operations of the device sand systems in service by re-measuring electrical noise signals and comparing them with those measured before the proposed improvement measures were implemented.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.7
/
pp.1290-1294
/
2016
In this study, we investigate the sources of system malfunctions by measuring and diagnosing various surges and noise signals from grounding systems for electrical and electronic systems and installations in order to ensure the reliability and stability of the system operations. We measured performance or structural problems detected in the grounding systems currently in operation and analyzed the measured data in order to eliminate noise currents and interferences causing the systems to malfunction and be damaged. Based on the analysis results, we proposed improving grounding systems and the wiring arrangements most appropriate for the grounding systems and carried out the installations as per the proposed engineering. We verified that the proposed engineering made the status of system operations improved by measuring the ground noise signals during the system operations and comparing them before and after improvements being carried out.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.4
/
pp.885-891
/
2011
In this paper, we studied dc leakage current properties analysis of LED lamps of road and landscape lighting when leakage current appeared in dc power line. Generally, converter of LED lighting is divides to insulated type and non-insulated type according to components. When electric leakage happened in AC power line, earth leakage breaker(ELB) senses leakage current and interrupts electric circuit. In dc power source, We need experimental verification about dc electric leakage for electricity safety. In normal wiring conditions and in the water, in case of using insulated type of converter, dc leakage current did not occur. However, in case of using non-insulated type of converter, dc leakage current occurred and passed through into the ground. We found that there is a hazard of electric shock by dc leakage current. We expect that the results of these studies would be helpful for electrical safety of LED lamps for road and landscape lighting.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
1999.11a
/
pp.173-176
/
1999
Continuing improvement of microprocessor performance involves in the devece size. This allow greater device speed, an increase in device packing density, and an increase in the number of functions that can reside on a single chip. However this has led to propagation delay, crosstalk noise, and power dissipation due to resistance-capacitance(RC) coupling become significant due to increased wiring capacitance, especially interline capacitance between the metal lines on the same metal level. Becase of pattering MSSQ (Methylsilsequioxane), we use RIE(Reactive ton Etching) which is a good anisotrgpy. In this study, according as we control a flow rate of CF$_4$/O$_2$ gas, RF power, we analysis by using ${\alpha}$ -step, SEM and AFM,
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2006.06a
/
pp.14-15
/
2006
Application of the parallel Build-up is increasing continuously. This report presents about the PCB Build-up technology since 2000. Among the parallel build-up technologies, PALAP application - after making the via, filling the via with electric conductive paste, then expose to make wiring pattern and put them by layer without any glue or middle - is actively developing, especially DENSO company.
This paper describes the measurement and analysis of the basic line constants in PLC(Power Line Communication) in the residential building. An apartment is considered as one of the conventional residences to get the line constants in this paper and Agilent 4263B LCR Meter is used to measure the detailed values each area and the specific results and the averaged analysis data are shown in the tables. The measured results no different from the calculated values with using conventional formula due to the line arrangement neglected factors, complex permittivity, and etc. Also, this paper describes many kinds of lines and wiring figures of domestic construction. Finally, it is utilized with the analyzed line characteristics in frequency domain as a planning reference of PLC.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2007.06a
/
pp.207-208
/
2007
Recently, high performance microelectronic devices are designed in multi-layer structure in order to make dense wiring of metal conductors in compact size. Imprint lithography have received significant attention due to an alternative technology for photolithography on such devices. In this work, we synthesized dielectric composite materials based on epoxy resin, and investigated their thermal stabilities and dynamic mechanical properties for thermal imprint lithography. In order to enhance the mechanical properties and toughness of dielectric material, various modified polyetherimide(PEI) was applied in the resin system. Curing behaviours, thermal stabilities, and dynamic mechanical properties of the dielectric materials cured with various conditions were studied using dynamic differential scanning calorimetry (DSC), thermo gravimetric analysis (TGA), and Universal Test Method (INSTRON).
Proceedings of the Korean Society for Quality Management Conference
/
2006.04a
/
pp.381-391
/
2006
When the environmental materials of the raw and sub material to applied in electronic goods removed, the reliability assessment and the forecasting is stand on the low level and in case of neglect, it is acting as latent defect that can be connected to large size disaster. In this research, the study on the management method of environmental restriction substances which is recognized as important element in the reliability assessment about environmental material of electronic goods and the study on reliability assessment method of PWB without environmental material are progressed
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.