다수의 공사수행주체가 복잡한 생산프로세스 내에 존재하는 건설산업의 특성상 참여주체간에 발생하는 문제와 공정 간섭은 생산성 저하의 주된 원인이 된다. 이를 해결하기 위해 최근에 '다공종 통합발주방식'이 제안되었고 일부 대형업체를 중심으로 시범 운영되고 있다. 그러나 통합발주는 아직 제안 초기단계로 실질적인 시행을 위해서는 다양한 기초연구가 선행될 필요가 있다. 따라서 본 연구에서는 통합발주를 시행하여 원${\cdot}$하도급업체 모두가 효율성을 증진시킬 수 있는 작업요소를 규명하고자 한다. 이는 건설업 전반에 통합발주의 필요성을 인식시키고, 통합발주 시행 시에 다수의 공종을 통합하는 기준을 제공할 수 있을 것으로 기대된다.
The status of small and medium-sized enterprises has been changed into more independent business entities rather than simply subcontractor so that the utilization of specialized knowledge has been much more necessary for the survival in the market. However, small and medium-sized enterprises, it is difficult to sufficient investment in knowledge services due to limited resources relative to large enterprises and demand for knowledge services business of government support is growing. For this reason, it is important to measure accurately the demand for knowledge services of small and medium-sized enterprises in knowledge management for effective utilization of knowledge service. In this study, we analyzed previous studies on small and medium-sized enterprises knowledge services that can be utilized in a comprehensive way. As a result, we developed knowledge service needs assessment model based on five critical success factors for continual growth and 12 types of knowledge service. This model has been modified and supplemented through expert meeting using delphi research method and topic modeling analysis using secondary data. This study is attempted to appropriately measure necessary knowledge services for small and medium-sized enterprises so that generated the evaluation model of knowledge service demands, comprehensively dealing with core knowledge services for many kinds of business entities. It is expected that the developed model will be a useful tool to understand and evaluate knowledge services demands of enterprises.
We consider a supply chain where products are shipped to warehouse from manufacturing system to customers. Products are supplied from either in-house regular manufacturing or the secondary source such as subcontractor. The inventory in warehouse is controlled by base-stock policy, that is, whenever a demand arrives from customer, an order is released to the manufacturing system. Unsatisfied demand is backlogged. The manufacturing system is modeled as M/M/s+1/c queueing system, and the orders exceeding the given limit care blocked and lost. The steady state distribution of the outstanding orders and the throughput of the manufacturing system are functions of the level of engagement In the secondary source. There is a profit obtained from throughput and cost not only due to the engagement of the secondary source in the manufacturing system but also inventory positions. We want to maximize the total production profit minus the total cost of the production system by simultaneously determining the optimal level of engagement of the secondary source and the optimal base-stock level of the inventory. We develop two algorithms : one without guarantee of the optimal solution but with the small number of computations, the other optimal but with more computations.
Subcontractors have an increased risk of accidents compared to large contractors. Subcontractors' safety management system is in close association with workers in construction sites. Contractors should strengthen subcontractors' roll and responsibility and provide continual support to prevent an accident. And also these supporting system should be provided to subcontractors' headquarters as well as construction site. Contractors' priority management for subcontractors safety should be transferred from the post management for disciplinary action to the preventive management to improve subcontractors participation and safety performance. Subcontractors can not establish the safety management system with just a one time supporting only. Contractors support and monitoring should be provided to subcontractors regularly and continuously to establish their self safety management system. The subcontractors safety management system improvement program(SSMSIP) suggested in this study will be a effective supporting system for subcontractors to establish and improve their safety management system. If we carry out the objective and quantitative evaluations and supporting system such as SSMSIP and provide the consequential incentive program to subcontractors, it can contribute to the accident reduction.
건설현장에서 발생하는 재해는 산업재해보상보험으로 보상되는 것이 정상적인 방법이나 일부 재해는 발생사실을 은폐하여 건설업체나 현장에서 직접 보상하는 음성적인 방법인 ‘공상처리’를 하는 경우도 있다. 이러한 음성적인 방법은 공공 공사 입찰에 반영되는 PQ점수에서 가점을 받기위한 목적도 있으며, 향후 수주활동에 불이익을 당하지 않으려는 협력업체의 입장도 반영된 것으로 볼 수 있다. 일부는 재해율에 대한 건설업체의 약점을 알고 이를 이용하여 부당한 산재보상을 요구하는 경우도 있다고 한다. 본 연구는 건설현장의 재해가 미치는 영향과 환경을 알아보고, 이에 대한 건설공사 참여자의 인식을 조사하여 문제점 파악 및 대안 도출의 기초자료를 제공하는 것이다.
Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.
Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
한국건축시공학회지
/
제11권4호
/
pp.396-406
/
2011
Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.
This paper presents a production planning algorithm for minimizing the costs of production and subcontracting in SCM (supply chain management) environment. In our SCM environment, the several local plants that aye dispersed geographically produce parts and products. In this environment, we have to decide the production volumes of both parts and products considering the BOM (bill-of-material) structure to meet the fixed order quantity or forecasted demand quantity. Each plant produces the specified parts of product with finite production capacity. There exist subcontracting decisions relevant to the production capacity of each plant except the core process plant, and when we use the subcontractor's capacities we should be charged for the fixed subcontracting fees. The objective of this study is to solve the production planning problem, which minimizes the total costs of production, inventory, setup, and subcontracting under constraints of production and subcontracting capacity. For this problem, an integrated production planning model based on the multi-level capacitated lot sizing problem was formulated, and efficient decomposition algorithm was proposed. The experimental investigation shows that the proposed heuristic generates quite good solutions at very low computational costs.
The 3th International Conference on Construction Engineering and Project Management
/
pp.635-641
/
2009
In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.
Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.566-572
/
2009
Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.