BASIC RESEARCH OF SUB-PACKAGE PROBLEM IN KOREAN CONSTRUCTION INDUSTRY
- Jinho Shin (Dept. of Architecture, Seoul National University) ;
- Furusaka Shuzo (Dept. of Architecture and Architectural Eng., Kyoto University)
- Published : 2009.05.27
Abstract
In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.