• Title/Summary/Keyword: simulation of dam operation

Search Result 70, Processing Time 0.023 seconds

Simulation for the Optimal Operation of Soyanggang Dam and Hwachon Dam in the Flood Periods (홍수시(洪水時) 소양강(昭陽江)댐 및 화천(華川)댐의 최적운영(最適運營)을 위한 시뮬레이션)

  • Lee, Kil Seong;Jun, Kyung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.13-24
    • /
    • 1986
  • A real-time hourly operation model for the flood control of Soyanggang Dam and Hwachon Dam, which are located in the North Han River is developed. The method is based on simulation with a feedforward-feedback control. The feedforward control was mainly concerned with providing the release history from the single dams. The outflows from the single dam operation rules with forecasted inflows were used as the inputs to simulation. And then feedback control is applied to reduce the peak discharge at the junction. Also, sensitivity analysis of the operation model was provided to respect the temporal and spatial distribution of storms to the model.

  • PDF

A study for flood control method of Sumjingang Dam considering dam operation constraints (댐 운영 제약사항을 고려한 섬진강댐 홍수조절방식에 관한 연구)

  • Lee, Yongtaek;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.4
    • /
    • pp.249-261
    • /
    • 2024
  • Climate change has intensified the severity of extreme floods, presenting substantial challenges to dam management and operation. Traditionally, flood control strategies for dam operations have been based on theoretical scenarios, such as designed floods, without taking into account downstream conditions. However, in practice, managing floods involves operating dams based on climate forecasts. This strategy encounters challenges due to the limited predictability of climate forecasts, which in turn leads to uncertainty in decisionmaking among dam managers. This study proposes a flood control approach for dam operations that involves gradually increasing the outflow, considering the operational constraints and potential downstream damage, based on inflow data. The effectiveness of this method was assessed through simulation, employing both a designed flood and data from the most significant historical flood. The dam operation strategy for flood control presented in this study provides a framework for dam operators, facilitating consistent decisionmaking in flood management by integrating realistic dam operational conditions.

The optimal operation of reservoir systems during flood season (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Choi, Hyun-Gu;Kim, Dong-Il;Lee, Kyeong-Teak
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.743-746
    • /
    • 2008
  • Recently, due to the effect of global warming and extreme rainfall, the magnitude of flood disaster and the frequency of flood is rapidly increasing. In order to mitigate the damage of human and property from this kind of meteorological phenomenon and manage water resources scientifically, effective operation of dam and reservoir is very important. In case of Andong dam which was not performed a flood control function needs to develop new types of dam safety management measure because of recent extraordinary flood by typhoons. In case of Andong dam and Imha dam, I am using HEC-5 model in order to apply reservoir simulation. In this case, complex conditions among 100-year floods , 200-year floods and PMF was used. Also, I modified the maximum outflow 3,800m3/s into 3,490m3/s and applied this modified discharge in order to secure freeboard in the downstream. In an analysis that I applied modified outflow by 100-year floods and 200-year floods to, the result showed that river didn't overflow in Andong area but some other places have relatively low freeboard. In the cases that I modified maximum outflow, results showed that freeboard of levee is larger than existed simulation. In the simulation that I applied 200-year floods and PMF to and under a condition connected with PMF, results showed overflowing the levees. Because of the difference between the frequency of dam outflow and the design flood in river, it is required to improve the existed flood plan in the downstream of Andong dam. As a result of this study, the optimal operation of reservoir systems can be proposed to mitigate the flood damage in the downstream of Andong dam and also can be used to establish the flood plans.

  • PDF

A Study on Daily Water Storage Simulation of the Daecheong Dam by Operation Scenario of the Yongdam Dam (용담댐 운영 시나리오에 따른 대청댐 저수량 변화에 관한 연구)

  • Noh Jaekyoung;Kim Hyun-hoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1403-1407
    • /
    • 2005
  • In order to analyze the water storage of the Daecheong dam after constructing the Yongdam dam situated in upstream, a daily cascaded simulation model for analyzing water storages in the Yongdam-Daecheong dams was developed. Operation scenarios of the Yongdam dam were selected to 8 cases with the combinations of downstream outflows and water supplies to the Jeonju region. Daily water storages in the Daecheong dam was analyzed daily by simulating from 1983 to 2004. The results are summarized as follows. Firstly, water supplies from the Daecheong dam were analyzed to amount $1,964.2Mm^3$ on a yearly average in case without the Yongdam dam. In case with the Yongdam dam, water supplies from the Daecheong dam were analyzed to amount $1,858.7\~1,927.3Mm^3$ in case with downstream outflow of $5\;m^3$ is, and were analyzed to amount $1,994.9\~2,017.8Mm^3$ in case with downstream outflow of $10\;m^3/s $. These values are compared to $1,649Mm^3$ applied in design. Secondly, reservoir use rate which was defined rate of water supply to effective water storage reached $241.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $228.3\~236.8\% In case with downstream outflow of $5\;m^3/s$, and reached $245.1\~247.9\% in case with downstream outflow of $10\;m^3/s$. Thirdly, runoff rate which is defined rate of dam inflow to areal rainfall reached $57.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $62.0\~68.4\% in case with downstream outflow of $5\;m^3/s$, and reached $64.1\~68.5\% in case with downstream outflow of $10\;m^3/s$. Fourth, in case with downstream outflow of $10\;m^3/s$ is from the Yongdam dam, appropriate water supply amounts to the Jeonju region were analyzed to only $0.50Mm^3/day$ from the daily simulation of water storages in the Yongdam dam. Comprehensively, water supply capacity of the Daecheong dam was analyzed to affect in small amounts in spite of the construction of the Yonsdam dam. It is effected to achieve the effective water management of the Yongdam dam and the Daecheong dam by using the developed cascaded model.

  • PDF

Flood Control Operation of Soyang and Choongju Reservoirs by the Min-max DP (Min-Max DP에 의한 소양 및 충주호의 홍수조절운영)

  • 오영민;이길성
    • Water for future
    • /
    • v.19 no.4
    • /
    • pp.339-346
    • /
    • 1986
  • A real-time single reservoir operation model using the Min-max Dynamic Programming for the flood control of Soyanggang Dam and Choongju Dam is developed. The objective function is to minimize the maximum release from each dam and the constraints are those from ther reservoir and channel characteristics. Control and utilization efficiencies are used to measure the performance of the reservoir operation method (ROM). In comparison with those of simulation models(such as the Rigid ROM, the Technical ROM and the Linear Decision Rule), the efficiencies of the optimization model are superior for all return periods.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

Flooding Simulation of Sandae Reservoir Collapse using 2D Hydrologic Model FLO-2D (2차원 수문모형 FLO-2D를 이용한 산대 저수지 붕괴 침수 모의)

  • Liu, Danxun;Lee, Khil Ha
    • Journal of Environmental Science International
    • /
    • v.31 no.9
    • /
    • pp.757-766
    • /
    • 2022
  • This study is to examine how well the hydrologic model reproduces the dam collapse. To do this, A hydrologic model FLO-2D is being operated to reproduce dam collapse with rainfall data and surface data in a small dam. In order to examine the performance of the model, the simulation was compared and reviewed with the data collected through the field survey. The results show that it takes about 2 hours to reach 1 km downstream. Inundation areas are about 188,640 m2 by the simulation and the difference from the field investigation is about 6.1%. Ten representative points were selected from the areas where the simulation and the field survey did not match. The discrepancy is less than about 0.08 m and does not appear to be significant. This study will present basic information on disaster preparedness operation and planning to minimize damage caused by sudden collapse of agricultural soil dams in the future.

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

Application of the SCE-UA to Derive Zone Boundaries of a Zone Based Operation Rule for a Dam (저수지 수위 구간별 운영률의 구간 경계 도출을 위한 집합체 혼합진화 알고리즘의 적용)

  • Kang, Shinuk;Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.921-934
    • /
    • 2014
  • The purpose of the study is to derive a long term reservoir operation method that is easy to understand and apply to practical use for dam operators. The zone based operation rule is a simple method to make operation decisions by criteria corresponding to storage zones. The reservoir storage levels dividing a reservoir, however, must be determined by some methods. We developed a reservoir operation model based on the zone based operation rule and the shuffled complex evolution algorithm (SCE-UA) was used to determine storage levels for zone division. The model was applied to Angat Dam in the Philippines that has trouble in water supply due to imbalance between supply and demand. We derived a zone based operation rule for Angat Dam and applied it to the reservoir simulation of Angat Dam using the historical inflow. The simulation results showed water supply deficit and power generation were improved by 34.5% and 21.2%, respectively, when compared with the historical records. The current study results may be used to derive a long term reservoir operation rule.

A Comparative Study of Reservoir Operations for Flood Control of the Chungju Dam (홍수시 충주댐 운영방안의 비교검토)

  • 이길성;정동국
    • Water for future
    • /
    • v.18 no.3
    • /
    • pp.225-233
    • /
    • 1985
  • To develop a simulation strategy of multi-reservoir operation in flood season, the single dam operations methed for the Chungju dam are investigated in the Han river basin. Thus, spillway rule curve, rigid ROM, and linear decision rules are applied for control operations, subject to the restrictions imposed by the river and the reservoir characteristics. The storage and release and control/utility efficiencies for several floods are calculated. The variation of control coefficients with respect to the return period are also examined. As the results of this comparative study, the optimal operation method can be selected in terms of the magnitude of flood. With inflow forecasting, the flood control operation can be greatly improved by variable coefficients rigid ROM and linear decision rules.

  • PDF