Simulation for the Optimal Operation of Soyanggang Dam and Hwachon Dam in the Flood Periods

홍수시(洪水時) 소양강(昭陽江)댐 및 화천(華川)댐의 최적운영(最適運營)을 위한 시뮬레이션

  • 이길성 (서울대학교 공과대학) ;
  • 전경수 (서울대학교 공과대학 대학원)
  • Received : 1985.10.30
  • Published : 1986.03.31

Abstract

A real-time hourly operation model for the flood control of Soyanggang Dam and Hwachon Dam, which are located in the North Han River is developed. The method is based on simulation with a feedforward-feedback control. The feedforward control was mainly concerned with providing the release history from the single dams. The outflows from the single dam operation rules with forecasted inflows were used as the inputs to simulation. And then feedback control is applied to reduce the peak discharge at the junction. Also, sensitivity analysis of the operation model was provided to respect the temporal and spatial distribution of storms to the model.

본(本) 논문(論文)에서는 북한강(北漢江) 수계(水系)의 소양강(昭陽江)댐 및 화천(華川)댐의 실시간(實時間) 홍수조절(洪水調節) 모형(模型)을 개발(開發)하였다. 그 방법으로는 feedforward-feedback control에 의한 Simulation기법은 사용하였다. 즉, 예측 유입량을 이용한 단일댐 운영방안에 의하여 구간 각 댐의 방류량으로부터 두 댐의 합류점(合流點)에서의 유량을 구한 후 Feedback control에 의하여 합류점(合流點)의 첨두 유량을 경감하도록 상류댐 방류량을 재조정하도록 하였다. 또한 개발(開發)된 모형(模型)에 관한 민감도(敏感度) 분석(分析)을 행하였다.

Keywords