DOI QR코드

DOI QR Code

Analysis of Small reservoir system by Flood control ability augmentation

치수능력 증대에 따른 저수지시스템 분석

  • Park Ki-Bum (Department of Construction Information, Andong Science College) ;
  • Lee Soon-Tak (School of Civil, Urban & Environment Engineering, Yeungnam University)
  • 박기범 (안동과학대학 건설정보과) ;
  • 이순탁 (영남대학교 토목도시환경공학부)
  • Published : 2005.11.01

Abstract

As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

Keywords

References

  1. 권순국, 한건연, 서승덕, 최혁준, 2003, 이상강우에 대비한 성주댐의 홍수조절 능력 분석, 한국농공학회지, 45(6), 109-118
  2. US Army Corps of Engineers, 2000, Watershed Modeling System WMS User manual, chap. 2-4
  3. 경주시, 2005, 경주시 북천 저수호안공원조성에 대한 수리수문학적 조사연구 보고서, 118-183
  4. US Army Corps of Engineers, 2000, Hydrologic Modeling System HEC-HMS User manual chap 10-11
  5. 경주시, 1994, 형산강 하천법선타당성 조사보고서, 11-60
  6. US Bureau of reclamation, 1987, Design of Small Dams, Water Resources Technical Publication, 415-418
  7. 경주시, 1998, 덕동댐 정밀안전진단 보고서, 1555-1559
  8. 경주시, 2001, 덕동댐 정밀안전진단 보고서, 1312-1348