• Title/Summary/Keyword: schedule delay

Search Result 223, Processing Time 0.021 seconds

Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology (NFC(Near Field Communication)와 증강현실 기술을 활용한 모바일 기반 플랜트 배관공사관리 프로세스 체계 구축)

  • Moon, Daeyoon;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.122-131
    • /
    • 2014
  • As plant market grows up, client demands to increase quality, technology and to reduce construction period. Due to the vast scale of the construction site and complexity of process, plant project can have some problems of communication among the project participants, the duplication of work, errors and rework. As a result those cause more costs, delay the construction schedule and reduce productivity and quality. Therefore, real-time communication between participants and real-time sharing of information such as material, equipment and construction are required in plant project site. This research aims to propose process and develop system using NFC(Near Field Communication) technology and augmented reality technology with mobile device for plant construction site. Administrators and operators are able to work efficiently using proposed process and system which create an environment designed to share and deliver information such as material, construction information.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Towards attaining efficient management of berth maintenance in Saudi Arabian Industrial Ports

  • Mohammed E. Shaawat;Abdullah Binomar;Abdulaziz S. Almohassen;Khalid Saqer. Alotaibi;Mahmoud Sodangi;Ahmad Aftab
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.1
    • /
    • pp.25-42
    • /
    • 2023
  • Despite the significance of ports as critical economic infrastructure, the berth facilities usually deteriorate due to heavy loading, unloading, aging, environmental weather conditions, marine growths, and lack of efficient maintenance management. Marine berths require proactive maintenance management to limit deterioration and defects as no berth facility is maintenance-free. Thus, delay in carrying out maintenance work for the marine berths can be devastating to the operational process involving ship entry, loading, and unloading operations. The aim of this research is to coordinate both operations work, and maintenance works that take place inside the berth of a local industrial port in Saudi Arabia, by developing a novel framework that integrates both works without affecting the efficiency and functionality of the berth. The study focused on defining the operational process of the port and identifying the elements with direct and indirect effects. In addition to determining the priority for the entry of ships inside the berth, it also identified the factors involved in designing a framework that included maintenance work as a component of the monthly berth occupancy schedule. By applying a mathematical model, a framework was established, which includes all the important elements of the process. As a result of the mathematical method formulation process, a database was designed that organizes and coordinates the operations of all berths within the port. This creates time to carry out the required maintenance work monthly as well as ease of coordination with the contractors responsible for the implementation of those works.

Competency Level Evaluation for Construction Management in Southeast Asian Countries

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-Sik;Kim, Junyoung;Kwon, Byung-Gi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.146-152
    • /
    • 2017
  • Recently, countries in the South-east Asia are making efforts to enhance the construction industry system and introduce the construction management system. However, it is challenging to apply construction management in site due to lack of technology and professionals for CM. This can result in frequent safety accidents, cost overrun, schedule delay, etc. Therefore, it is necessary to carry out a clear evaluation of the overall situation regarding the level of technology and required competency. The objective of this research is to investigate on which management skills and items for CM are required to improve the construction management skills in South-east Asian construction industry. As a result of the questionnaire, most of the officials selected that the design phase and the construction phase are important works, and the engineers evaluated activities during the bidding phase, the design phase and the construction phase as important works for construction management. However, in most of the results, it was observed that the current competency of Vietnam construction is insufficient compared to the evaluated importance of the skills. This can be explained by the fact that they are not capable of managing construction projects effectively as compared to the importance. The results can help to realize the inadequate aspects of local construction industry, which will be the basis of improvements. Also, it is expected to be supportive to improve construction management in the countries and also provide indicators related to work stage or technology that should be acknowledged when establishing the advancing strategy for Southeast Asian countries in the future.

  • PDF

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

A Genetic Algorithm for Production Scheduling of Biopharmaceutical Contract Manufacturing Products (바이오의약품 위탁생산 일정계획 수립을 위한 유전자 알고리즘)

  • Ji-Hoon Kim;Jeong-Hyun Kim;Jae-Gon Kim
    • The Journal of Bigdata
    • /
    • v.9 no.1
    • /
    • pp.141-152
    • /
    • 2024
  • In the biopharmaceutical contract manufacturing organization (CMO) business, establishing a production schedule that satisfies the due date for various customer orders is crucial for competitiveness. In a CMO process, each order consists of multiple batches that can be allocated to multiple production lines in small batch units for parallel production. This study proposes a meta-heuristic algorithm to establish a scheduling plan that minimizes the total delivery delay of orders in a CMO process with identical parallel machine. Inspired by biological evolution, the proposed algorithm generates random data structures similar to chromosomes to solve specific problems and effectively explores various solutions through operations such as crossover and mutation. Based on real-world data provided by a domestic CMO company, computer experiments were conducted to verify that the proposed algorithm produces superior scheduling plans compared to expert algorithms used by the company and commercial optimization packages, within a reasonable computation time.

Comparison of Blood Glucose Level in Pancreatic Cancer on $^{18}F$-FDG PET (췌장암 환자의 양전자방출단층촬영(PET) 검사 시 혈당치와 영상에 관한 분석)

  • Oh, Shin-Hyun;Lee, Seung-Jae;Park, Hoon-Hee;Park, Yong-Sung;Kang, Chun-Goo;Lim, Han-Sang;Kim, Jae-Sam;Lee, Chang-Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.15 no.1
    • /
    • pp.65-69
    • /
    • 2011
  • Purpose: Normal pancreas has low uptake rate in $^{18}F$-FDG PET scan. However, it is possible to diagnose malignancy of pancreatic cancer which has high uptake rate. Many studies approve a high prevalence of diabetes in pancreatic cancer and if the blood glucose level (BGL) is over the normal range, FDG uptake will be decreased and there will be inconvenience for patients from the delay time to reduce the high BGL or could cause difficulty to arrange the schedule. Therefore, we studied the relation of BGL and image quality in pancreatic cancer on PET. Materials and Methods: A hundred patients had PET scan. The prevalence of pancreatic cancer and diabetes were evaluated using SPSS ver. 17. The fasting BGL of patients were examined and sorted as diabetes mellitus (DM) group and Non-DM group. For the evaluation, patients were divided into 3 groups (Non-DM, DM; BGL${\geq}7.0mmol/L$, and DM; BGL<7.0 mmol/L). The ROI was drown on Liver and Lung for the PET imaging analysis. Results: Fifty three male and forty seven female were in the patients. The average age was $60.1{\pm}13.5$. There were 36 patients (male: 22, female: 14, 36%) who had pancreatic cancer with DM. There were 15 patients who showed over 7.0 mmol/L in their fasting BGL and 85 patients who showed under 7.0 mmol/L in their fasting BGL. Among the Non-DM, DM; BGL${\geq}7.0mmol/L$, and DM; BGL<7.0 mmol/L, there was not a statistical significance (p>0.05). Conclusion: The prevalence of pancreatic cancer was comparatively high in this study. If the fasting BGL was slightly over the normal BGL, we believe it will not give a severe disturbance when the patients have PET scan. Furthermore, the examination schedule doesn't need to change and the inconvenience from the delay of patients preparation will be reduced.

  • PDF

The Scope and the Meaning of 'Time of Arrival' in Carriage of Passengers by Air : Focused on the Germanwings GmbH v. Ronny Henning, Case C-452/13 (2014). (항공여객운송에서의 지연보상과 도착시각의 의미 - EU 사법재판소 2014. 9. 14. 판결(ECLI:EU:C:2014:2141)을 중심으로 -)

  • Sur, Ji-Min
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.2
    • /
    • pp.267-290
    • /
    • 2018
  • This paper reviews and criticizes the EU Case of C-452/13, Germanwings GmbH v. Ronny Henning. Under this case, Ronny Henning later sued Lufthansa's budget carrier Germanwings after it refused to pay him 250 euros compensation for a delay he said totalled more than three hours. Germanwings, however, maintained his flight had arrived only two hours and 58 minutes behind schedule. In those circumstances, the following question to the European Court of Justice (ECJ) for a preliminary ruling: What time is relevant for the term time of arrival used in Articles 2, 5 and 7 of Regulation [No 261/2004]: (a) the time that the aircraft lands on the runway (touchdown); (b) the time that the aircraft reaches its parking position and the parking brakes are engaged or the chocks have been applied (in-block time); (c) the time that the aircraft door is opened; (d) a time defined by the parties in the context of party autonomy? ECJ says that the situation of passengers on a flight does not change substantially when their aircraft touches down on the runway at the destination airport, when that aircraft reaches its parking position and the parking brakes are engaged or when the chocks are applied, as the passengers continue to be subject, in the enclosed space in which they are sitting, to various constraints. Therefore, it is only when the passengers are permitted to leave the aircraft and the order is given to that effect to open the doors of the aircraft that the passengers may in principle resume their normal activities without being subject to those constraints. ECJ rules that it is apparent that Articles 2, 5 and 7 of Regulation No 261/2004 must be interpreted as meaning that the concept of 'arrival time', which is used to determine the length of the delay to which passengers on a flight have been subject, corresponds to the time at which at least one of the doors of the aircraft is opened, the assumption being that, at that moment, the passengers are permitted to leave the aircraft.

Characteristics of Sleep Pattern among Korean College Students (한국 대학생의 수면 양상 특징)

  • Kim, Seog-Ju;Lyoo, In-Kyoon;Won, Chang-Yeon;Jeong, Do-Un
    • Sleep Medicine and Psychophysiology
    • /
    • v.13 no.1
    • /
    • pp.15-21
    • /
    • 2006
  • Introduction: The objective of the present study was to investigate bedtime, rise time and time-in-bed of Korean college students, separately on weekday and on weekend and to compare them. In addition, this study also aimed to evaluate the influence of gender, age and grade on the above sleep parmeters in Korean college students. Methods: Information regarding bedtime and rise time, separately on weekday and on weekend, of Korean college students were obtained by self-administered questionnaire. Questionnaires of 1,825 students (1,416 females and 409 males, age 18-30;mean age $21.1{\pm}2.2$) were used for statistical analyses. Results: Korean college students retired to bed 50 minutes later (00:49 on weekday;01:40 on weekend;t=39.67, p<0.001), rose 1 hour 58 minutes later (07:52 on weekday;09:50 on weekend;t=39.46, p<0.001), and slept 1 hour 8 minutes longer (t=13.33, p<0.001) on weekend. Compared to male students, female students had earlier rise time (t=8.96, p<0.01;t=3.89, p<0.01) and earlier bedtime both on weekday and weekend (t=7.10, p<0.01;t=6.04, p<0.01), and shorter time-in-bed on weekday (t=1.99, p<0.01). In addition, rise time delay and time-in-bed increase on weekend were more prominent in female students than in male students (t=3.41, p<0.01; t=3.68, p<0.01). Grade was correlated with bedtime and rise time on weekday (${\beta}=0.1022$, p<0.01;${\beta}=0.1009$, p<0.01), bedtime and time-in-bed on weekend (${\beta}=0.1096$, p<0.01;${\beta}=-0.0990$, p<0.01), and differences between week-day and weekend of the rise time and the time-in-bed (${\beta}=-0.0906$, p<0.01;${\beta}=-0.1115$, p=0.02). Conclusions: In this study, Korean college students had earlier bedtime/rise time and shorter time-in-bed on weekday than on weekend. These findings suggest that weekday sleep-wake schedule of Korean college students may be advanced relative to their biological sleep-wake cycle and that this discrepancy may be associated with weekday sleep deprivation. In addition, differences of sleep patterns between weekday and weekend were more prominent in female students and students with lower grade. Therefore, discrepancy between weekday sleep-wake schedule and biological sleep-wake cycle, as well as weekday sleep deprivation, might be more serious in female or lower-grade students.

  • PDF

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.