PC 암거는 터파기, 하부지반 처리, 암거 거치, 상호접합면에 누수방지용 패킹재 부착, PS 강선의 긴장을 통한 상호박스 접합, 되메우기 등의 일련의 과정으로 시공되어진다. 이 때 부적절한 하부지반 처리는 박스간 상호 부등침하를 야기할 수 있으며 결과적으로 지하수의 와류 및 내부유수의 누수를 발생시키게 된다. 본 연구에서는 하부지반이 연약한 경우 PC 암거 접합부의 부등침하를 저감하기 위하여 개발된 PC 기초판과 일체화된 암거의 거동을 현장 시험시공을 통해 분석하였다. 암거의 거동은 접합부에서 암거간의 벌어짐, 하부지반에 작용하는 토압 증가량, 암거 상부의 침하량 계측을 통해 분석되었으며, 분석결과로부터 PC 기초판과 일체화된 암거가 일반적인 시공방법인 PS 강선의 인장으로 체결된 암거에 비하여 침하 및 접합부에서 벌어짐이 적게 발생하는 것으로 나타났다.
Slum settlement, a direct result of the rapid worldwide urbanization is a common site in most developing countries. Uganda is among the top African countries with high number of slums. The status of Katanga slum located in the low-lands between Mulago national hospital and Makerere University is a typical of many other slums within Uganda. This project proposal seeks to tackle urbanization challenges by specializing in slum upgrading as a sustainable way of curbing the menace. An integrated toilet, biogas, poultry and backyard gardening project is proposed as a channel of boosting the Katanga slum dwellers' economic, sanitation and domestic energy status. Designed to serve up to 30 households, the project will utilize residual wastes from poultry houses and toilets to produce biogas and slurry. The biogas yield will provide clean cooking fuel and energy for lighting, while the slurry used as organic fertilizers to improve vegetable yields. The social, economic and environmental impacts of the project will empower the vulnerable women and children within the slums and reduce water pollution and land degradation. This affordable project can be applied in developing countries experiencing slum settlement challenges as a strategy for reducing urbanization pressure.
SCP(Sand Compaction Pile) method that forms a composite ground by driving compacted sand piles into the soft ground. This method is one of the soil improvement techniques for reinforcing and strengthening soft ground deposits. This thesis describes the investigation on the behavior of soft ground reinforced with SCP by low improvement ratio. Direct shear test and consolidation test carried out to verified behavior of composite ground reinforced with SCP. Test results were discussed with reference to the amount of consolidation settlement, variation of shear resistance with area replacement ratio and effect of the stress concentration. And, laboratory model loading test carried out to verified the effect of the location and failure mode of reinforced embankment. Residual shear strength varies with the area replacement and constrict load in the low replacement ratio. Calculated stress concentration ratio overestimate than proposed valve by experimental, theoretical and analytical method. As regards the location, improving right below of the top of the slope was more effective than below of the toe of the slope. This thesis carried out to obtain fundamental information of behavior of the composit ground. Hereafter, centrifuge test that reproduce stress state of the in-situ must be necessary through the further study about pile penetration, reinforce position and construct time.
말뚝 기초의 거동은 말뚝을 둘러싼 주변 지반의 특성에 좌우되므로, 항타 중의 지반거동을 계측하고 지반과 말뚝 거동간의 상관관계를 분석하는 연구가 필요하다. 본 연구에서는 말뚝 인접지반에 간극수압계, 경사계, 지표 변위말뚝, 그리고 말뚝 변형률계 등을 매설하여 낙동강 하구지역에 위치한 대심도 연약지반에 약 57m 관입깊이의 PHC 장대 말뚝을 항타하였을 때 말뚝 축하중 분포와 인접지반의 거동을 약 1년간 계측하고 그 결과를 분석하였다. 계측결과 매립하중과 항타에 의해 발생한 점토층 내의 과잉간극수압이 소산되면서 말뚝체 내에 부마찰력이 점차 증가하는 것으로 나타났다. 부마찰력에 의해 발생한 말뚝체의 최대 압축력 중 약 30%는 항타 중 증가한 과잉간극수압의 영향 때문으로 나타났다. 그러므로, 점성토 지반에 설치되는 대부분의 말뚝에 대하여 부마찰력을 고려한 설계를 수행할 필요성이 강조되었다.
연약 점토지반에서의 2차 압밀침하량은 일반적으로 전체 압밀침하량에 비해 미소하고 2차 압밀까지의 종료시간도 상당히 길기 때문에 이를 무시하는 경우가 많으나 유기질 또는 고압축성의 점토에서는 비교적 큰 침하량이 발생하기 때문에 중요한 공학적 요소로 간주된다. 이러한, 준설매립지반의 잔류침하량을 저감시키기 위해선 선행재하공법(preloading)이 주로 적용된다. 본 연구에서는 대규모 매립지역의 장기침하량을 보다 합리적으로 결정하기 위하여 실내에서 단계재하 압밀시험 및 surcharging 압밀시험 등을 수행하였다. 서해안(인천) 및 남해안(광양) 일대의 대규모 준설매립지역에서 시료를 채취했으며, 이 지역내 준설점토의 2차 압밀특성치들을 실험으로 규명하여 장기침하량 예측에 필요한 기초자료로 활용하였다. 또한, 지리정보체계(geographic information system, 이하 GIS)의 위치정보(수치지도)에 지반정보(속성자료)를 접목시켜 해당지역의 자료를 D/B화 한 후, GIS의 연산기능 및 공간추정 기능 등을 활용함으로써 대규모 준설매립지역의 2차 압밀침하량을 예측하였다.
태풍에 의해 발생된 파랑하중에 의해 방파제, 안벽 등과 같은 해안구조물 하부의 해저지반 침하가 발생될 수 있다. 만약 해저지반이 모래인 경우, 잔류과잉간극수압발생과 반복적인 파랑하중에 의해 해저지반의 침하현상이 더 발생될 확률이 높아질 것이다. 그러나 대부분의 해안구조물은 설계에서 파랑하중을 정적상태의 등분포하중으로 구조물에만 작용하는 것으로 가정하고 있지만 실제로는 동적인 파랑하중이 구조물과 해저지반에 동시에 작용한다. 따라서 본 연구에서는 시간에 따른 실제파압을 고려하고, 구조물뿐만 아니라 해저지반에도 작용하는 것으로 고려하였다. 수치해석 결과 파랑하중이 구조물과 해저지반에 큰 영향을 미친 것으로 나타났다. 시간에 따른 해저지반의 변형거동이 해석되었으며 해저지반에서 유효응력의 변화와 유효응력경로의 변화를 분명하게 확인할 수 있었다.
Larger area will be constructed in a harbor land and container terminal which are constructed in reclaimed land using the dredged materials. Soil improvement work is to be carried out including constructibility, in which is monitoring devices, measuring frequency, installations etc. The ground water tables in the reclaimed area are affected by the several factors which are design reclamation level, consolidation settlement, remaining surcharge pressure and remaining excess pore water pressure. The plan wii be drawn up in which monitoring results for the ground water tables are capable to provide the reliable ground water table when designers and civil engineers construct the harbor structures considering constructibility.
한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
/
pp.606-611
/
1999
Recently , the hydraulic fill method is commonly used in many reclamation projects due to lack of fill materialss. The method of hydraulic fill i recalmation is executed by transporting the mixture of water -soil particles into a relcaimed land through dredging pipes, then the dredged soil particels settle down in thewater orflow over an out flow weir with the water. The amount of the volume reductions of dredged soil is considered the sum of the overall settlement by descication shrinkage and self-weigth consolidation and the loss of soil particles flow over a weir. In the present study, hydrometer analysis was performed with the soil samples obtained bofore and after dredging to estimate the amount of soil particles residual at reclaimed area and the loss of soil particles , then it was suggested the method of determining the loss ratio of dredged soils from the tests results. The hydrometer analysis of in-situ soil samples showed that the loss ratio of dredged soils is lowest at the nearest point to dredge pipe and highest at the nearest point of out flow weir.
In the large scale recent reclaiming works performed within the wide spatial boundary, evaluation of long-term consolidation settlement and residual settlement of the whole construction area is sometimes made with the results of the limited ground investigation and measurement. Then the reliability of evaluation has limitations due to the spatial uncertainty. Additionally, in case of large scale deep excavation works such as urban subway construction, there are a lot of hazardous elements to threaten the safety of underground pipes or adjacent structures. Therefore it is necessary to introduce a damage prediction system of adjacent structures and others. For the more accurate analysis of monitoring information in the wide spatial boundary works and large scale urban deep excavations, it is necessary to perform statistical and spatial analysis considering the geographical spatial effect of ground and monitoring information in stead of using diagrammatization method based on a time-series data expression that is traditionally used. And also it is necessary that enormous ground information and measurement data, digital maps are accumulated in a database, and they are controlled in a integrating system. On the abovementioned point of view, we developed Geomonitor 2.0, an Internet based real time monitoring program with a new concept by adding GIS and geo-statistical analysis method to the existing real time integrated measurement system that is already developed and under useful use. The new program enables the spatial analysis and database of monitoring data and ground information, and helps the construction- related persons make a quick and accurate decision for the economical and safe construction.
본 논문에서는 준설토를 활용한 경량혼합토(LWFS)의 연약지반개량 적용성에 대해 검토한 내용을 다루었다. 현재까지 제시된 경량혼합토의 공학적 특성에 관한 연구결과를 종합 분석하여 경량혼합토의 물성을 정리하였으며, 그 결과를 토대로 임의의 현장조건을 가정하여 경량혼합토공법과 SCP 공법 및 DCM 공법 적용 시에 대한 3차원 수치해석을 수행하였다. 연약지반개량공법 비교해석 결과, 경량혼합토 공법을 적용하는 경우 SCP 공법을 적용하는 수준 이상의 침하관리가 가능하며, 경량혼합토의 목표성능에 따라 침하발생 수준을 조절할 수 있는 것으로 검토되었다. 또한 DCM 공법과 비교 시 경량혼합토 재료의 경량성으로 과잉간극수압 발생량이 현저히 작아져 잔류침하를 최소화할 수 있는 것으로 검토되었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.