보 철근공사 조립공법별 작업시간분석 (Work Time Analysis of Rebar Fabrication Method in Beam Construction.)

  • 김주용;김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

접이식 철근 선조립 공법의 적용 가능성 검토에 관한 연구 (Application Possibility of Folding Pre-fabricated Rebar Cage in Domestic Construction Fields)

  • 정영철;이병윤;김광희
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.125-132
    • /
    • 2010
  • 최근 국내 외 경제적인 요인과 발주물량의 감소에 수주경쟁의 심화로 인한 수익성의 악화 등 여러 요인으로 건설업체는 경영적 측면에서 매우 큰 어려움을 직면하고 있다. 그러므로 건설업체는 생산성을 향상시킬 수 있는 공법의 개발이나 도입이 절실하다. 본 연구에서는 공장에서 선조립한 철근부재를 접을 수 있게 함으로써 부피를 축소하여 운반비를 절감할 수 있는 접이식 철근 선조립 공법의 현장 적용 가능성을 검토하는 것을 연구목표로 하였고, 검토한 결과, 접이식 철근 선조립 공법의 적용으로 선조립 공법의 단점인 운반비가 과다 발생한다는 단점을 개선 할 수 있어 건설현장의 생산성 향상이 가능 할 것으로 판단된다.

공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구 (Productivity Improvement Method of Wall Rebar Work in Apartment House Construction)

  • 김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

벽체철근 일반조립과 부분 선조립 공법의 작업시간 비교에 관한 연구 (The Comparison of Work Time between Field Fabrication Method and Partial Prefabrication Method of Rebar work)

  • 김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.12-13
    • /
    • 2018
  • Reinforced concrete works account for 40 to 50 percent of the total construction work. However, the shortage of construction workers is a problem in the delay of the construction period of reinforced concrete. The partial rebar prefabrication is one of the ways to shorten construction period. Thus, this study compared the partial rebar prefabrication and field fabrication method through work sampling. As a result, the partial rebar prefabrication showed a significant decrease in time compared to field fabrication method. As a result of this study, it is expected to be used as a reference for the efficient selection of reinforced concrete methods.

  • PDF

합성 PC 보의 하부철근 이음 및 정착방법에 따른 경제성 검토 (Economic Analysis of Connection and Anchorage Methods of Bottom Rebar for Composite Precast Concrete Girder)

  • 조원현;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.11-12
    • /
    • 2015
  • Green Frame is a Rahmen structure made of composite precast concrete members. According to the concrete design code, a lower rebar of precast concrete girder, should be extended to the inner precast concrete column. However, such extension of lower rebar may sharply reduce its constructability. To satisfy the criteria, the connection and anchorage of beam rebar should be taken into consideration, yet it is difficult to use lapping as it is not easy to ensure enough space when Green Frame method is adopted. To solve this, a new method of lower rebar connection and anchorage was developed, and this study is intended to review economic feasibility prior to applying the method developed onto sites. The study result can be used as basic data for selection of the optimal joint and anchorage method for lower rebar of the green frame construction.

  • PDF

국내 철근공사 실태분석 및 개선방안에 관한 연구 (A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction)

  • 박우열;김광희;강경인
    • 한국건축시공학회지
    • /
    • 제4권3호
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

Advancing an Automated Algorithm for Estimating Rebar Quantities in Columns

  • Rachmawati, Titi Sari Nurul;Widjaja, Daniel Darma;Kim, Sunkuk
    • 한국건축시공학회지
    • /
    • 제23권4호
    • /
    • pp.497-508
    • /
    • 2023
  • Manual estimation of rebar quantities by contractors often yields discrepancies between projected and actual amounts used in the construction phase, leading to cost inaccuracies and potential logistical challenges. To address these issues, there is a clear need for a method that allows precise estimation of rebar quantities during the design phase. Such a method would enhance contractor competitiveness during project bids, promote accurate cost calculations, and avert superfluous rebar purchases on-site. Given that columns are the primary structural components in reinforced concrete(RC) buildings and necessitate considerable amounts of rebar, this study focuses on creating an automated algorithm for estimating column rebar quantities. An analysis of the accurate quantities obtained via the study and those derived from manual estimation reveals a discrepancy of 0.346 tons or 2.056%. This comparison affirms the proposed algorithm's efficacy in eliminating errors from overestimation or underestimation of rebar quantities. The practical implications of this study are significant for construction companies as it fosters efficient and precise estimation of rebar quantities, ensuring compliance with related specifications and governing regulations.

원전구조물 부위별 철근모듈화 방안 연구 (The Rebar Modulation Method in the Area of the Nuclear Power Plant Structures)

  • 이병수;방창준;김석철;임상준;박종혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.15-16
    • /
    • 2013
  • Because of the complicated shape and the overcrowded arrangement of rebar, there are some problems in applying the rebar modulation for the Nuclear Power Plant Structures. In order to resolve these problems, we have been studying the rebar modulation method applying techniques of the high strength rebar for NPP Structure. After reviewing the rebar drawing of the NPP structures and performing the mock-up test, the rebar modulation method in the various area of the NPP Structure has been established. I will introduce this method and the future plan of the research.

  • PDF

3D 스캐닝을 활용한 철근배근 간격 확인 (Check Method of Rebar Placing Status Using 3D Scanning Technology)

  • 김주용;박지영;김채원;이영도;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2021
  • In the field of construction, research on smart construction technology is being actively pursued as a measure to increase productivity and efficiency. The technology that links 3D scanning and BIM of smart construction technology is in the limelight as a technology for checking the state of buildings in the field of architecture. It is thought that these techniques will be of great help in solving problems when the amount of inspection targets is large, such as confirmation of the rebar arrangement intervals, and therefore a large number of human resources are required. Therefore, in this study, we would like to apply 3D scanning to rebar construction to confirm whether the rebar arrangement can be confirmed according to the design drawing. In the study, the wall rebar of the rebar placed at the actual construction site was directly scanned to extract data, and the rebar placing status was confirmed through type analysis. As a result of analyzing the reinforcing bar arrangement state based on the data obtained by 3D scanning, it was found that the technology can be utilized.

  • PDF

철근 커플러이음의 시공품질 확인 현황 및 적정 시공품질 확인 방안 (Current Status and Appropriate Check Method of Construction Quality Control for Rebar Coupler Splice)

  • 김주용;김진동;이영도;김광희
    • 한국건축시공학회지
    • /
    • 제22권6호
    • /
    • pp.531-542
    • /
    • 2022
  • 건물의 초고층화에 따라 구조재료의 강도 증가와 철근의 배근량이 증가할 뿐만 아니라 철근의 시공과정에서 적절한 이음방식의 사용이 필수적인 요소 중 하나이다. 본 연구에서는 철근 커플러이음의 시공품질 확인실태를 전문가 설문을 통해 파악하고, 실제 현장 시공과 유사한 시험체에 대한 품질시험을 통해 적정 품질 확인방안을 제시하고자 한다. 시험결과 설문조사 결과에서 나온 품질확인 방법 중 커플러 조임방법과 상하 두 철근의 맞댐 정도 등이 시험체 강도에 영향을 주지 않는다는 결과를 얻었다. 따라서 철근과 커플러의 나사산 개수를 계산치보다 여유를 두고 제작하고, 현장 시공시 나사산이 완전히 조립되었는지 확인하는 것이 적절한 커플러 품질 확인방법으로 사료된다.