공정리스크 관리를 위한 BIM 적용 방안 (BIM Utilization Plan for Schedule Risk Management)

  • 이계현;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF

BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구 (Development of Construction Schedule Management System based on BIM)

  • 박소현;송정화;오건수
    • 대한건축학회논문집:구조계
    • /
    • 제34권3호
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

층간분리 방지를 위한 인발공정 패스설계 (Pass Design of Drawing Process to Prevent Delamination)

  • 이상곤;고대철;김병민
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2008년도 추계학술대회 논문집
    • /
    • pp.46-49
    • /
    • 2008
  • Drawing process of the high carbon steel wire with high speed is usually performed at room temperature using multi pass. Tn the multi pass drawing, temperature rise affects the mechanical properties of the final product. The excessive temperature rise during the deformation promotes the occurrence of delamination, and deteriorates the torsion property and durability of wire. This paper investigates the occurrence of delamination in the wire through the torsion test and the evaluation of wire temperature. The excessive wire temperature ieads to the occurrence of delamination. Based on the calculation of the wire temperature, a new pass schedule, that can prevent the delamination due to the excessive wire temperature rise, is designed through the isothermal pass schedule.

  • PDF

미니밀 마무리압연기의 Pass Schedule 설정 프로그램 개발 (Development of a Finishing-Mill Set Up Program for Calculating Pass Schedule In Mini Process)

  • 이호국;박해두;최갑춘
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 1996년도 춘계학술대회논문
    • /
    • pp.101-109
    • /
    • 1996
  • Mini-mill process which is one of the new steel -marking technologies to be able to produce the hot rolled coils by thin slab caster of ISP(In-Line Strip Production) type, will be completed in the Kwangyang Steel Works of POSCO in August, 1996, SEt-Up Model of finishing mill which consists of 5 stands is the most basic and essential in mini-mill plant. Therefore, the simulation program of Finishing-mill Set-Up model were developed in this research , using new temeprature prediction model, roll gap model and rolling physical model. Using the developed FSU program , pass schedules to produce the strips with target strip thickness of 1.8mm, 2.0mm, 2.3mm, 2.7mm an d3.0mm were also determined respectively.

  • PDF

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

고탄소강 연속 신선 공정의 재설계를 위한 등온패스스케줄 프로그램의 개발 (Development of Isothermal Pass Schedule Program for the Re-design of a Continuous High Carbon Steel Wire Drawing Process)

  • 김영식;김동환;김병민;김민안;박용민
    • 한국정밀공학회지
    • /
    • 제18권5호
    • /
    • pp.57-64
    • /
    • 2001
  • The high speed in the wire-drawing process to meet the demands for the increased productivity has a great effect on the heat generated due to plastic deformation and friction between the wire and the drawing dies. During the high carbon steel wire drawing process, the temperature rise gives a great influence to the fracture of wire. In this paper, to control the temperature rise in the wire after the deformation through the drawing die, the calculation method of the wire temperature, which includes the temperature rise in the deformation zone as well as the temperature drop in the block considering the heat transfer among the wire, cooling water and surrounding air, is proposed. These calculated results of the wire temperature at the inlet and exit of the drawing die at each pass are compared with the measured wire temperatures and verified its efficiency. So, using the program to predict the wire temperature, the isothermal pass schedule program was developed. By applying this isothermal pass schedule program to the conventional process condition, a new isothermal pass schedule is redesigned through all passes. As a result, the possibility of wire fracture could be considerably reduced and the productivity of final product could be more increased than before.

  • PDF

대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구 (Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling)

  • 최윤기;이현수;황영삼;김영석;김우영;송영웅
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.153-161
    • /
    • 2004
  • 대형 건설프로젝트의 효율적인 운용을 위해서는 프로젝트 각 분야간의 유기적인 관리체계가 필수적이라 할 수 있다. 대형 건설프로젝트의 관리업무 중 일정, 비용, 자재, 노무관리업무는 상호 유기적 종합관리를 가능하게 하는 업무들이며 이들을 종합적으로 $분석\cdot평가$할 수 있는 데이터 중심의 정보교환체계가 필수적이라 할 수 있다. 건설프로젝트관리의 $비용\cdot일정관리$업무에서 발생하는 자료의 중요성 및 활용빈도는 타 관리보다 높으며 건설공사의 효과적인 수행에 미치는 영향이 크다. $비용\cdot일정$ 통합데이터 통합관리를 통한 건설프로젝트관리체계를 수립하는 것은 생산성 측면과 자료 활용도 측면에서 더욱 효과적이라 할 수 있다. 본 논문에서는 $비용\cdot일정$ 통합 데이터베이스를 기반으로 하고 비용, 일정, 자재, 노무관리에 관련된 현장업무 분석을 통하여 대형건설공사의 프로세스 및 데이터 모델링을 통한 제반 필요정보의 분석 및 구조화를 제시하고자 한다.

건설기업 공정관리 패턴의 현황 및 변화 분석 (Patterns and Trends in Schedule Control Practice of Korean General Contractors)

  • 정영수;김희아
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.88-96
    • /
    • 2011
  • 공정(일정)관리는 가장 기본적인 건설업무기능 중 하나이며, 수십 년 전부터 네트워크 기반의 과학적 관리기법 (CPM, LSM, Simulation 등)이 개발되어 활용되어 왔다. 다양한 네트워크 관리기법과 더불어 공정관리 프로세스에 있어서도 공정표의 위계 및 표준 등의 실무절차가 일반적으로 활용되고 있다. 그럼에도 불구하고, 각 건설조직 또는 각 프로젝트 특성에 따라 공정관리의 실무적인 세부기법들은 다소 다르게 적용되며, 이러한 세부기법의 선택적용은 발주방식, 경영전략, 기술전략, 그리고 현장여건 등을 포함하는 포괄적인 프로젝트 환경에 의하여 영향을 받게 된다. 이러한 맥락에서, 본 연구에서는 우리나라 종합건설업의 기업차원 공정관리 방법을 조사함으로써 현황파악과 함께 변화추세를 분석하였다. 공정관리는 과학적인 '공정관리 기법' 활용과 더불어 포괄적인 '공정업무 체계'가 함께 운영되어야 하며, 본 조사는 후자인 공정관리 체계 관점에서 사업관리 기술 변화를 파악하는데 중점을 두었다. 연구방법으로는, 우선 공정관리의 실무기능을 분류 정의하였으며, 이를 바탕으로 설문을 작성하여 각 기업의 관리방법을 조사하였고, 마지막으로 설문응답을 분석을 통하여 시사점을 도출하였다. 총 45개 종합건설기업의 응답결과를 기업규모, 매출특성 등을 기준으로 분류하여 분석하였다.