Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling

대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구

  • Published : 2004.04.01

Abstract

The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.

대형 건설프로젝트의 효율적인 운용을 위해서는 프로젝트 각 분야간의 유기적인 관리체계가 필수적이라 할 수 있다. 대형 건설프로젝트의 관리업무 중 일정, 비용, 자재, 노무관리업무는 상호 유기적 종합관리를 가능하게 하는 업무들이며 이들을 종합적으로 $분석\cdot평가$할 수 있는 데이터 중심의 정보교환체계가 필수적이라 할 수 있다. 건설프로젝트관리의 $비용\cdot일정관리$업무에서 발생하는 자료의 중요성 및 활용빈도는 타 관리보다 높으며 건설공사의 효과적인 수행에 미치는 영향이 크다. $비용\cdot일정$ 통합데이터 통합관리를 통한 건설프로젝트관리체계를 수립하는 것은 생산성 측면과 자료 활용도 측면에서 더욱 효과적이라 할 수 있다. 본 논문에서는 $비용\cdot일정$ 통합 데이터베이스를 기반으로 하고 비용, 일정, 자재, 노무관리에 관련된 현장업무 분석을 통하여 대형건설공사의 프로세스 및 데이터 모델링을 통한 제반 필요정보의 분석 및 구조화를 제시하고자 한다.

Keywords

References

  1. 최윤기, 일정과 비용을 통합한 건설공사진도율 산정 시스템, 서울대학교 대학원, 박사학위논문, 1999
  2. MRP기법을 이용한 EVMS의 복합작업.자원계획에 관한 연구, 한국건설관리학회 학술발표대회논문집, 2001
  3. 정철원, EV개념에 의한 통합건설공사관리시스템, 한국건설관리학회 학술발표대회논문집, 2001
  4. 김우영, 공통자와 공통분류에 의한 비용/일정 통합모델개발, 대한건축학회 논문집, 2002. 8
  5. 이현수, 건설공사의 비용.일정 통합 모델에 의한 전사적 자원조달시스템 개발, 2002
  6. CII, Project Control for Engineering, Publication No. 6-1, Jul, 1986
  7. Rasdorf, William J. and Abudayyeh, Osama Y., Cost and Schedule Control Integration, Journal of Construction Engineering and Management, ASCE,1991