This study has suggested a decision method which determine optimum investment level for safety management by process risk assessment at gas governor station. Hazard and operability study(HAZOP), fault tree analysis(FTA) and consequence analysis(CA) were carried out and potential accident cost and benefit for safety management were estimated. As a result, we could be found the trend of safety cost and benefit by the nonlinear regression method and could be determined the optimum investment level for safety management from analysis of safety management cost and potential accident cost.
Journal of the Korea Institute of Information Security & Cryptology
/
v.27
no.6
/
pp.1483-1490
/
2017
Wearable devices need a host device to be paired with because of connectivity, functionality and ease personalization. There should be frequent update and backup processes between the paired devices even without user's consciousness. Due to pairing process, user-specific data are copied from smartphone and transferred to paired smartwatch. We focus on what happens in smartwatch because of pairing process. We perform an experiment study by observing and extracting data from smartwatch under real world usage phases. With a survey of user awareness on smartwatch regarding security and privacy, moreover, we suggest risk assessment on smartwatch in five levels, particularly considering pairing process based on security and privacy.
Kim, Tae-Ho;Park, Jun-Tae;Lee, Yeon-Hyung;Rho, Jeong-Hyun
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.6
/
pp.1287-1295
/
2015
This research is the study on the comparative evaluation of SPC (Staggered Pedestrian Crossings) vs PC (Pedestrian Crossings) using risk analysis. Accident factor was elicited by survey of driver's and pedestrian's at SPC & PC. I estimated the weight of a risk of violation and a mental burden by AHP (Analytic Hierarchy Process) and compared degree of risk at SPC AND PC. In conclusion, a new alternative plan of a pedestrian crossing system, staggered pedestrian crossing which plays an important role in traffic flow, pedestrian's crossings which plats an important role in traffic flow, pedestrian's convenience and traffic safer is sager than pedestrian crossings the degree of risk used this study doesn't imply an measure of the number of accident and the rate of accident, in estimating the degree of risk of pedestrian crossings, we should analyze more data of accident, behaviors, and road circumstance to include driver's and pedestrian's violation behavior in an estimate index.
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.29-36
/
2014
Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.
Journal of the Korea Institute of Military Science and Technology
/
v.19
no.6
/
pp.789-796
/
2016
In the Core Technology R&D of the defence area, the development of the related core element technology could be the foundation to develop advanced weapon system in the future. But it might make various problems if you can not accurately define the TRL of the element technology. In other words, if the technology is not sufficiently mature and then the project starts, it might require an increase in the development period and additional cost. Finally the system will be in an incomplete state and result in user dissatisfaction and the project failure. Therefore it is a very important task to properly assess the TRL for a successful project. In this study, We propose the method for risk management of core technology R&D project of the defence area using the QFD process with degree of difficulty and technology readiness level. It is also presented the process to determine the risk level using TRL and Degree of difficulty. Finally We apply this method to UGV system for verifying the result of this study.
Purpose: This study was performed to identify the experience of becoming a father of a high risk premature infant. Methods: Grounded theory was used for this research. The participants were 12 fathers who had premature infants lighter than 2,500g of birth weight, less than 37 weeks of gestational age and having stayed 2 weeks or longer in a NICU right after birth. Theoretical sampling was done to identify participants and indepth interviews were done for the data collection. For data analysis, the process suggested by Corbin and Strauss was used. Results: For these participants the core phenomenon of the experience of becoming a father of a high risk premature infant was 'striving through with belief and patience'. The phenomenon was 'being frustrated in an unrealistic shock'. Contextual conditions were 'uncertainty in the health status of the premature baby' and 'no one to ask for help' and intervening conditions were 'possibility in the health recovery of the premature baby' and 'assistance from significant others'. Action/interaction strategies were 'withstanding with belief in the baby' and 'enduring with willpower as head of the family' and the consequence was 'becoming a guardian of the family'. Conclusion: For the participants, the process of becoming the father of a high risk premature infant was striving through the situation with belief in their babies' ability to overcome the crisis and waiting for the babies' recovery with patience.
Communications for Statistical Applications and Methods
/
v.18
no.4
/
pp.433-443
/
2011
We consider a compound Poisson risk model in which the premiums may depend on the state of the surplus process. By using the overflow probability of the workload process in the corresponding M/G/1 queueing model, we obtain the probability that the ruin occurs before the surplus reaches a given large value in the risk model. We also examplify the ruin probability in case of exponential claims.
Due to the increasing complexity of the information systems environment, modern information systems are facing more difficult and various security risks than ever, there by calling for a higher level of security safeguard. In this paper, an information technology security risk management model, which modified by adopting the concept of business processes, is applied to client/server distributed systems. The results demonstrate a high level of risk-detecting performance of the model, by detecting various kinds of security risks. In addition, a practical and efficient security control safeguard to cope with the identified security risks are suggested. Namely, using the proposed model, the risks on the assets in both of the I/O stage(on client side) and the request/processing stage(on server side), which can cause serious problems on business processes, are identified and the levels of the risks are analyzed. The analysis results show that maintenance of management and access control to application systems are critical in the I/O stage, while managerial security activities including training are critical in the request/processing stage.
Choi, Byoung Il;Kim, Jong Hoon;Park, Won Joo;Choi, Chang Ho;Kim, Jin Young
Journal of the Korean Society of Safety
/
v.32
no.6
/
pp.104-109
/
2017
As the ground subsidence occurred at the center of Seoul area in 2014, the ground subsidence phenomenon was emerged as a social issue in Korea. Even so far, national and local governments and related experts have been making a lot of efforts to prevent ground subsidence phenomenon, but it is still happening all over the country. In this study, we chose 9 influence factors on which ground subsidence and derived weights using AHP(Analytic Hierarchy Process) method for ground subsidence risk analysis. And we analyze the risk of subsidence in ${\bigcirc}{\bigcirc}$city using GIS(Geographic Information System) analysis method and evaluate the potential risk.
Recently, needs for extending remaining life and integrity of the aged energy plants are increased since the most domestic plants have been operated over 10 years. This need makes RAM (reliability, availability and maintainability) of the plant become more significant. RBI (risk based inspection) is main technology to increase RAM in energy plants. So far RBI has been developed mainly in the field of process plants (chemical/refinery), underground buried pipelines or nuclear power plants. However, the existing RBI procedure is limited mainly to process plants, it need to be extended to the other energy plants such as fossil power plants. In this study, a general RBI procedure for optimized PM (preventive maintenance) is proposed for various energy plants.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.