Abstract
Recently, needs for extending remaining life and integrity of the aged energy plants are increased since the most domestic plants have been operated over 10 years. This need makes RAM (reliability, availability and maintainability) of the plant become more significant. RBI (risk based inspection) is main technology to increase RAM in energy plants. So far RBI has been developed mainly in the field of process plants (chemical/refinery), underground buried pipelines or nuclear power plants. However, the existing RBI procedure is limited mainly to process plants, it need to be extended to the other energy plants such as fossil power plants. In this study, a general RBI procedure for optimized PM (preventive maintenance) is proposed for various energy plants.
최근 국내의 많은 에너지 플랜트가 10여년 이상 가동되면서 설비의 장수명화 및 노후설비에 대한 건전성 확보에 대한 요구가 증가하고 있다. 이에 따라 플랜트의 RAM (reliability, availability and maintainability)에 대한 중요도가 높아지고 있다. 플랜트의 RAM을 높이기 위해 RBI (Risk Based Inspection)는 중요한 핵심 기술이다. RBI 기술은 주로 정류 플랜트 설비, 매설배관 설비, 원자력플랜트 설비 등의 에너지 플랜트 분야에서 개발이 진행되어 왔다. 하지만, 기 개발된 RBI 절차는 화력 발전플랜트 등 다른 에너지 플랜트에서의 적용이 어려웠다. 본 연구에서는 에너지 플랜트에서의 최적 예방점검을 위한 일반적인 RBI 표준 절차를 개발하여 보고하였다.