Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed (School of Civil, Universiti Sains Malaysia (Engineering Campus)) ;
  • Wong, H.C. (School of Civil, Universiti Sains Malaysia (Engineering Campus))
  • Received : 2012.12.14
  • Accepted : 2013.09.24
  • Published : 2014.03.01

Abstract

Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Keywords

References

  1. W.H. Ting, T.A Ooi, B.K Tan, "Tunnelling Activities in Malaysia: 1995-2005", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2006.
  2. F. Amberg, M. Bettelini, N. Seifert, "Design and Full scale testing for safety of Tunnels and Underground Structures", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2011.
  3. H.K.J Adnan, K.S Mohd, "The Malaysian Construction Industry‟s Risk Management in Design and Build", Journal of Applied Science, vol. 2, no. 5, pp. 27-33, 2008.
  4. C. Boothroyd, J. Emmett, "Risk Management: A Practical Guide for Construction Professionals", Witherby & Co Ltd., London, UK, 1996.
  5. Z. He, "Risk management for overseas construction projects", International Journal of Project Management, vol. 13, no. 4, pp. 231-237, 1995. https://doi.org/10.1016/0263-7863(95)00015-I
  6. British Standard Institution (BSI), "The International Organization for Standardization, BS ISO 31000: Risk Management-Principles and Guidelines", BSI, London, UK, 2009.
  7. N.J Smith, "Managing Risk in Construction Projects", Blackwell Science Ltd., 1999.
  8. M.Y Norazian, H. Adnan, F.O Ahmad, "Clients‟ Perspectives of Risk Management Practice in Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no. 3. pp. 121-130, 2008.
  9. H. Adnan, M.N. Rahmat, F.N.M Nur, "Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no.1, pp. 76-81, 2008.
  10. H.P. Wannick, "A Code of Practice for Risk Management of Tunnel Works: Future Tunnelling Insurance from the Insurers‟ Point of View", Proceedings of International Tunnelling and underground space Association (ITA) Conference, Seoul, Republic of Korea, 2006.
  11. A. Akintoye, E. Fitzgerald, C. Hardcastle, "Risk Management for Local Authorities‟ Private Finance Initiative Projects", RICS, Proceedings of COBRA Conference 1999, vol. 2, pp.81-91, 1999.
  12. P. Reina, W.J Angelo, "Megaprojects need more study up front to avoid cost overruns", McGraw Hill Construction, 2002. (Retrieved in May 2012: http: //flyvbjerg.plan.aau.dk/News%20in%20English/ENR%20Costlies%20150702.pdf)
  13. B. Flyvbjerg, M.S Holm, S. Buhl, "Underestimating costs in public works projects: Error or Lie?", Journal of the American Planning Association, APA, vol. 68, no. 3, pp. 279-295, 2002. https://doi.org/10.1080/01944360208976273
  14. F. Nega, "Causes and effects of cost overrun on public building construction projects in Ethiopia", PhD Thesis, Addis Ababa University, Ethiopia
  15. M.I Al-Khalil, M.A Al-Ghafly, "Delay in public utility projects in Saudi Arabia", International Journal of Project Management, vol.17, no. 2, pp. 101-106, 1999. https://doi.org/10.1016/S0263-7863(98)00020-9
  16. D.W Bordoli, A.N Baldwi, "A methodology for assessing construction projects delays", Journal of Construction Management and Economics, vol. 16, no. 3, pp. 327-337, 1998. https://doi.org/10.1080/014461998372358
  17. D.K Chimwaso, "An evaluation of cost performance of public projects: Case of Botswana", Proceedings of the 2nd International Conference of the CIB, 2000. (Retrieved in June 2011: http: //buildnet.csir.co.za/cdcproc/docs/2nd /chimwaso_dk.pdf)
  18. P.F Kaming, P.O Olomolaiye, G.D Holt, F.C Harris, "Factors influencing construction time and cost overruns on high-rise projects in Indonesia", Journal of Construction Management and Economics, vol. 15, no. 1, pp. 83-94, 1997. https://doi.org/10.1080/014461997373132
  19. H. Liu, "The Analysis of Project Risk Management Based on AHP", Proceedings of 2nd IEEE International Conference on Information and Financial Engineering, pp. 576-579, 2010. (Retrieved in February 2011: http: //ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=5609426&tag=1)